ARCHITECTURAL PORTFOLIO
SELECTED WORKS 2020-23
PUSHTI SHAH
PUSHTI SHAH
DOB: 08/08/2002
Email: pushtishah08@gmail.com 20bar029@nirmauni.ac.in
Mobile No.:
9106698189
Residence: 15,Preet Bungalows, Chhani,Vadodara,Gujarat
EDUCATION
2020-Present:
Institute of Architechture,Nirma University (Currently in 3rd year of B.Arch.)
2006-2020
Navrachana School Sama,Vadodara
DIGITAL SKILLS
Autodesk Autocad
Autodesk Revit
Sketchup
Enscape
Adobe Photoshop
Adobe Indesign
Rhinocerous 3D
Grasshopper
Arc GIS
MANUAL SKILLS
Sketching
Hand Drafting
Hand Modelling
Laser Cutting
RELATED STUDY PROGRAMS
2021-Measure Draw,Pol House, Ahmedabad
2022-Italy and France
2023-Costford Workshop, Laurie Baker Centre,Kerala
WORKSHOPS
Hands on Workshop at LBC
Pottery
Print Making
Graphic Signage
Sketchup+Enscape
3D Printing
BIM
Sketching
INTERESTS
Painting,Trekking and Hiking,Dancing
LANGUAGES KNOWN
Gujarati
English Hindi
2
3 CONTENTS
By The River Institution Studio Working Drawing ‘Aman’ Material Studio Detangled Housing Studio Redefined Trail Contextual Studio Heritage City Documentation Related Study Program 2021 Exploratory Rsp France And Italy 2022 Hands On Workshop Lbc,Kerala,2023 Miscellaneous 4-11 12-15 16-19 20-25 26-29 30-33 34 36-41 35
Courts
COURTS BY THE RIVER
Semester V-Institution Studio
Location-Riverfront,Ahmedabad(opposite ravivari market)
Year-2022
Project-Architechture Incubation Centre
Area-5000 sqm
5
CONCEPT AND PROCESS
The programme was to build an Architechture Incubation Centre for the architechture community of India,which can be used as a cultural and convention centre,exhibition space and as a space for exploring and research in various fields and disciplines of architechture and sharing the same to the community through meetings and conferences.
CONCEPT MODEL IMPRESSIONS
As seen throughout the models,creating small courts inside the space was a crucial element of the project.These would enhance the user experience by creating an extension to the various private spaces.Another important element created through this would be the semi open circulation spaces,promoting interaction at various levels.
VARIATIONS IN FORM AND SHAPE
VARIATIONS IN CIRCULATION AND ARRANGEMENT
6
RIVER LVL +300 P
|SEMESTER V
SECTION AA THROUGH THE SITE
The site is located beside the promenade of the Sabarmati Riverfront,on the eastern part of the city,providing a beautiful backdrop of the old heritage city on the east,while the modern skyline of the city and Sabarmati to its west..It is a well connected site in terms of approach from various parts of the city and is nearby major landmarks like Atal Footover bridge and Ellisbridge.
7 1
Towards Atal Footover Bridge
Towards Ellisbridge
1.Sabarmati River
2.Riverfront Lower Promenade
3.Selected site
4.Vacant plot
7.Sunday Ravivari Market
8.Riverfront Walkway
SITE PLAN
3 5 2 4 6 8 7 A A
LEGEND:
5.Raikhad Gate
6.Raikha area
8 GROUND FLOOR PLAN B B |SEMESTER V
Vertical circulation
EXPLODED VIEW OF THE PROJECT
This shows the various spaces created within,ranging from double height spaces,courtyards and semi open circulation.
10
|SEMESTER V
PERSPECTIVE SECTION BB
11
WORKING DRAWING (Ongoing
GROUND FLOOR PLAN
Semester)
12
3000 3000 9000 3000 9000 3000 9000 9000 3000 6000 6000 6000 6000 6000 6000 6000 6000 3000 6000 6000 6000 33000 60000 300 300 2750 6000 UP UP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 A B C D E F G A B C D E F G 6000 300 5700 300 5700 300 5700 300 5700 300 2700 300 530 630 530 1210 530 630 530 1410 1110 630 1110 630 1110 1410 1110 630 1110 630 1110 1990 530 2370 530 2570 1110 1210 1110 2570 530 1210 UP COA Director Office 5800x5800 +950 +900 S.B. +4900 Directors Office 5800x5800 +950 +900 S.B. +4900 Toilets 8800x5800 +950 +900 S.B. +4900 Conf. Room 1 8800x5800 +950 +900 S.B. +4900 Big Hall 17700x8800 +950 +900 S.B. +4900 Archives 8800x5800 +950 +900 S.B. +4900 Corridor 23800x3050 +950 +900 S.B. +4900 Conf. Room 2 8800x5800 +950 +900 S.B. +4900 Recording Room 5800x5800 +950 +900 S.B. +4900 Kitchen+Counter 5800x5800 +950 +900 S.B. +4900 Canteen 11800x5800 +950 +900 S.B. +4900 Library 11800x8800 +950 +900 S.B. +4900 A.V. Room 8800x8800 +950 +900 S.B. +4900 Courtyard 8700x8520 +700 OTS Corridor 27300x3050 +950 +900 S.B. +4900 Reception 8800x5950 +950 +900 S.B. +9050 Courtyard 8700x5700 +700 OTS Toilets 8800x5800 +950 +900 S.B. +4900 Corridor 20800x3050 +950 +900 S.B. +9050 Courtyard 5700X3000 +700 OTS Double Height Double Height Double Height Corridor 15000x3050 +950 +900 S.B. +4900 LVL 00 LVL 900 9000 3000 300 300 2700 2700 363 300 2700 300 2700 300 2700 300 2700 300 5700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 400 4940 1060 7940 1060 9300 2700 300 8700 300 3000 8700 300 2750 200 8800 200 450 300 2700 300 5700 300 5700 300 5700 300 5700 300 5700 300 475 300267 2700 300 555 1210 530 1790 1110 300505 1185 530 2370 530 1990 1110 630 1110 630 1110 805 605 530 630 530 1210 530 630 530 1410 530 630 530 1210 530 630 1335 9300 12000 12000 33000 W1 W1 W1 3 W1 W1 5 W1 6 W1 7 W1 W1 9 W1 10 W1 11 W1 12 W1 13 W1 14 W1 15 W1 16 W1 17 W1 18 W1 19 W2 1 W2 2 W2 5 W2 6 W2 7 W2 8 W2 W2 4 W2 10 W2 9 W2 11 W2 14 W2 13 W2 17 W2 16 W2 15 W2 12 W2 18 W3 1 W3 2 W3 3 W3 4 W3 5 W3 6 W3 7 W4 1 W4 W4 3 W4 4 W4 5 W4 6 W4 7 W4 8 W4 11 W4 10 W4 13 W4 12 W4 9 1 A201 1 A201 2 A201 2 A201 D1 1 D1 2 D1 3 D1 D1 5 D1 6 D1 9 D1 7 D1 8 D2 D2 D2 3 D2 D3 1 D3 D3 3 A301 2 A301 2700 2700 2700 2700 300580 1540 7460 1540 580 300 2700 300 2700 300 2700 300 455 580 1540 930 1010 580 1010 400 1010 580 1010 400 1010 580 1010 350580 1540 1460 1540 4460 1540 1460 1540 880 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 2700 300 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 60000 1500 8276 3450 5850 WS1 WS2 GENERAL NOTES: THIS DRAWING AND DESIGN ARE THE SOLE PROPERTY OF PUSHTI SHAH AND SHALL NOT BE TRACED, COPIED, LENT, REPRODUCED, MODIFIED OR MADE UNAUTHORISED USE IN ANY MANNER WITHOUT THE WRITTEN CONSENT OF THE FIRM. 1. ALL THE DIMENSION ARE IN MM. 2. ALL THE DIMENSIONS SHALL BE READ AND NOT SCALED. 3. DIMENSIONS IN DRAWINGS TO A LARGE SCALE SHALL TAKE PRECEDENCE OVER THOSE TO A SMALLER SCALE. 4. ALL THE DIMENSIONS ARE UNFINISHED DIMENSIONS UNLESS OTHERWISE MENTIONED. 5. ALL AMBIGUITY SHALL BE BROUGHT TO THE NOTICE OF ARCHITECT IMMEDIATELY. KEY PLAN/ LOCATION: INCUBATION CENTER W.DRG. NO. A101 PUSHTI SHAH INSTITUTE OF ARCHITECTURE & PLANNING, NIRMA UNIVERSITY FINISHED LEVEL UNFINISHED LEVEL WALL SECTION MARK SIZE WINDOW SCHEDULE SILL LINT. QTY. DOOR/WINDOW SCHEDULE: DOOR SCHEDULE MARK SIZE SILL LINT. QTY. SCALE:1 100 SEMESTER: VI NO. DATE DESCRIPTION GROUND FLOOR PLAN REVISION 20BAR029 DATE 24/03/2023 BEAM BOTTOM LINTEL/SLAB @ +3920 SLAB ABOVE @ +5000 INSULATION STEEL
|SEMESTER VI
FIRST FLOOR PLAN
13 33000 UP 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 A B C D E F G A B C D E F G DOWN 6000 6000 6000 6000 6000 3000 300 5700 300 5700 300 5700 300 5700 300 5700 300 2700 300 300 530 5700 805 1110 630 1110 630 1110 1410 1110 630 1110 630 1110 1990 530 2370 530 1990 530 630 530 1210 530 630 530 1410 530 630 530 805 W1 20 W1 21 W1 22 W1 23 W1 24 W1 25 W1 26 W1 27 W1 28 W1 29 W1 30 W1 33 W1 32 W1 31 W1 35 W1 37 W1 36 W1 34 W1 38 W1 39 W1 40 W1 41 W1 42 W1 43 1 A201 1 A201 2 A201 2 A201 Multipurpose Hall 20750x17700 +5100 +5050 S.B. +9050 Exhibition space 11820x5800 +5100 +5050 S.B. +9050 Seminar Hall 8800x5800 +5100 +5050 S.B. +9050 Fab lab 11800x8800 +5100 +5050 S.B. +9050 +5100 +5050 S.B. +9050 Training Hall +5100 +5050 S.B. +9050 Bookstore 8800x5800 +5100 +5050 S.B. +9050 Toilets 5800x5800 +5100 +5050 S.B. +9050 Reception 8800x5950 +950 +900 S.B. +9050 Toilets 8800x5800 8800x8800 W2 19 W2 20 W2 21 W2 22 W2 23 W2 24 W3 W3 W3 10 W3 11 W3 12 W4 14 W4 15 W4 16 W4 17 W4 19 W4 18 W1 44 W1 45 W2 25 W2 26 Courtyard 8700x8520 +700 OTS Courtyard 8700x5700 +700 OTS Courtyard 5700X3000 +700 OTS Corridor 23800x3050 Corridor 27300x3050 Corridor 15000x3050 +5100 +5050 S.B. +9050 +5100 +5050 S.B. +9050 +5100 +5050 S.B. +9050 LVL 00 LVL 900 D2 5 D2 6 D2 8 D2 D1 10 D1 11 D1 12 D3 4 D3 5 D3 D3 7 D3 D3 9 300 10485 530 2370 530 7990 4590 805 2700 300 5700 300 5700 300 5700 300 5700 457300 1500 400400400400400 3000 6000 6000 6000 6000 6000 33000 1940 1060 880 1540 1460 1540 1460 1540 930 480 1640 480 400 480 1640 480 400 480 1640 480 400 480 1640 480 350 2700 300 2700 6300 2700 300 2700 300 2700 300 351 15012 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 60000 880 1010 1990 480 580 480 1990 1010 880 15000 20700 15663 9300 15000 9000 2700 300 8700 300 450 A301 2 A301 WS1 WS2 GENERAL NOTES: THIS DRAWING AND DESIGN ARE THE SOLE PROPERTY OF PUSHTI SHAH AND SHALL NOT BE TRACED, COPIED, LENT, REPRODUCED, MODIFIED OR MADE UNAUTHORISED USE IN ANY MANNER WITHOUT THE WRITTEN CONSENT OF THE FIRM. 1. ALL THE DIMENSION ARE IN MM. 2. ALL THE DIMENSIONS SHALL BE READ AND NOT SCALED. 3. DIMENSIONS IN DRAWINGS TO A LARGE SCALE SHALL TAKE PRECEDENCE OVER THOSE TO A SMALLER SCALE. 4. ALL THE DIMENSIONS ARE UNFINISHED DIMENSIONS UNLESS OTHERWISE MENTIONED. 5. ALL AMBIGUITY SHALL BE BROUGHT TO THE NOTICE OF ARCHITECT IMMEDIATELY. KEY PLAN/ LOCATION: INCUBATION CENTER W.DRG. NO. A102 PUSHTI SHAH INSTITUTE OF ARCHITECTURE & PLANNING, NIRMA UNIVERSITY FINISHED LEVEL UNFINISHED LEVEL WALL SECTION MARK SIZE WINDOW SCHEDULE SILL LINT. QTY. DOOR/WINDOW SCHEDULE: DOOR SCHEDULE MARK SIZE SILL LINT. QTY. SCALE:1 100 SEMESTER: VI NO. DATE DESCRIPTION FIRST FLOOR PLAN REVISION 20BAR029 DATE 24/03/2023 BEAM BOTTOM LINTEL/SLAB @ +8120 SLAB ABOVE @ +8000 INSULATION STEEL
14 A B C D E F G +950 +900 +950 +900 +950 +900 +950 +900 +5100 +5050 +5100 +5050 +00 +00 GROUND LINE ELE +00 FINISHED PLINTH LEVEL ELE +950 G.F. BEAM BOTTOM ELE +4600 F.F. FINISHED LVL ELE +5100 F.F. BEAM BOTTOM ELE +8750 GROUND LINE ELE +00 FINISHED PLINTH LEVEL ELE +950 G.F. BEAM BOTTOM ELE +4600 F.F. FINISHED LVL ELE +5100 F.F. BEAM BOTTOM ELE +8750 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 930 3670 500 3650 680 2160 680 300 150 3700 300 950 7800 301 150 3650 3650 500 +950 +900 +950 +900 +950 +900 +950 +900 +950 +900 +950 +900 +00 +5100 +5050 +5100 +5050 +5100 +5050 +5100 +5050 W2 12 W3 11 W2 3 W2 17 D1 5 D3 1 W2 19 D3 5 Library Courtyard Corridor Conf. Room 1 Big Hall Corridor Corridor Multipurpose Hall Fab lab Courtyard Corridor Corridor Toilets Conf. Room 1 Reception Multipurpose Hall Toilets Double height 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 A B C D E F G
SECTIONS
SECTION 1
|SEMESTER VI
SECTION 2
JUNCTION DETAILS-WALL SECTION AND PART PLAN
JUNCTION 1
JUNCTION 2
SECTION AA
15 Outside Inside 20MM MORTAR 10MM BASE COAT 150MM RCC SLAB 600X300 PLINTH BEAM 20MM KOTA STONE COMPACTED EARTH WATERPROOF PLASTER 150MM BBCC 20MM PLASTER BOARD 160x50MM METAL STUD 260x200 METAL JOIST MAIN BEAM WINDOW FRAME FIXED GLASS SLIDING WINDOW KOTA STONE SKIRTING 300x300 METAL I COLUMN SECTION AA LVL.+950 LVL.+5100 LVL.+9300 LVL.+00 LVL.+900 LVL.+4600 LVL.+5100 LVL.+9300 GROUND GF FINISHED FF FINISH TERRACE FINISH GF BEAM BOTTOM 900 150 3550 480 3670 300 160 300 937 300 5700 ELEVATION 1 WS 01 A W3 2 WS 01 A GROUND FLOOR PLAN 1 ELE WS 01 A WS 01 A 1 ELE FIRST FLOOR PLAN W4 14 MODIFIED OR KEY PLAN/ LOCATION: DOOR/WINDOW SCHEDULE: DOOR SCHEDULE MARK SIZE SILL LINT. QTY. SCALE:1 100 SEMESTER: VI WALL SECTION 01 DATE 24/03/2023 ELEVATION 1 20MM MORTAR 10MM BASE COAT 150MM RCC SLAB 600X300 PLINTH BEAM 20MM KOTA STONE COMPACTED EARTH WATERPROOF PLASTER 300x300 STEEL COLUMN SECONDARY BEAM 200x300 MS PLATE BOLT METAL RAILING 300x300 MAIN BEAM METAL DECKING SHEET RCC SLAB 20MM MORTAR 10MM BASE COAT 20MM KOTA STONE 75x75MM VATA 10MM CEMENT SCREED 75MM BEDDING MORTAR (ACC. TO SLOPE) 15MM BASE COAT 6MM CHINA MOSAIC 10MM PLASTER FINISH RCC SLAB 20MM PLASTER BOARD 160x50MM METAL STUD Corridor Courtyard SKIRTING BOARD END TRIM 150MM BBCC LVL.+00 LVL.+950 LVL.+700 LVL.+4600 LVL.+5100 LVL.+9300 GROUND COURTYARD FF FINISH GF BEAMBOTTOM TERRACE FINISH LVL.+5100 LVL.+9300 600 150 3700 500 3650 300 150 106
Corridor WS 02 A WS 02 A WS 02 A WS 02 A GROUND FLOOR PLAN FIRST FLOOR PLAN Corridor 20MM MORTAR 10MM BASE COAT 150MM RCC SLAB 600X300 PLINTH BEAM 20MM KOTA STONE COMPACTED EARTH WATERPROOF PLASTER 300x300 STEEL I COLUMN SECONDARY I BEAM 200x300 MS PLATE BOLT METAL RAILING 300x300 MAIN BEAM METAL DECKING SHEET RCC SLAB 20MM MORTAR 10MM BASE COAT 20MM KOTA STONE 75x75MM VATA 10MM CEMENT SCREED 75MM BEDDING MORTAR (ACC. TO SLOPE) 15MM BASE COAT 6MM CHINA MOSAIC 10MM PLASTER FINISH RCC SLAB 20MM PLASTER BOARD 160x50MM METAL STUD Corridor Courtyard SKIRTING BOARD END TRIM 150MM BBCC LVL.+00 LVL.+950 LVL.+700 LVL.+4600 LVL.+5100 LVL.+9300 GROUND COURTYARD FF FINISH GF BEAMBOTTOM TERRACE FINISH LVL.+5100 LVL.+9300 600 150 3700 500 3650 300 150 106 Corridor WS 02 A WS 02 A WS 02 A WS 02 A GROUND FLOOR PLAN FIRST FLOOR PLAN Corridor
‘AMAN’
Semester III-Material Studio
Location-Dwara village,Uttrakhand,India
Year-2021
Project-Dream House
Area-250sqm
17
SITE CONTEXT
The programme was to design a dream abode,taking into considerations the various climatic and contextual aspects of the site chosen.The structure should also reflect the vernacular building styles native to the place and provide a comfortable settlement to the user.The selected site is located on the hillside,with picturesque views,and a river flowing in the valley beneath.The aim of the project was to allow the user to enjoy the site and feel connected to the nature.This led to a staggering form with respect to the slope and the use of curved walls opening up towards the valley, providing a diverse experience throughout the space
18
SECTION AA CONCEPTUALS SITE PLAN Selected Site A A |SEMESTER III
EXPLODED VIEW SHOWING VARIOUS MATERIALS AND THEIR USAGE
The main materials chosen include locally available stone-for the structure of load bearing walls and timber-for the roof and floor. Choosing this combination responds to the harsh climate of the region by exploiting the thermal insulating properties of stone and pitched timber roofs help to easily drain off water as this area experiences quite heavy rainfall.
ROOF CLADDING MATERIAL (SLATE,WOODEN PLANKS)
ROOF FRAMETIMBER RAFTERS AND PURLINS
STONE WALLSFROM LOCALLY AVAILABLE STONE (load bearing walls,made using ashlar masonry)
FLOOR FINISHWOODEN PLANKS
FLOOR STRUCTURETIMBER RAFTERS AND PURLINS
STONE WALLSFROM LOCALLY AVAILABLE STONE (load bearing walls,made using ashlar masonry)
19
GRADE SLAB
DETANGLED
Semester IV-Housing Studio
Location-Afzal Khan No Tekro,Ahmedabad
Year-2022
Project-EWS And LIG Housing
Area-7000 Sqm
21
The programme aimed at developing a housing facility at an already occupied site,facing issues like lack of open space,common amenities for the public and illegal expansions.Keeping in mind these points and the FSI regulations for the area,a project was developed for the people,belonging to various religious and income groups.The main points considered were maintaining a central focal point and creating a network connecting various units,encouraging interactions and a harmonious lifestyle,at the same time maintaining a balance between the open,semi-open and closed spaces.Various units combined together created a cluster,which had its own common open space.These clusters also had a common open space at the site level,for larger gatherings.
CONCEPT MODELS AND SKETCHES
22
|SEMESTER IV
SECTION AA Circulation Semi open balcony
The site is located at the heart of the city,surrounded by the Pol houses and Textile industries,well connected with the railway and bus station.Located in a densely populated area,the site is directly connected to the main road,and has an already existing dargah and temple which were to be taken into consideration while designing.
23
Residential cluster Places of worship Common amenities for residents Commercial Cluster A A
SITE PLAN
24
UNIT PLANS
NORTH ELEVATION
30 sqm TYPE A
45
60
|SEMESTER IV
30 sqm TYPE B
sqm
sqm
EXPLODED VIEW SHOWING STACKING OF VARIOUS UNITS
Mirroring the same forms one cluster
25
60sqm Unit 45sqm Unit 30sqm Unit
REDEFINED TRAIL
Semester II-Contextual Studio
Location-Madhya pradesh
Year-2021
Project-Movement,Organisation And Experience
Area-414 sqm
27
The programme was to design a pathway,from the ground level to the 9m level.The aim was to create an enriching and beautiful experience to the people going up. On one side of the site is a fort,and on the other is a valley which provides picturesque views along with a stambh which is of historical importance.The project emphasises the use of ramps and staircases to facilitate the journey to the top while providing views of the valley and stambh,thus creating a soothing path.Various functions,such as museums,viewing decks,shops at various levels and spaces for a cultural show at the top have been added for a ful filling experience.
PLANS AT VARIOUS LEVELS(hand drafted)
SECTIONS
28
BRIEF OF THE PROJECT |SEMESTER II
PROCESS SKETCHES
PROCESS MODEL
29
30
5.HERITAGE CITY DOCUMENTATION
Semester III RSP
Location-Zatkan Ni Pol,Ahmedabad
Year-2021 (Group of three)
31
A three week programme was introduced to document various areas of the old heritage city of Ahmedabad in December 2021. Popularly called Pol Houses,these are more than a 100 years old and are still standing the same.This was an amazing opportunity to study and explore the climate responsive techniques used during the time,ranging from thick lime plaster walls,courtyards within the house,timber structures and linear arrangement to provide shading.Other various aspects were studied in terms of materials,usage,scale etc.
In addition to this,public squares or chowks created and other semi open spaces were also studied and all this data was produced in the form of detailed drawings at the end of three weeks.
Hendaepero earum doleniet la vellania nihiciducit de et faccumqui dia quibusda essitemost, ullibea voleste por sitia prae vel et eicienitatus sum aritia dolorecus alicimperum sunde serition nonsequi intis expelibustio evendio quaecatios derio ent, quostium qui corro comnien temporrum nobis num qui dolecum qui aut eum, cum sam fuga. Xerferi bearum aute volo to cus eatectia idus, cum et que sitibus restiusanis ea porerore doluptatiunt alicias nonseri atiunt endaernati delit laut plibusda excero volupta ati andae distrunt que voloritatium sinum quaturem et quos perrum rendanis restisque lanihil eos dolorepel into culpa il excerum ratiorio. Et et aceperiti inumquam fugias
32 18 W1 D1 D2 D3 D4 D5 D6 N4 N2 N1 N3 OTLA STREET LVL:00 MM KITCHEN LVL:+530 MM ROOM LVL:+530 MM A' A B' B C' C UP Rev. No. Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: POL WARD NO SURVEY NO GRADEMetal cut Conjectural line wood Distress Plumbing DATE:-1 : 50 XX/XX/XXXX N GROUND FLOOR PLAN ZATKAN NI POL KHADIA 2548 III INSTITUTE OF ARCHITECTURE AND PLANNING, NIRMA UNIVERSITY RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR ROOM 1 FFL: +0.274 MT ROOM 2 FFL: +0.274 MT B' B A' A C' C D7 W02 W03 W04 W05 N6 N7 N9 N8 N5 Rev. No. Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) LEGEND CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: All dimensions are in Millimeters unless specified otherwise NOTES POL WARD NO SURVEY NO GRADEMetal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing DATE:-1 50 XX/XX/XXXX N FIRST FLOOR PLAN ZATKAN NI POL KHADIA 2548 III INSTITUTE OF ARCHITECTURE AND PLANNING, NIRMA UNIVERSITY RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR B' B A' A C' C 99 100 100 200 100 592 722 345 682 1195 BALCONY ROOM-4 BALCONY ROOM-4 FFL: +5.43 MT FFL: +5.4 MT W06 W07 D09 N11 N12 N09 N10 N13 down PARAPET 620 80 80 3422 71 74 800 253 464 74 722 1633 4146 74 74 1612 271 1006 506 769 97 4164 1544 407 738 748 70 410 69 726 736 72 262 109 706 717 119 250 80 306234334 99 70284 74 81 76 86 333 53 51 53 46 58 27 780 866 432 822 458 782 485 359 857 385 920 3574 1607 C' C A' A B' B Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) LEGEND CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: SCALE All dimensions are in Millimeters unless specified otherwise NOTES POL WARD NO SURVEY NO GRADEMetal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing-1 ZATKAN NI POL KHADIA 2548 III INSTITUTE OF ARCHITECTURE AND PLANNING, NIRMA UNIVERSITY LEGEND All dimensions are in Millimeters unless specified otherwise NOTES Metal Wood cut Metal wood Wall Distress
|SEMESTER III
33 19 4146 C Rev. No. UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: DATE:1 : 50 XX/XX/XXXX N SECOND FLOOR PLAN OF ARCHITECTURE AND NIRMA UNIVERSITY RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR 2013 530 2469 1017 2498 495 BATHROOM ROOM 2 ROOM 4 BALCONY ROOM 4 ROOM 3 OTLO WOODEN PANEL 12MM DIA M.S. WOODEN SOLID SHUTTER FRAME LINTEL WOODEN PANEL PIPE WOODEN PANEL INSIDE OUTSIDE PLAN - D1 ELEVATION AT B SECTION AT BB' SECTION - D1 (A Trust of Ahmedabad Municipal Corporation) Ahmedabad World Heritage City Trust LEGEND CLIENT: PROJECT: Documentation of WHC KEY PLAN DRAWING NAME: DATE: DRAWING NO.: All dimensions are in Millimeters unless specified otherwise NOTES Metal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing POL WARD NO SURVEY NO GRADE-UNIVERSITY/FIRM: SCALE ZATKAN NI POL KHADIA 2548 III INSTITUTE OF ARCHITECTURE AND PLANNING, NIRMA UNIVERSITY 1 : 20 DOOR DETAIL SILL PLAN - W03 SECTION -W03 ELEVATION -W03 Rev. No. Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: POL WARD NO SURVEY NO GRADEMetal cut Conjectural line wood Distress Plumbing DATE:-ELEVATION1 : 50ZATKAN NI POL KHADIA 2548 III INSTITUTE OF ARCHITECTURE AND PLANNING, NIRMA UNIVERSITY RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR por evendio sam alicias et fugias 1950 SECOND FLOOR INVERTED CEILING LAYOUT RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR Rev. No. KEY PLAN DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: DATE:XX/XX/XXXX N SECOND FLOOR PLAN RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR 2013 530 2469 1017 2498 495 BATHROOM ROOM 2 ROOM 4 BALCONY ROOM 4 ROOM 3 OTLO HINGE BOTTOM RAIL LOCK RAIL DOOR FRAME PIPE FRAME WOODEN PANEL 12MM DIA M.S. PIPE INSIDE OUTSIDE PLAN - D1 ELEVATION AT B SECTION AT BB' SECTION - D1 Rev. No. (A Trust of Ahmedabad Municipal Corporation) Ahmedabad World Heritage City Trust LEGEND CLIENT: PROJECT: Documentation of WHC KEY PLAN DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: All dimensions are in Millimeters unless specified otherwise NOTES Metal cut Conjectural line Wood cut Metal wood Wall Distress Plumbing DATE: POL WARD NO SURVEY NO GRADE-UNIVERSITY/FIRM: SCALE ZATKAN NI POL KHADIA 2548 III INSTITUTE OF ARCHITECTURE AND PLANNING, NIRMA UNIVERSITY 1 20 RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR DOOR DETAIL SILL PLAN - W03 SECTION -W03 ELEVATION -W03 Rev. No. Ahmedabad World Heritage City Trust (A Trust of Ahmedabad Municipal Corporation) CLIENT: PROJECT: Documentation of WHC UNIVERSITY/FIRM: KEY PLAN SCALE DRAWING NAME: DATE: DRAWN BY: CHECKED BY: DRAWING NO.: POL WARD NO SURVEY NO GRADEcut Conjectural line Plumbing DATE:-ELEVATION1 : 50ZATKAN NI POL KHADIA I 2548 III INSTITUTE OF ARCHITECTURE AND PLANNING, NIRMA UNIVERSITY RUSHI MAISURIA PUSHTI SHAH MYANVY GAJJAR
6.EXPLORATORY RSP (France and Italy,2022)
Live sketches
34
|SEMESTER IV
6.HANDS ON WORKSHOP (Kerala,2023)
35
Exploration through Kerala
SEMESTER V |
Hands on Workshop
MISCELLANEOUS
37
BASIC DESIGN
Another important part of the curiculum was Basic Design,which introduced us to various techniques and methods of representing our drawings and ideas,along with introducing various mediums ranging from acrylics,dry pastels,colour pencils,pens, and many more.
From left-
1.This exercise was to design a temporary residence for humans,taking inspiration from various species of animals and the methods they use for surviving.
2.This image shows the exploration of various methods of representation of a chosen silhouette,through various methods and scales.
3.The image to the right shows an exercise where an image of an existing landscape had to be taken for reference,and had to be represented only in the form of lines.
38
39
40 MODELS-HAND AND LASER CUT
clockwise from top-institution design model,Mulimatt Centre,Fagus Factory,Gherkin,Villa La Rotunda
41
SKETCHES AND PAINTINGS
from left-3D printed model,knife panting,pottery,lamp making,bottle painting
Pushti Shah +91-9106698189 20bar029@nirmauni.ac.in pushtishah08@gmail.com