Formwork Inspection Checklist Before Shuttering Work

Page 1

Formwork Inspection Checklist Before Shuttering Work It is very crucial to maintain proper checklist prior to commencement of shuttering work planned at the site. Essentially, it is also known as formwork shuttering. Shuttering is a section of the construction works of civil engineering as shuttering facilitates the structure to attain its required shape. The formwork will be retained minimum 24 hours to 48 hours after the concrete is poured in its supporting locations. But the removal time is also based on the type of the concert weight, the length of the sample and some other factors as well.

If the shuttering is removed too quickly after it has been installed, there may be an accident at the site. To maintain the safety of the construction, the shuttering checklist of formwork plays a vital role. Normally, the shuttering is applied in concrete construction New concrete is then poured to be solidified. It carries several types of dead and live loads throughout construction. If the shuttering is not set perfectly, the quality of concrete quality is hampered.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.