Electrofusion Installation Checklist PROJECT DETAILS Project / Location
Ambient Temperature
Shelter Erected Yes
ºC Welder Name
Accreditation Number Nominal Pipe OD
Pipe Batch Number
No Fitting Batch Number
mm Machine Serial Number
Weld/Report Number
Fitting Description
Weather Fine
PREPARATION FOR EF SADDLE INSTALLATION ONLY USE SIDE A
Overcast
SIDE A No
No
Yes
Pipe toe-in (Reversion measured at 5% of OD from pipe end)
mm
mm
Pipe OD (actual)
mm
mm
Pipe diameter – record D1 mm (max) and D2 mm (min)
mm
Pipe ovality – (D1 – D2)
mm
mm
mm
mm mm
Are pipe ends cut square?
Yes
No
Yes
No
Is pipe re-rounding equipment installed?
Yes
No
Yes
No
Pipe peel – record peel thickness (mm)
First peel
mm
mm
Second peel
mm
mm
mm
mm
OD after peel Are witness marks visible?
Yes
Pipe surface temperature
No
No
Yes
ºC
ºC
Yes
No
Yes
No
Are pipe end(s) and fitting correctly aligned?
Yes
No
Yes
No
Is alignment/restraint equipment installed correctly?
Yes
No
Yes
No
Is bore of fitting clean?
Windy
SIDE B
Yes
Pipe ends washed clean and free from deformation/damage
Rainy
Brand/type of pipe wipe used
WELD Weld Time
Weld Finish seconds
Cool Time
Input method time
Cooling Finish minutes
Auto Detect Melt out
time
Yes
Manual Input Indicator pins rise
No
SIGNATURE
Yes
No
Barcode Scanner Error messages Yes
No
DATE
This document has been prepared to assist installers record information for quality purposes for asset owners. Installers should follow industry best practice techniques as detailed in POP001 Electrofusion Jointing of PE Pipe and Fittings for Pressure Applications as published by Plastics Industry Pipe Association of Australia. These guidelines are available for free from www.pipa.com.au
RESET FORM
Phone. 1300 752 776
Email. sales@plasson.com.au
Web. plasson.com.au