FIRST FLOOR
MEDITATION ROOM
414
COVERED PATIO
375
CORRIDOR
420
OFFICE 1
140
OFFICE 2
144
OFFICE 3
144
BATHROOM (MEN)
64
BATHROOM (WOMEN)
64
CORRIDOR
627
LOBBY
200
VESTIBULE
200
APPARATUS BAY
1332X4
STORAGE
1332
PARKING
46,305
A0.0 A1.1 A1.2 A1.3 A1.4 A1.5 A1.6 A1.7 A1.8 A1.9 A2.1 A2.2 A2.2 A2.3 A2.4 A2.5 A2.6
SECOND FLOOR
-
COVER SHEET
ARIZONA
SITE PLAN FLOOR PLAN PROGRAM PLAN FLOOR PLAN PROGRAM PLAN ROOF PLAN CIRCULATION CIRCULATION 3D CIRCULATION
912
CAPTAIN’S DORM
140
DORMS
100
LAUNDRY
144
LIBRARY
220
BATHROOM (MEN)
80
BATHROOM 1 (WOMEN)
80
RADIO ROOM
100
JANITOR’S CLOSET
30
ELECTRICAL ROOM
25
GYM
760
PATIO
375
FIRST FLOOR IS CALCULATED FROM INTERIOR FACE OF STUD WALL & INCLUDES STAIRS / EXCLUDES OPENINGS TO BELOW.
TRAINING ROOM
1000
SECOND FLOOR IS CALCULATED FROM INTERIOR FRAME OF STUD WALL & EXCLUDES STAIRS / EXCLUDES OPENINGS TO BELOW.
A4.1 A4.2 A4.3 A5.1
-
THE HE R BE R G E R INS TITUTE
480-965-3536 design.asu.edu PO Box 871605 Tempe, AZ 85287-1605
ADE 522
STRUCTURE PLAN STRUCTURE PLAN 3D STRUCTURE HVAC HVAC M.E.P. M.E.P.
GREAT ROOM
A3.1 A3.2
STATE UNIVERSITY
ELEVATION ELEVATION
-
SITE SECTION BUILDING SECTION DETAILS
-
DIAGRAMS
FIRE STATION
SQ. FT
THE DESIGN SCHOOL
AHWATUKEE FOOTHILLS VILLAGE PHOENIX, AZ - 85045
AREA SCHEDULE
SHEET INDEX
SITE #62
SITE #62 SQ.FT CALCULATIONS
PROJECT BY: QUENTIN MILLER
SITE #62 SQ.FT CALCULATIONS RULES OF MEASUREMENT
INSTRUCTOR: ED SOLTERO ISSUE DATE: 2020.04.17
COVER SHEET
A0.0 ©
Copyright 2020
A.S.U - The Design School