Welding — Method Statement & Risk Assessment Mechanical · Welding · Document ref RAMS-HOT-WELDING-V1 · Rev A · Issued 7 Jun 2026 · Library reviewed 6 Jun 2026
Free template — make it site-specific before you use it This is the generic Welding RAMS template from RamsDocs. Principal contractors reject documents that aren't site-specific: fill in your site details, toggle the hazards that apply and download a submission-ready PDF free at ramsdocs.co.uk/builder.
Project control details SITE ADDRESS *
PRINCIPAL CONTRACTOR / CLIENT *
YOUR COMPANY (CONTRACTOR) *
To be completed
To be completed
To be completed
WORK LOCATION ON SITE *
START DATE *
FIRST AIDER (NAME) *
To be completed
To be completed
To be completed
EMERGENCY ASSEMBLY POINT *
PREPARED BY *
SITE SUPERVISOR / COMPETENT PERSON *
To be completed
To be completed
To be completed
REVIEW DATE *
To be completed
Scope of works Manual metal arc (MMA), MIG/MAG and TIG welding of mild and stainless steel components, plus oxy-fuel gas welding where used, carried out within the agreed work area under a hot work permit. Covers welding-fume extraction and respiratory protection, screening of adjacent operatives, management of welding sets and gas cylinders, and the fire watch on completion. Excludes weld procedure qualification and NDT/weld inspection.
Risk assessment HAZARD
INITIAL
RESIDUAL
Welding fume inhalation (carcinogenic)
16
6
Fire from hot works / ignition of combustibles
20
5
Arc flash, short circuit and electrical burns
12
4
Electric shock from live conductors or isolation failure
15
4
Compressed gas cylinders — leak, flashback or cylinder fall
12
3
Confined space atmosphere hazard
20
5
Noise exposure above action values
9
3
Risk score = likelihood (1–5) × severity (1–5). Bands: 1–4 low · 5–9 medium · 10–15 high · 16–25 very high. Residual assumes the stated controls are in place.
Free RAMS template — ramsdocs.co.uk
Page 1 of 6