Access to MCOL 66/11kV Network Switching Procedure No: SS#2-07.11.16 PREPARATION for Disconnection & Reconnection of High Voltage Mains and Apparatus in association with H/V Access Permit No.: AP#2 – 07.11.16 H/V Safety Checklist: CL#2 – 07.11.16 (1) Switching Instruction Originator: A. Chen (2) Nominated AUTHORISED ISOLATOR: J. Gardiner (3) Switching Instruction CHECKED BY: P. Reynolds (4) Referenced Plans, Drawings: 61205-9350-9-00-HV (5) Scope of Work:  Annual Testing of High Voltage Protection Devices & High Voltage Switchgear 

Annual Inspection of 415 V MCC Main Incomers

Annual Oil Sampling and Dissolved Gas Analysis

Earth Resistance Switchyards and Lightning Protection.

(6) Mains & Apparatus affected by Switching/Isolation: 66kV/11kV Infrastructure on Bus B. This includes all 415V Main Motor Control Centre Incomers on Bus B. (7) This switching instruction is issued in respect of the reason as detailed in (5) above on the mains and apparatus as detailed in (6) above. If ANY deviation from this Switching Instruction is required a new Switching Instruction must be issued.

(8) I, the nominated Authorised Isolator, hereby acknowledge receipt of this Switching Instruction and state that I have checked that the Switching/Isolation points are correct, understand the scope of work and will carry out my duties under the Electrical Safety Rules and High Voltage Isolation Rules. Signed:

Date:

Time:

Page 1 of 6


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Switching Procedure - Bus B by Power System Design - Issuu