Skip to main content

EF WELD RECORD SHEET

Page 1

Electrofusion Installation Checklist PROJECT DETAILS Project / Location

Ambient Temperature

Shelter Erected Yes

ºC Welder Name

Accreditation Number Nominal Pipe OD

Pipe Batch Number

No Fitting Batch Number

mm Machine Serial Number

Weld/Report Number

Fitting Description

Weather Fine

PREPARATION FOR EF SADDLE INSTALLATION ONLY USE SIDE A

Overcast

SIDE A No

No

Yes

Pipe toe-in (Reversion measured at 5% of OD from pipe end)

mm

mm

Pipe OD (actual)

mm

mm

Pipe diameter – record D1 mm (max) and D2 mm (min)

mm

Pipe ovality – (D1 – D2)

mm

mm

mm

mm mm

Are pipe ends cut square?

Yes

No

Yes

No

Is pipe re-rounding equipment installed?

Yes

No

Yes

No

Pipe peel – record peel thickness (mm)

First peel

mm

mm

Second peel

mm

mm

mm

mm

OD after peel Are witness marks visible?

Yes

Pipe surface temperature

No

No

Yes

ºC

ºC

Yes

No

Yes

No

Are pipe end(s) and fitting correctly aligned?

Yes

No

Yes

No

Is alignment/restraint equipment installed correctly?

Yes

No

Yes

No

Is bore of fitting clean?

Windy

SIDE B

Yes

Pipe ends washed clean and free from deformation/damage

Rainy

Brand/type of pipe wipe used

WELD Weld Time

Weld Finish seconds

Cool Time

Input method time

Cooling Finish minutes

Auto Detect Melt out

time

Yes

Manual Input Indicator pins rise

No

SIGNATURE

Yes

No

Barcode Scanner Error messages Yes

No

DATE

This document has been prepared to assist installers record information for quality purposes for asset owners. Installers should follow industry best practice techniques as detailed in POP001 Electrofusion Jointing of PE Pipe and Fittings for Pressure Applications as published by Plastics Industry Pipe Association of Australia. These guidelines are available for free from www.pipa.com.au

RESET FORM

Phone. 1300 752 776

Email. sales@plasson.com.au

Web. plasson.com.au


Turn static files into dynamic content formats.

Create a flipbook
EF WELD RECORD SHEET by PLASSON Australia - Issuu