MAJOR PROJECT 12 02 of ________ Plan ________
Project Ref No: A1391-17101-2017 DATE
REV 5
1
D 1
2
3
4
5
6
7a 7
REVISION DESCRIPTION
03/10/2018 UPDATED RAMP TO BASEMENT UPDATED BASEMENT WALL AT FFL02
B
8
9
10
11
12
13
14a 14
15
16
184550 10150
10150
11400
11400
11400
11400
11400
11400
11400
11400
11400
11400
C
13750
50
18250
18200
60% DESIGN REVIEW FRESH AIR INTAKE SHAFT TO BASEMENT (F/A)
LAND OWNER
I
JTC CORPORATION
2400
H
GL PIT
FFL 102.550
FFL 02 (MV)
DP 100
7800
2
3
4
5
16
17
19
18
20
21
G
S
2700
FFL 102.500
23
22
24
DR
25
26
HR
27
1:250
14.90m
FALL
28 29
73
72
71
70
69
68
67
66
112
114
113
115
1:250
140
117
F
118
7850
I.S 05 IL = 101.975 D = 0.53m
27.75m
141
116
139
138
SAVILLS (SINGAPORE) PTE LTD
FFL 102.450
31
20.70m
136
BASEMENT PARKING (MV)
INTERMEDIATE 600 x 600mm SUMP WITH HEAVY DUTY GRATING
142 + 3 CARPARK LOTS (MV)
5050
142
134
132
133
131
130
129
128
127
126
124
125
123
122
121 120
1:200
M.S
I.S 04 IL = 101.95 D = 0.55m
28.00m
119
62
61
60
59
58
57
56
55
54
.1
6m
52
53
51
50
49
48
47
46
45
44
43
42
41
40
39
38
37
36
2700 FFL 102.450
BOUSTEAD PROJECTS E & C PTE LTD
D
S
FFL 102.450 S
CONTRACTOR:
35
50
16
E
4
1:2
2X SMOKE EXTRACTION SHAFT (2.7 X 0.925M) AT 2.2m HT from Basement FFL
TL 103.350
30 CECIL STREET #20-03 PRUDENTIAL TOWER SINGAPORE 049712 TEL: (65) 6415 3871
A
FALL
HR
34
FD
TL 103.350
32 33
135
DATE
PROJECT MANAGER:
30
1:250
137
63
64 IL = 100.12 D = 2.38m
TL 103.350
111
3600
6030 65
S
TL 103.350
110
109
I.S 03
28 MOTORCYCLE LOTS
1500 x 1500mm MAIN SUMP WITH HEAVY DUTY GRATING
FFL 102.450
TL 103.350
108
13800
74
IL = 101.56 D = 0.94m
27.75m
107
..................................
CHIN KIN WEI
(Vice President, Strategic Development)
12600
1:250
106
HR
75
105
FALL
76
104
6000
77
103
2500
FALL
0
6m
1:25
78
102
FD
14.5
FALL
6600 79
101
I.S IL = 101.375 02 D = 1.13m
27.75m
INTERMEDIATE 600 x 600mm SUMP WITH HEAVY DUTY GRATING
0m
80
100
0
81
99
17 CHANGI SOUTH STREET 2 SINGAPORE 486129 LESSEE'S ................................................... ......................... SIGNATURE
82100
1:250
98
97
SCHENKER (SINGAPORE) PTE LTD
G1
6000
FALL
90
96
FALL
89
I.S IL = 101.975 01 D = 0.53m
FD
TL 103.350
15.16m
1:250
FALL
HR
88
95
FFL 102.500
S
2
15
14
15.38m
87
94
12.5
82
FD
13
1:25
83
12
1:250
86
93
DRAIN PIPE FROM WORKSTATION SUMP PIT
84
11
10
2m
9.6
85
92
MV T/A at HIGH LEVEL
A
9
50
DR MV
8
1:2
FL1 (PL)
FFL 01 (MV)
7
FFL 102.500
91
FFL 102.500
6
FFL 102.450
S
S
1
MV T/A at HIGH LEVEL
FD
EL (PL)
FD
FFL 102.450
FALL
FFL 102.681
GRADIENT 1 : 16.6
300
FFL 105.199
GRADIENT 1 : 8.3
HR
5750
FD
S
FFL 102.550
CUT OFF DRAIN WITH HEAVY DUTY GRATING
GRADIENT 1 : 16.6
TL 104.450
FL2 / SL
3000 2060
6850
20904
DP 50
3000
LESSEE
6500
FRESH AIR INTAKE SHAFT (2.7 X 0.86M) AT 2.2m HT from Basement FFL
FD
82 UBI AVENUE 4 #08-01, EDWARD BOUSTEAD CENTRE, SINGAPORE 408832 TEL: (65) 6748 3945 FAX: (65) 6748 9250
5400
STRUCTURAL CONSULTANT:
YH LIEW CONSULTING ENGINEERS
SMOKE EXTRACTION SHAFT (T/A)
17400
750
73 UBI ROAD 1 #07-52 OXLEY BIZHUB SINGAPORE 408733 TEL: (65) 6749 4532
18000
100
17250
925
CONTAINMENT
Email: admin@yhliew.com
FFL 103.250
ARCHITECT:
FALL
FALL
IL 102.650
HA ARCHITECTS PTE LTD 73 UBI ROAD 1 #07-51 OXLEY BIZHUB SINGAPORE 408733 TEL: (65) 6702 3033 FAX: (65) 6702 3009
9600
7365
C S
B
ACCESS TO ABOVE
QP'S ENDORSEMENT:
9000
600mm DEEP SUMP
FRANCIS HWANG HUAT KUONG
A
3
BASEMENT
N
0m 4.0m
20m
40m
SCALE 1: 400
D
B
DATE
(BOA REG. NO. 1391) PROJECT:
PROPOSED ERECTION OF A 7-STOREY SINGLE USER WAREHOUSE DEVELOPMENT WITH BASEMENT CARPARK (BUSINESS 2) ON LOT 5150L MK 31 AT ALPS AVENUE, CHANGI PLANNING AREA TENURE OF LAND
LEASEHOLD
(JTC LAND)
DRAWING TITLE:
BASEMENT FILE NAME:
2
DRAWING NO.:
BP/17170/A/ Scale : AS SHOWN (A1)
REV.:
02 Drawn: NWY
Date: 03/10/2018 THIS DRAWING IS COPYRIGHT
The standard certification is submitted in the form of an electronic record which is signed with a digital signature.
CONTRACTORS SHALL WORK FROM FIGURED DIMENSIONS ONLY. CONTRACTORS MUST CHECK ALL DIMENSIONS ON SITE. DISCREPANCIES MUST BE REPORTED IMMEDIATELY TO THE ARCHITECT.
5