
1 minute read
Bedrooms
Bathrooms (Continued)
38. Tub: The caulking around the top of tub is deteriorated. Moisture penetration may occur. Repairs by a qualified licensed contractor are recommended.
Advertisement
39. Shower: Acrylic pan and ceramic tile surround 40. Toilet: 41. HVAC Source: 42. Ventilation: Window

Bedrooms
A = Acceptable, NI = Not Inspected, M = Maintenance, HS = Health & Safety
A NI M HS
Bedroom 1. Closets: 2. Ceilings: Drywall 3. Walls: Drywall 4. Floors: Hardwood 5. Doors: The door hardware is loose in the 2nd floor guest bedroom, Repairs by a qualified licensed contractor are recommended.
