PROCESS CONTROL SYSTEM WORKBOOK by FESTO

Page 215

C2 – 5 Solution 2

Solution to part exercise 2-5 With the help of the project configuration plan (process control console, switchroom and field level), draw up two examples of wiring (e. g. simple allocation of the switchroom terminal distributors X200.01 and X200.02), whereby the terminal boxes/field level (X300.01 and X300.02), the assembly levels A and B (switchroom rack) and the terminal distributor X100.01 (process control console) are to be used as additional components.

Process control console (PCC)

PLC

X100.01

2 Measuring transducer E1 E2 A1 A2

1 Measuring transducer E1 E2 A1 A2

1

2

3

4

6

5

3

7

(Terminal distributor))

8

4

(Assembly position 3) (Assembly position 4)

(Assembly level A)

Field level (process)

Switchroom rackl

Switchroom (SR)

A

B

X200.01

1

2

3

4

5

6

7

8

X200.02

1

2

3

4

5

6

7

8

X300.01

1

2

3

4

5

6

7

8

X300.02

1

2

3

4

5

6

7

8

Process

Wiring routing (Part 1) – Project configuration

Festo Didactic • Process Control System

(Assembly level B)

(Terminal distributor)

Terminal box (field level)


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
PROCESS CONTROL SYSTEM WORKBOOK by FESTO by RMC Process Controls & Filtration, LLC. - Issuu