Graduate Portfolio

Page 1

Ricardo Dip Calimano

Graduate Portfolio 2023

Georgia Tech School of Architecture

2-6 7-13 14-35 36-64 Site 160 Forsythe Ave Channelside Portman S101-A118 Integrated Building Systems
Table of Contents

SITE 160

3
5

FORSYTHE AVE

1. Pool Locker Room 2. Pool 3. Pool Restroom 4. Basketball Court 5. Basketball Locker/Restroom 6. Gym 7. Small Studio 8. Large Studio 9. Raquetball Court 10. Large Studio 2 11. Dance Studio 12. Yoga Studio 13. Mirador
1 2 3 4 5 6 7 9 8 10 12 11 13 14
14. Rooftop Garden
11
Structure Diagram

CHANNELSIDE

Ride Culture Co. 15
17
19
21
23
25
27
29
31
33
35

PORTMAN

36

PUBLIC TRANSPORTATION IN ATLANTA

IT IS ABOUT MOBILITY, NOT PROXIMITY.

Although there are limited MARTA transit stops in Atlanta, the bigger issue is mobility after one gets off at a stop.

Bus Routes

MARTA STOPS

Total: 38

HIGHEST WALKABILITY

LOWEST WALKABILITY

MARTA
17 MIN PIEDMONT PARK MIDTOWN 30 MIN KING MEMORIAL EDGEWOOD 32 MIN FERNBANK MUSEUM 10 MIN ARTS CENTER HIGH MUSEUM 10 MIN GA TECH NORTH AVE 2 HR HAMILTON E. HOLMES SIX FLAGS COCA-COLA MUSEUM CIVIC CENTER 13 MIN

NUTRITIOUS FOOD ACCESS IN ATLANTA

Supermarkets MARTA Bus Routes >1/2 MILE >1 MILE >1/4 MILE DISTANCE FROM MARKET >$100,000 <$25,000 22-33% 14-16% INCOME CHRONIC ILLNESSES 16-17% 17-19% 19-22% $75,000-100,000 $50,000-75,000 $25,500-50,000

AREAS WITH LIMITED ACCESS TO NUTRITIOUS, FRESH FOOD ALSO HAVE HIGHER RATES OF CHRONIC ILLNESSES, POVERTY, AND LOWER RATES OF OVERALL MOBILITY

HIGHEST WALKABILITY

LOWEST WALKABILITY

. Supermarkets MARTA Bus Routes Marta Stops >1/2 MILE >1 MILE >1/4 MILE DISTANCE FROM MARKET

HISTORY OF GROVE PARK

Today

1920-1930s

Grove Park was developed by Dr. Edwin Wiley Grove. The streets were named after his family members.

1960s

Donald Lee Hollowell Parkway, Grove Park’s major road, was one of Atlanta’s major corridors.

1970s

POPULATION: 4,700

POVERTY RATE: 30%

UNEMPLOYMENT RATE: 15%

NEARLY 1/3 ADULTS HAVE NO ACCESS TO A VEHICLE.

APPROX. 30% OF ITS RESIDENTS SUFFER FROM CHRONIC ILLNESSES

The area was stable until Atlanta’s suburban growth drained the vitality in the neighborhood. Many small businesses closed and were replaced by low-rent businesses. Simutaneoulsy, the area’s population and property conditions began to decline drastically.

Organizations like the Grove Park Association strive to empower the community and address issues.. Their top priorities include economic development (retail/ grocery), transportation networks, and youth services.

2010-2017

The neighborhood population decreased by 22.57% (from 6,200 residents down to 4,800), despite the Bankhead station being added in 1992.

MOBILITY IS THE SOLUTION.

THESIS

Implementing an internal public transportation system with built-in programming will achieve access to nutritious food, new and existing facilities, and create connection to the rest of Atlanta, and it will intertwine the neighborhood. Using mobility as a solution can improve the health of the residents and support the overall growth of the community.

A neighborhood shuttle system can be utilized in multiple ways: taking residents where they need to go and also bringing necessities to them. A well-located central transportation hub that features a grocery store, retail establishments, access to other modes of mobility, and a small urban farm would anchor the community by providing job opportunities, convenience for commuters, enhanced safety and security and build the community.

OBJECTIVES

INTERTWINE ROUTES

ROOTS ANCHOR

IMPROVE ACCESS TO BANKHEAD STATION PROVIDE ACCESS TO NUTRITIOUS FOOD PROMOTE EXERCISE AND PARK-GOING HELP THE NEIGHBORHOOD PROSPER BRING GOODS + SERVICES TO THOSE IN NEED
BANKHEAD
W ESTSDE RESERVOR PAR K MIDTOWN
MIDD E + HIGH SC OOL
STATION COMMUNITY THEATRE
DOGWOOD LIBRARY
BELTLINE TRAILHEAD
Proposed Hub
K-5 SCHOOL
YMCA
OUTDOOR RECCENTER
MICROSOFT CAMPUS

EXISTING MARTA BUS SYSTEM

Unhealthy Food Options Convenience Stores + Fast Food MADDOX PARK JOSEPH BOONE PARK DOGWOOD LIBRARY CENTER HILL PARK GROVE THEATRE SHALOMCITY CHURCH YMCA WESTSIDE RESERVOIR MICROSOFT CAMPUS BANKHEAD STATION
Joseph E. Boone Donald Lee Hollowell

BRANCHING OUT FROM EXISTING INFRASTRUCTURE

Joseph E. Boone Donald Lee Hollowell
Average Commute to Westside Reservoir Park 8:00 AM 5:00 PM TOTAL COMMUTE: 37 MIN TOTAL COMMUTE: 45 MIN HOME NEAREST BUS STOP 16 MIN HOME NEAREST BUS STOP 8:00 AM 5:00 PM TOTAL COMMUTE: 39 MIN TOTAL COMMUTE: 47 MIN HOME NEAREST BUS STOP 16 MIN HOME NEAREST BUS STOP Average Commute to Bankhead Station Average Commute to Westside Reservoir Park 8:00 AM 5:00 PM TOTAL COMMUTE: 19 MIN TOTAL COMMUTE: 22 MIN HOME NEAREST BUS STOP 16 MIN HOME NEAREST BUS STOP 8:00 AM 5:00 PM TOTAL COMMUTE: 16 MIN TOTAL COMMUTE: 24 MIN HOME NEAREST BUS STOP 16 MIN HOME NEAREST BUS STOP 25 MIN 12 MIN 30 MIN 12 MIN 12 MIN 27 MIN 4 MIN 15 MIN 4 MIN 12 MIN 35 MIN 4 MIN 4 MIN 18 MIN 20 MIN CURRENT PROPOSED
Average Commute to Bankhead Station

PROPOSED ROUTE I: FOOD DELIVERY

Giving food establishments in the community an opportunity to offer healthier options.

Food Options Convenience Stores + Fast Food BANKHEAD STATION
Unhealthy
Joseph E. Boone Donald Lee Hollowell

PROPOSED ROUTE II: PARKS + SCHOOLS

Offers transportation to all the parks in and around Grove Park.

MIDDLE+HIGH SCHOOL

WESTSIDE RESERVOIR

ELEMENTARY SCHOOL

WESTSIDE RESERVOIR MADDOX PARK
WESTSIDE RESERVOIR CENTER HILL PARK
BANKHEAD STATION
JOSEPH BOONE PARK

PROPOSED ROUTE III: COMMUNITY

Focuses on transporting residents to important community centers.

HOLSEY TEMPLE

DOGWOOD LIBRARY

FOUNTAINOF PRAISE

SHALOMCITY CHURCH

DIXIEHILLS BAPTIST CHURCH

EZRAMETHODIST CHURCH

THEATRE
GROVE
YMCA BANKHEAD STATION

ANCHOR AND INTERTWINE THE NEIGHBORHOOD.

Outreach Points
Hub
Central
Joseph E. Boone Donald Lee Hollowell

POINTS OF OUTREACH

FOOD DELIVERY

USING THE SHUTTLE SYSTEM IN MORE THAN ONE WAY

“BOOKS ON WHEELS” + TUTORING

PERFORMANCE STAGE

CAFEON WHEELS

SELF-DRIVING ELECTRIC SHUTTLE

ABILITY TO CONVERT INTO POP-UP SHOPS, RESTAURANTS AND OTHER SERVICES.

THE
SHUTTLE AS A PROGRAM

CONNECTING THE COMMUNITY

Public Transportation

FOOD PICKUP + DELIVERY BIKE RENTALS

Economic Growth

Improved Health

HUB CALENDAR

SHUTTLE POP-UPS

SHUTTLE SCHEDULE MARTA SCHEDULE

STAKEHOLDERS

EVENTS

NEAR ME REQUEST SERVICE

CENTRAL TRANSPORTATION HUB

Providing job opportunities, convenience for commuters, access to healthy food and alternate forms of mobility, revenue for the shuttle system, enhanced saftey and security, and community-building.

PROGRAMS

GROVE PARK

NATURE CENTER URBAN FARM

URBAN FARM

CLASSROOM

DONALD LEE HOLLOWELL PKWY

SHUTTLE WAITING

COMMUNITY THEATRE

VEHICLE CHARGING

CAR SHUTTLE CHARGING/ BIKE + SCOOTER PATHS

OUTDOOR SPACE + COMMUNITY THEATRE

OUTDOOR GATHERING SPACE

FOOD MARKET + CAFE OUTDOOR THEATRE

FOOD MARKET + SMALL CAFE

YMCA KIPP ELEMENTARY SCHOOL
HORTENSE PL NW

INITIAL PROGRAM FORM SKETCHES

Pedestrian Ribbon Shuttle Ribbon Combined Paths

Determined Program

Pedestrian Circulation

Ground Level

Pedestrian Circulation

Upper Level

URBAN FARM

LEVEL II

PEDESTRIAN PATH

LEVEL I

PEDESTRIAN PATH

OUTDOOR THEATRE

SHUTTLE WAITING

OUTDOOR GATHERING SPACE

CLASSROOM

LEVEL I

SHUTTLE PATH

FOOD MARKET + CAFE

VEHICLE CHARGING

HOLLOWELLPKWY
DONALDLEE
COMMUNITY THEATRE KIPP ELEMENTARY SCHOOL
PARK NATURE CENTER 2 1 3 6 7 8 9 4 5 1 2 3 4 5 6 7 8 9
YMCA GROVE
OUTDOOR THEATRE + STAGE PLUG-IN CAR +SHUTTLE PARKING COVERED SHUTTLE WAITING SUSPENDED OUTDOOR CLASSROOM URBAN FARM PARKING + FOOD DELIVERY/PICK UP FOOD MARKET OUTDOOR GATHERING SPACE
LEVEL + 18’
VEHICLE CHARGING
GROUND
COMMUNITY THEATRE KIPP ELEMENTARY SCHOOL YMCA GROVE PARK NATURE CENTER 1 2 3 4 ELEVATED GARDEN COVERED VENDOR SPACE OUTDOOR SEATING SUSPENDED OUTDOOR CLASSROOM 1 2 3 4 BRIDGE LEVEL
FOOD MARKET COVERED SHUTTLE WAITING SHUTTLE PICK UP OUTDOOR GATHERING SPACE
SECTION FACING SOUTH
PAVILION
BRIDGE
BRIDGE
OUTDOOR THEATRE SECTION FACING EAST OUTDOOR THEATRE FOOD MARKET OUTDOOR GATHERING SPACE

PRIMARY MATERIALS + ENERGY EFFICIENT BUILDING

SLASH PINE

Renewable Resource (grows quickly)

Strong + Resistent to Decay

Natural Insulator

Locally Sourced

STAINLESS STEEL

Indefinitely Recyclable

Highly Durable

Non-Toxic

ASPHALT PATHS

Reclaimed from Previous Roads

18-20 Year Life Span

Emits Fewer Greenhouse Gases than Concrete

Compost Replaced Wood to Create

Nutrient-Rich Soil for the Urban Farm

Salvage + Reuse Replaced Materials

Recycled Wood Material Can be Used as A Biomas Fuel Source

High-Performance Glazing w/ Low-E Coating

Building Oriented on an East-West Axis

Green Roof Provides a Living Layer of Insulation, Aiding w/ Amount of Heat Transfer

LOW-IMPACT MATERIALS RESPONSIBLE
METHODS

Integrated Building Systems

OF
MARQUEZ HALL Ricardo Dip IBS2 Phase 4 Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL Cover BohlinCywinski Jackson + Anderson Mason Dale Architects OPA Design Author: Ricardo Dip Address: 16th St, Golden, CO 80401
COLORADO SCHOOL
MINES

S101-122 - Structure Documents

A097-Plan View of Marquez Hall

A098-Axonometric View with Subject Area

A099-Real Life View with Subject Area

A100-Axonometric View

A101-Axonometric View

A102-Axonometric View

A103-Axonometric View

A104-Axonometri Views (3)

A105-Basement Side Window Detail

A106-Basement Wall Detail

A107-Corner Window Detail

A108-Curtain Wall Assembly Detail @ First Floor

A109-Window Wall Detail @ First Floor

A110-Roof Curtain Wall Detail

A111-Axonometric View

A112-Axonometric View (Cladding)

A113-Axonometric View (Windows)

A114-Wall Detail @ First Floor

A115-Wall Detail @ First Floor

A116-Wall Detail @ Second Floor

A117-Wall Detail @ Roof Floor

A118-Wall Pannels Detail

Index
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S101 Axonometric view - SW AXONOMETRIC VIEW SOUTH WEST 1
Team
members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S102 AXONOMETRIC VIEW SOUTH EAST 1 Axonometric view - SE
Team
members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S103 AXONOMETRIC VIEW NORTH WEST 1 Axonometric view - NW
Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Team members:
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S104 AXONOMETRIC VIEW NORTH EAST 1 Axonometric view - NE
Team
members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip

Construction sequence 01

Construction Sequence

Level 01- Footings and Piles

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL
S107
1
Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo
Team members:
Dip

Construction sequence - 02

Construction Sequence

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL
S108
Level
retaining walls 1
Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
02- Basement
Team members:

Construction sequence - 03

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S109
Level 03- Floor 01 1
members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Construction Sequence
Team

Construction sequence - 04

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S110
Level 04- Floor 02 1
members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Construction Sequence
Team

members:

Construction Sequence

Construction sequence - 05

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL
S111
Team Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S112
Level 05- Mechanical Floor 1
members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Construction sequence - 06 Construction Sequence
Team

Lateral load systems

Lateral

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S113
Team members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
load systems Structural piles 1

Lateral load systems

Lateral load systems

Shear walls 1

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S114
Team members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip

Lateral

Lateral load systems

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S115
1
Team members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Structural framing
load systems

Lateral load systems

Lateral load systems

Structural columns

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S116
Team members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
1
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S117
Overall structure 1
systems
Team members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Lateral load systems Lateral load

Date: 20th Feb’2023

Team members:

Nandini Dave

Tyler Frost

John Wilson

Sina Khoshbayan

Ricardo Dip

Foundation Details

Integrated Building Systems
ARCH - 7102 PHASE 2
COLORADO SCHOOL OF MINES MARQUEZ HALL S118
1

Date: 2nd MAY 2023

Team members:

Nandini Dave

Tyler Frost

John Wilson

Sina Khoshbayan

Ricardo Dip

Braced Connections

Integrated Building Systems
-
PHASE 4
ARCH
7102
COLORADO SCHOOL OF MINES MARQUEZ HALL S119

Date: 2nd MAY 2023

Team members:

Nandini Dave

Tyler Frost

John Wilson

Sina Khoshbayan

Ricardo Dip

Cantilever Detail

Integrated Building Systems
4
ARCH - 7102 PHASE
COLORADO SCHOOL OF MINES MARQUEZ HALL S120

Braced Connections

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S121
Team members: Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip

members:

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL S122 Moment Connection
Team Nandini Dave Tyler Frost John Wilson Sina Khoshbayan Ricardo Dip
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 Axonometric view - NE COLORADO SCHOOL OF MINES MARQUEZ HALL A097 PLAN VIEW
1 Ricardo Dip
View of Marquez Hall
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A098 Axonometric view - NE AXONOMETRIC VIEW NORTH EAST WITH SUBJECCT AREA ENHANCED 1 Ricardo Dip
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A099 Axonometric view - NW AXONOMETRIC VIEW Marquez Hall Subject Area 1 Ricardo Dip

North East Facade CUrtain Wall Assembly Aluminum Plate Shading Baguette Armature Bolted to Window Fram Assembly with MFR Stud Clip Window Wall

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A100 Axonometric view - NE AXONOMETRIC VIEW NORTH EAST 1 Ricardo Dip 1 2 3
3
1 2
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A101 Axonometric view - NW AXONOMETRIC VIEW NORTH WEST 1 Ricardo Dip 1 2 3 1 2 3 Concrete Shear Wall Concrete Shear Wall Terra Cotta Panel
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A102 Axonometric view - SE AXONOMETRIC VIEW SOUTH EAST 1 Ricardo Dip 1 2 3 1 2 3 6” Roof Slab Diaphragm Ceiling Framing Anchored to Corrugation and Wall Framing 6” Floor Slab
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A103 Axonometric view - SW AXONOMETRIC VIEW SOUTH WEST 1 Ricardo Dip 1 2 3 1 2 3 Concrete Shear Wall Main Support Beam Concrete Exterior Pavement
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A104 AXONOMETRIC VIEW SOUTH EAST Ricardo Dip Axonometric views AXONOMETRIC VIEW NORTH WEST AXONOMETRIC VIEW NORTH EAST 1 1 1 1 1 1 A107 A105 A106 A109 A108 A110 1 A100 1 A101 1 A102

BASEMENT SIDE WINDOW DETAIL

Integrated Building Systems ARCH - 7102 PHASE 3 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A105
Side Window Detail
Basement
1-1/2” = 1’-0” 1 Ricardo Dip 1 2 3 4 5 3 5/8” x 1 1/2” Stud Wall Framing Concrete Shear Wall Cladding Framing 6” Floor Slab Exterior Paved Walkway 1 2 3 4 5
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A106 Basement Wall Detail BASEMENT WALL DETAIL 1-1/2” = 1’-0” 1 Ricardo Dip 1 2 3 4 5 1 2 3 4 5 6” Deep Corrugated
Main Support Beam 3 5/8” Metal Frame Assembly 3 5/8” x 3” Heavy Duty Head Framing Metal Plate Sill at Window Wall 1 A114
Metal Decking

Window Assembly Mullion Anchored to Wall

Window Assembly Corner Mullion Anchored to Window Wall

Aluminum Plate Shading Baguette Armature Bolted to Window Fram Assembly with MFR Stud Clip

9 1/2” Window Wall Mullion Bracketed to Beam

5

Cold Roll Channel Window Wall System Bridge Support

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A107 Corner Window Detail CORNER WINDOW DETAIL 1-1/2” = 1’-0” 1 Ricardo Dip 1 2 3 4 5 1 2 3 4

CURTAIN WALL ASSEMBLY DETAIL @FIRST FLOOR 1-1/2” = 1’-0”

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A108 Curtain Wall Assmebly Detail
1 Ricardo Dip 1 2 3 4 5 Window Wall Anchor Bracket Bolted to Plate Main Support Beam Window Wall Assembly 3 1/4” Heavy Duty Framing Metal Plate Sill at Window Wall 1 2 3 4 5

1 2 3 4 5

Heavy Duty Window Frame Mullion Bolted to Wall Window Wall Assembly

Extruded ALuminum SIll Glaze Into Window Wall

9 1/2” Curtain Wall Mullion Bracketed to Beam

Extruded Non-Continuous Aluminum Support Clip

Main Support Beam

WINDOW WALL DETAIL @FIRST FLOOR 1-1/2” = 1’-0”

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A109 Curtain Wall Detail
1 Ricardo Dip 1 2 3 4 5
Note: More details shown in A115

.080” Aluminum Coping

9 1/2” Curtain Wall Mullion with Roof Coping

Ceiling Framing Anchored to Corrugation and Wall Framing

3 3/4” Heavy Duty Framing Forming Window Wall System

Window Frame Mullion Bolted to Wall

MFR Stud Clip Assembly Bolted to Window Fram Assembly

ROOF CURTAIN WALL DETAIL

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A110 Roof Curtain Wall Detail
1-1/2” = 1’-0” 1 Ricardo Dip 1 2 3 4 5
1 2 3 4 5 MFR = Manufacturer 1 A116
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A111 Curtain Wall Detail Axonometric View South East 1 Ricardo Dip 1 A114 1 A115 1 A116 1 A117

Note: “Aluminum Plate Shading Baguette Armature Bolted to Window Fram Assembly with MFR Stud Clip”, shown in grey.

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A112
Detail Ricardo Dip Axonometric View South East 1
Cladding
Integrated Building Systems ARCH 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A113 Window Walls Ricardo Dip Axonometric View South East 1 Note: Windows shown in blue.

Note: All details shown are inside conrete walls and behind wall pannels. (Shown in A118)

1 2 3 4

Fluid Applied Air Barrier Spray Polyurethane Foam Insulation

Blocking/Shim Fill Void With Spray Foam Self Adhered High Temp Sheet (not visible in iso view)

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A114 Curtain Wall Detail WALL DETAIL @FIRST FLOOR 1-1/2” = 1’-0” 1 Ricardo Dip 1 2 3
4

1 2 3

Blocking/Shim Fill Void With Spray Foam

Fluid Applied Air Barrier

Spray Polyurethane Foam Insulation

Integrated Building Systems ARCH -
PHASE 4
COLORADO SCHOOL OF MINES MARQUEZ HALL A115 Curtain Wall Detail
DETAIL @FIRST FLOOR 1-1/2” = 1’-0” 1
1 2 3
7102
Date: 2nd MAY 2023
WALL
Ricardo Dip
Note: All details shown are inside conrete walls and behind wall pannels. (Shown in A118)

Note: All details shown are inside conrete walls and behind wall pannels. (Shown in A118)

1 2 3 4

Aluminum Brake Metal

Fluid Applied Air Barrier

Spray Polyurethane Foam Insulation

Spray Foam

WALL DETAIL @SECOND FLOOR 1-1/2”

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A116 Curtain Wall Detail
Ricardo Dip
= 1’-0” 1
1 2 3 4

Note: All details shown are inside conrete walls and behind wall pannels. (Shown in A118)

1 2 3 4 5

Self Adhered High Temp Sheet

Alum Reglet

Base Flashing

Spray Polyurethane Foam Insulation

Fluid Applied Air Barrier

Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A117 Curtain Wall Detail
DETAIL @ROOF FLOOR 1-1/2” = 1’-0” 1 Ricardo Dip 1 2 3 4 5
WALL
Integrated Building Systems ARCH - 7102 PHASE 4 Date: 2nd MAY 2023 COLORADO SCHOOL OF MINES MARQUEZ HALL A118 Curtain Wall Detail WALL DETAIL @SECOND FLOOR 1-1/2” = 1’-0” 1 Ricardo Dip
Note: Wall Pannels are in yellow

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.