EF WELD RECORD SHEET

Page 1

Electrofusion Installation Checklist

PROJECT DETAILS

Pipe ends washed clean and free from deformation/damage

Pipe toe-in (Reversion measured at 5% of OD from pipe end)

Pipe OD (actual)

Pipe diameter – record D1 mm (max) and D2 mm (min)

Pipe ovality – (D1 – D2)

Are pipe ends cut square?

Is pipe re-rounding equipment installed?

Pipe peel – record peel thickness

OD after peel

Are witness marks visible?

Pipe surface temperature

Is bore of fitting clean?

Brand/type of pipe wipe used

Are pipe end(s) and fitting correctly aligned?

Is alignment/restraint equipment installed

This document has been prepared to assist installers record information for quality purposes for asset owners. Installers should follow industry best practice techniques as detailed in POP001 Electrofusion Jointing of PE Pipe and Fittings for Pressure Applications as published by Plastics Industry Pipe Association of Australia. These guidelines are available for free from www.pipa.com.au

Phone. 1300 752 776 Email. sales@plasson.com.au Web. plasson.com.au
ºC Welder Name Ambient Temperature Accreditation Number Machine Serial Number Weld/Report Number Project / Location Nominal Pipe OD Pipe Batch Number Cooling Finish Fitting Description Fitting Batch Number mm seconds minutes Weld Time Cool Time Weld Finish time mm mm mm mm mm mm ºC mm mm mm mm mm mm mm mm mm mm ºC time Shelter Erected Yes No
(mm) First peel Second peel
correctly? Yes Yes No No Yes Yes No No Yes Yes No No Yes Yes No No Yes Yes No No Melt out Yes No Indicator pins rise Yes No Error messages Yes No Yes Yes No No Yes Yes No No Weather Fine Overcast Rainy Windy PREPARATION WELD SIGNATURE DATE FOR EF SADDLE INSTALLATION ONLY USE SIDE A SIDE A SIDE B Input method Auto Detect Manual Input Barcode Scanner

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.