Portland Parks Bond 2018-2019 Annual Report

Page 65

APPENDIX B

PA R K S R E P L AC E M E N T B O N D A N N U A L R E P O R T YEAR 4

Phase 1 Project Summaries

Pioneer Courthouse Square Replace failing structures, fix leaks and cracks, make improvements at most-visited park

Pioneer Courthouse Square 701 SW 6th Ave. Project completed

Replace aging infrastructure. Replace the waterproofing membrane that protects the underground occupied spaces. Retrofit the restrooms to meet ADA compliance and to create a new all-user restroom facility. Replace the aging HVAC and central control system components. Remove and replace the skylights to eliminate leaks below them. Provide handrails and other ADA improvements as required by code.

Accessibility Remove access barriers in parks throughout city

Washington Park Rose Garden 4001 SW Canyon Rd. Project completed

Remove ADA barriers from the main promenade extending the length of the Rose Garden. Remove ADA barriers from the ramp connecting the garden to the store plaza and from the path between the store plaza and the ADA parking at the tennis court area. Work included in the promenade aspect of the project includes extensive redesign to eliminate stairs in the center of the garden. Replace drinking fountain.

Restrooms, Other Urgent Repairs Prevent closures, replace and repair restrooms, roofs and other failing structures throughout the system

Argay Park Tennis Courts NE 141st Ave. & Shaver St. Project completed

Rebuild and upgrade all four existing tennis courts. Upgrade lighting. Replace all fencing, nets, and stanchions. Rebuild the playing surface, necessary to eliminate substantial cracking and differential settlement. Replace existing player benches, signage, and drinking fountain. Correct deficiencies in ADA path of travel to the courts from NE 141st Avenue.

58


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Portland Parks Bond 2018-2019 Annual Report by Portland Parks & Recreation - Issuu