Scaffold erection — Method Statement & Risk Assessment Scaffolding · Scaffold erection · Document ref RAMS-SC-ERECTION-V1 · Rev A · Issued 7 Jun 2026 · Library reviewed 4 Jun 2026

Free template — make it site-specific before you use it This is the generic Scaffold erection RAMS template from RamsDocs. Principal contractors reject documents that aren't sitespecific: fill in your site details, toggle the hazards that apply and download a submission-ready PDF free at ramsdocs.co.uk/builder.

Project control details SITE ADDRESS *

PRINCIPAL CONTRACTOR / CLIENT *

YOUR COMPANY (CONTRACTOR) *

To be completed

To be completed

To be completed

WORK LOCATION ON SITE *

START DATE *

FIRST AIDER (NAME) *

To be completed

To be completed

To be completed

EMERGENCY ASSEMBLY POINT *

PREPARED BY *

SITE SUPERVISOR / COMPETENT PERSON *

To be completed

To be completed

To be completed

REVIEW DATE *

To be completed

Scope of works Erect access scaffold to TG20/design.

Risk assessment HAZARD

INITIAL

RESIDUAL

Fall from height during installation or work at height

20

5

Falling objects from working at height

20

5

Scaffold collapse or structural instability

20

5

Manual handling — heavy or bulky items

12

4

Contact with overhead electric lines or cables

20

5

Public interface — occupied premises and occupant disruption

12

4

Slips, trips and falls at same level

12

4

Scaffold tube and fitting ejection from vehicles or plant

6

3

Ladder instability or unsafe access equipment

12

4

Risk score = likelihood (1–5) × severity (1–5). Bands: 1–4 low · 5–9 medium · 10–15 high · 16–25 very high. Residual assumes the stated controls are in place.