Electrofusion Installation Checklist
PROJECT DETAILS
Pipe ends washed clean and free from deformation/damage
Pipe toe-in (Reversion measured at 5% of OD from pipe end)
Pipe OD (actual)
Pipe diameter – record D1 mm (max) and D2 mm (min)
Pipe ovality – (D1 – D2)
Are pipe ends cut square?
Is pipe re-rounding equipment installed?
Pipe peel – record peel thickness
OD after peel
Are witness marks visible?
Pipe surface temperature
Is bore of fitting clean?
Brand/type of pipe wipe used
Are pipe end(s) and fitting correctly aligned?
Is alignment/restraint equipment installed
This document has been prepared to assist installers record information for quality purposes for asset owners. Installers should follow industry best practice techniques as detailed in POP001 Electrofusion Jointing of PE Pipe and Fittings for Pressure Applications as published by Plastics Industry Pipe Association of Australia. These guidelines are available for free from www.pipa.com.au