C2 – 5 Solution 2
Solution to part exercise 2-5 With the help of the project configuration plan (process control console, switchroom and field level), draw up two examples of wiring (e. g. simple allocation of the switchroom terminal distributors X200.01 and X200.02), whereby the terminal boxes/field level (X300.01 and X300.02), the assembly levels A and B (switchroom rack) and the terminal distributor X100.01 (process control console) are to be used as additional components.
Process control console (PCC)
PLC
X100.01
2 Measuring transducer E1 E2 A1 A2
1 Measuring transducer E1 E2 A1 A2
1
2
3
4
6
5
3
7
(Terminal distributor))
8
4
(Assembly position 3) (Assembly position 4)
(Assembly level A)
Field level (process)
Switchroom rackl
Switchroom (SR)
A
B
X200.01
1
2
3
4
5
6
7
8
X200.02
1
2
3
4
5
6
7
8
X300.01
1
2
3
4
5
6
7
8
X300.02
1
2
3
4
5
6
7
8
Process
Wiring routing (Part 1) – Project configuration
Festo Didactic • Process Control System
(Assembly level B)
(Terminal distributor)
Terminal box (field level)