3/9/2017
Simplex Table
Coming up with the first simplex table
Interpreting the last simplex table
Steps: 1. Convert each inequality constraint into equation by adding a slack variable. 2. Set real variables equal to zero. 3. Build simplex table. • Put variables with values into basic variable column and write their corresponding values in the quantity column. • Write coefficients of all equations into the body of the table. • Calculate Z and C – Z.
Things to interpret: 1. Optimal solution. 2. Resources. • The utility • Shadow price • Change in the original amount 3. Special case: more than one optimal solution.
1