MEWP / cherry picker — Method Statement & Risk Assessment Access · MEWP / cherry picker · Document ref RAMS-WAH-MEWP-V1 · Rev A · Issued 7 Jun 2026 · Library reviewed 6 Jun 2026
Free template — make it site-specific before you use it This is the generic MEWP / cherry picker RAMS template from RamsDocs. Principal contractors reject documents that aren't sitespecific: fill in your site details, toggle the hazards that apply and download a submission-ready PDF free at ramsdocs.co.uk/builder.
Project control details SITE ADDRESS *
PRINCIPAL CONTRACTOR / CLIENT *
YOUR COMPANY (CONTRACTOR) *
To be completed
To be completed
To be completed
WORK LOCATION ON SITE *
START DATE *
FIRST AIDER (NAME) *
To be completed
To be completed
To be completed
EMERGENCY ASSEMBLY POINT *
PREPARED BY *
SITE SUPERVISOR / COMPETENT PERSON *
To be completed
To be completed
To be completed
REVIEW DATE *
To be completed
Scope of works Use of a self-propelled or trailer mobile elevating work platform (scissor, vertical mast or articulated boom / cherry picker) to provide a temporary working platform at height, including familiarisation, ground assessment, operation and emergency recovery. Covers entrapment, overturning, segregation from traffic and the rescue of a stranded or incapacitated operator. Does not cover using the MEWP to lift materials as a crane.
Risk assessment HAZARD
INITIAL
RESIDUAL
Operator entrapment or crushing against an overhead structure
15
5
MEWP overturning on soft, sloping or undermined ground
15
5
Operator stranded at height requiring rescue
10
4
Contact with overhead electric lines or cables
10
5
Plant and vehicle collision with pedestrians or workers
12
4
Risk score = likelihood (1–5) × severity (1–5). Bands: 1–4 low · 5–9 medium · 10–15 high · 16–25 very high. Residual assumes the stated controls are in place.
Free RAMS template — ramsdocs.co.uk
Page 1 of 5