Portfolio 2024 - Peyman Baktash

Page 1

Selected works | 2020-2024

Peyman Baktash

* Images in this portfolio are made by Peyman Baktash exceptions are indicated differently.

** Some of the content in this portfolio is confidential. please, handle with care and use only for its purpose.

I started my Master of Architecture program at Academie van Boukoud, Tilburg, in 2020. Since then, alongside my academic life, I have engaged in different practical projects while working at various offices. This portfolio is a selective showcase of projects I participated in at various architectural bureaus in the Netherlands as a Junior Architect.

I understand that each project is unique and brings a new set of challenges to the table. My goal with every project is to devise solutions that accurately reflect the character and unique traits of each undertaking. I believe that architecture can improve everyone’s life; therefore, each design decision is, for me, an opportunity to invest in the dignity of the places where we live and work.

Resume The Natural Pavilion
The
Project name Expo Pavilion Cultural center Workshop/office Residential Type 03 06 14 22 30 Page
Thijssehuis Two O
Urban Woods - Delft

Peyman Baktash

Iranian 31st, July 1995

Martinus Nijhofflaan, 2B16, 2624ES Delft, Netherlands

peyman.baktash.pb@gmail.com +31 642 13 19 39

Experience

Jun 2022 - Feb 2024

Junior Architect, Urban Climate Architects

Sep 2021 - Jun 2022

Junior Architect, Puur Plus Ontwerpers

Mar 2021 - Aug 2021

Intern, DP6 Architecten

Sep 2020 - Feb 2021

Intern, Fokkema & Partners Architecten

Sep 2018 - Aug 2020

Architect Assistant & 3D Artist, -60 Studio

Skills/Software

Picture/Video

Photoshop

InDesign

Illustrator

After Effects

Affinity

> Delft ,Netherlands

> Amsterdam ,Netherlands

> Delft,Netherlands

> Delft,Netherlands

> Esfahan, Iran

2D/3D Modeling Rendering

AutoCAD 2D

Revit ( BIM )

3DsMax

Rhino +Grasshopper

VectorWorks

SketchUP

Enscape

Vray

Education

2020 - Present

Master of Architecture Fontys University of Applied Sciences, Tilburg, Netherlands

2013 - 2018

B.Sc. in Architectural Engineering

Islamic Azad University of Isfahan Branch, Isfahan, Iran

2009 - 2013

Diploma in Science Pouya High School, Isfahan, Iran

Hobby

Sport

> running, football & GYM

Travel

> camping, weekend trip

Media

> books, music & movies

Language

English

> Fluent

Dutch

> beginner

Persian

> native

The Natural Pavilion

Practical work at DP6 architectuurstudio 2021

The Natural Pavilion is a new circular construction concept that was selected for the National Government Pavilion Floriade Expo 2022.

This sustainable building is the basis for a very versatile pavilion, reusable in different configurations, green, and made entirely of bio-based materials which was the interesting question of the assignment; designing in a way that can be reused in a year!

The Di-X Natural Pavilion was an inspiring experience. The 10 exhibition spaces designed by the same size modular wooden components created different experiences on all three floors.

After the Floriade EXPO, the pavilion will be given a second life as a traveling nature pavilion. Due to the demonstrability, adaptability, and expandability of the HoutKern Building Method, the Di-X Natural Pavilion can be seen in various forms in the future.

My participation in this project, exploring the versatility of wooden structures, has opened up a new world for my career. I became eager to delve deeper into circular projects, particularly those centered around the development of wooden structures!

Location: Almere, The Netherlands

Team: Jimmy van der Aa, Alexander Krösbacher & Peyman Baktash

Participation: SO, VO, DO

[ 6
]
Peyman Baktash © Daria Scagliola & Stijn Brakkee
[ 8 > Pavilion section
]
Peyman Baktash

> Situation Plan > Design goals schemes

[ 10

> Night view of Final Design for competition

]
Peyman Baktash

> Structure and joint detail

[ 12 THE NATURAL PAVILION, FLORIADE EXPO 2022 THE NATURAL PAVILION, FLORIADE EXPO 2022
© Photo : DP6.nl © Daria Scagliola & Stijn Brakkee

> Dak

> Second Floor

> First Floor

> Ground Floor

]
Peyman Baktash Van inheems, versgekapt hout naar Floriade paviljoen in 5 maanden

Thijssehuis

Practical work at DP6 architectuurstudio 2021

The Thijssehuis is a new social and cultural house in the heart of Texel. It is for everyone. Whether you are young, or old. There is always something to do, there are people to meet, and there is always room to chat or try something new. Music, images, books and Texel stories, dance, coaching or relaxation, from class to performance and from solo to festival, you will find it all here. A large living room that is bustling, a place where you feel at home and truly Texel!

In this house, people come together in the Library, at Young4Ever, and at Artex where they meet each other, get to know each other, experience, and develop together. Meeting and especially interaction, cooperation, and experiencing together are the central designing points.

In the design process, we connect all the different aspects that are important in the new building. The integral design is about creating the right balance and cohesion in the ambitions of the users of the Thijssehuis, the technical and functional requirements, the historical and landscape values of the place, the sustainability ambitions, and the budget.

Location: Texel, The Netherlands

Team:

Richelle de Jong, Alexander Krösbacher, Gaelle Le Coz & Peyman Baktash

Participation: SO, VO

[ 14
]
Peyman Baktash

> Concept sketches by Richelle de Jong

[ 16
]
Peyman Baktash
[ 18 >
Situation
Peyman Baktash ] opslag theater berg dans bar berging ate e kleedruimte + douche kleedruimte + douche li MIVA toiletten toiletten o s g uitleenapparaat sorteermachine treinzitjes garderobe/kluisjes berging balie berging cafe BALIE CAFE/BAR techniek boekenkast klein podium pantry TERRAS TERRAS / BUITENPODIUM TERRAS FOYER BIBLIOTHEEK EXPOSITIE DANSZAAL THEATERZAAL JEUGDSOOS hoofdentree bevoorrading entree Y4E KEUKEN WORKSHOPS ATELIER ARTEX BVO gevraagd: 240m² FNO gevraagd: 184m² SLAGWERK BVO gevraagd: 80m² FNO gevraagd: 42m² REGIERUIMTE BVO gevraagd: 14m² FNO gevraagd: 11m² POPSCHOOL BVO gevraagd: 70m² FNO gevraagd: 54m² FNO SO: 54m² OPSLAG FNO gevraagd: 15m² FNO SO: 15m² DANSZAAL BVO gevraagd: 150m² FNO gevraagd: 115m² BERGING DANSZAAL BVO gevraagd: 18m² FNO gevraagd: 14m² KLEEDRUIMTEN BVO gevraagd: 60m² FNO gevraagd: 46m² FNO SO: 48m² ATELIER BVO gevraagd: 90m² FNO gevraagd: 69m² BERGING ATELIER FNO gevraagd: 21m² FNO SO: 21m² MULTIMEDIALAB BVO gevraagd: 18m² OPSLAG ALGEMEEN BVO gevraagd: 30m² FNO gevraagd: 23m² TECHNIEK BVO gevraagd: 44m² FNO gevraagd: 33m² FNO SO: 32m² LIFT BVO gevraagd: 4m² FNO gevraagd: 3m² FNO SO: 3m² OPPERVLAKTEN BVO gevraagd FNO gevraagd (/1.3) FNO SO BVO gevraagd: 310m² FNO gevraagd: 238m² KEUKEN WORKSHOPS BVO gevraagd: 53m² FNO gevraagd: 40m² EXPOSITIE BVO gevraagd:115m² FNO gevraagd: 88m² FNO SO: 91m² THEATER BVO gevraagd: 287m² FNO gevraagd: 220m² FNO SO: 240m² OPSLAG THEATER FNO gevraagd: 26m² FNO SO: 26m² BVO gevraagd: 120m² FNO gevraagd: 92m² SANITAIR MIVA BVO gevraagd: 9m² FNO gevraagd: 7m² SANITAIR OPENBAAR BVO gevraagd: 40m² FNO gevraagd: 30m² YOUNG EVER BVO gevraagd: 150m² FNO gevraagd: 115m² FNO SO: 115m² BIBLIOTHEEK FNO gevraagd: 284m² FNO SO: 334m² begane grond SO: FNO: 143m² eerste verdieping SO: FNO: 191m² UITLEENAPPARAAT MAGAZIJN BVO gevraagd: 45m² FNO gevraagd: 34m² FNO SO: 32m² 5m 10m multimedia/vergadering muziekles slagwerk muziek es popschoo regie opslag instr. doos-in-doos doos-in-doos Lesl.01 Lesl.02 Lesl.03 Lesl.04 Lesl.05 Lesl.06 Lesl.07 (extra) li podi pantry server/repro berging WK BIBLIOTHEEK KANTOREN ARTEX 5m 10m >
>
Ground Floor
First Floor
[ 20
> Wes Facade > North Facade
]
Peyman Baktash > East Facade

Two-O

Practical work at Urban Climate Architects 2022

Two-O is a young and ambitious interior design company where interior objects are designed and built by their team. As a growing company, they planned to move to a new location in Amsterdam, Sloterdijk, to build a new office and workshop of their own to do everything under one roof. The assignment was to design their office/workshop by exposing its wood construction since sustainability is one of the driving goals of Two-O, similar to ours, the architect group.

The design itself is divided into two parts: a workshop with huge machinery, which is noisy and produces a lot of dust, and silent office spaces. Regarding the workshop and offices, a noise and dust study has been done to find the right place for machinery and offices in the building. The volume of the building has been designed based on municipal urban vision, the height of the machines in the workshop, the result of the noise and dust study, and most importantly, considering the park located in the south, which provides a great view for the offices.

Finally, the building has a stepped volume towards the park where the workshop is located on the ground floor and the offices are on top. This arrangement provides access to the roof terrace, allowing workers to enjoy the fresh air and take a break with a view of the park.

Location: Amsterdam, The Netherlands

Team: Amy Stuik & Peyman Baktash.

Participation: SO, VO

[ 22
]
Peyman Baktash

Schematic volume on site location:

To get to an FSI of at least 1, we will use the northern half of plot K10 and build a more compact volume where the workspaces are devided over the first two floors. This double high base layer will be around 8-9 meters high. The second and third floor will have a smaller footprint, with a height accent on the corner of Sierenborch and Luvernes.

Noise & Dust:

Since the “heavy machinery” part is extremely noisy, it has been placed at the furthest point from the offices. In the scheme below, the intensity of the red colour shows the level of noise. The placement of the workshop areas has been determined by the level of noise, the level of dust and most importantly the order of the production process. In general, the workshop areas are placed on the ground floor and first floor. The showroom and offices are placed on the second and third floor.

> Division based on Noise and Dust

[ 24
Ground Floor First Floor Second Floor Third Floor
2nd oor 3rd oor 1st Floor 2nd Floor Extremely Noisy zone + Dust Area Noisy zone + Dust Free Silent zone + Dust Free Noisy zone + Dust Free Silent zone + Dust Free Silent zone + Dust Free Silent zone + Dust Free 1st Floor Extremely Noisy zone Area Noisy zone + Dust Free Noisy zone + Dust Free Silent zone + Dust Free Silent zone + Dust Free Silent zone + Dust Free 2nd oor 2nd Floor Extremely Noisy zone + Dust Area Noisy zone + Dust Free Silent zone + Dust Free Silent zone + Dust Free 2nd oor 3rd oor 1st Floor 2nd Floor Extremely Noisy zone + Dust Area Noisy zone + Dust Free Silent zone + Dust Free Noisy zone + Dust Free Silent zone + Dust Free Silent zone + Dust Free Silent zone + Dust Free

> Volume and site

> Site

]
Peyman Baktash
K10

> References and Initial sketches

[ 26
Katerra - CLT panel factory in Spokane, Washington Kop Zuidas Poppies - Amsterdam by Marc Koehler
]
Peyman Baktash
Pixel façade Urban Residences - KOSCHUCH Architects Zuidas - Amsterdam Koehler Architects
[ 28 00 A 00 A 01 B 01 B 1 A 2 3 4 5 6 B C D E F G H 7 8 9 10 11 I 5130 11170 28500 18050 15005600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600 Sheet storage (ca. 8m hoog) Heavy machinery (ca. 8m hoog) Workshop manager kantoor Workshop Entree Receptie Personeelsingang? -Lijmpers 35 -Werkbanken100 -Laser20 -Opslag 50 (order admin) Lossen (ontvangst) Laadstation vorkheftrucks Laden (zending) CNC CNC Opdeelzaag Zaag Edge Banding machine Sheet storage (ca. 8m hoog) Verkeerszone/expeditie Heavy machinery (ca. 4m hoog) Lift Heavy machinery (ca. 8m hoog) Heavy machinery (ca. 4m hoog) Industrieel liftplatform 54000 3000 3000 3000 00 A 00 A 01 B 1 A 2 3 4 5 6 B C D E F G H 7 8 9 10 11 I Assemblage Packaging Lift Fittings component storage 5600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600 Keuken kleedruimtes douches toiletten opslag fitness meditatie Industrieel liftplatform Sheet storage (ca. 8m hoog) Heavy machinery (ca. 8m hoog) 3000 3000 00 A 1 2 3 4 5 6 7 8 9 10 11 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600 00 A 1 2 3 4 5 6 7 8 9 10 11 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600 Begane grond 1e verdieping 00 A 00 A 01 B 01 B 1 A 2 5 6 B C D E F G H 7 8 9 10 11 I 5130 11170 28500 18050 15005600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 Sheet storage (ca. 8m hoog) Heavy machinery (ca. 8m hoog) Workshop manager kantoor Workshop Entree Receptie Personeelsingang? -Lijmpers 35 -Werkbanken100 -Afval40 -Laser20 -Opslag 50 (order admin) Lossen (ontvangst) Laadstation vorkheftrucks Laden (zending) CNC CNC Opdeelzaag Zaag Edge Banding machine Sheet storage (ca. 8m hoog) Verkeerszone/expeditie Heavy machinery (ca. 4m hoog) Lift Heavy machinery (ca. 8m hoog) Heavy machinery (ca. 4m hoog) Industrieel liftplatform 54000 3000 3000 3000 00 A 00 A 01 B 01 B 1 A 2 3 4 5 6 B C D E F G H 7 8 9 10 11 I Assemblage Packaging Lift Fittings component storage 5600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600 Keuken kleedruimtes douches toiletten opslag fitness meditatie Industrieel liftplatform Sheet storage (ca. 8m hoog) Heavy machinery (ca. 8m hoog) 3000 3000 00 A 01 B 1 A 2 3 5 6 B C D E F G H 7 8 9 10 11 I 5600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 00 A 01 B 1 2 3 4 5 6 7 8 9 10 11 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600
1e verdieping
Begane grond 2e verdieping
>
>
Doorsnede 01B Ground Floor
First Floor
Peyman Baktash ] H I 5130 18050 15005600 5600 H I 5600 5600 00 A 00 A 01 B 01 B 1 A 2 3 4 5 6 B C D E F G H 7 8 9 10 11 I Terras Showroom TWO-O samples lounge meeting rooms Verkeersruimte Kantoorruimte 5600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600 Lift 00 A 00 A 01 B 01 B 1 A 2 3 4 5 6 B C D E F G H 7 8 9 10 11 I 5600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 5600 Kantoorruimte 03 derde verdieping 12800+ P 04 vierde verdieping 16800+ P A B C D E F G H I 03 derde verdieping 12800+ P 1 04 vierde verdieping 16800+ P 2 3 4 5 6 7 8 9 10 11 Begane grond 1e verdieping 2e verdieping 3e verdieping 5130 18050 H I 5600 5600 00 A 00 A 01 B 01 B 1 2 5 6 7 8 9 10 11 Terras Showroom TWO-O samples lounge meeting rooms Verkeersruimte Kantoorruimte 5600 2800 5600 5600 5600 5600 5600 5600 5600 Lift 00 A 00 A 01 B 01 B 1 A 2 5 6 B C D E F G H 7 8 9 10 11 I 5600 5600 5600 5600 5600 5600 5600 5600 5600 2800 5600 5600 5600 5600 5600 5600 5600 Kantoorruimte 03 derde verdieping 12800+ 04 vierde verdieping 16800+ A B C D E F G H I 03 derde verdieping 12800+ P 1 04 vierde verdieping 16800+ P 2 3 5 6 7 8 9 10 11 Begane grond 1e verdieping 2e verdieping 3e verdieping > Second Floor > Third Floor

THE URBAN WOODS Delft

Practical work at Urban Climate Architects 2022

For this project in particular, I joined design team at the VO phase of UW Delft, and I was asked to design the facade and have been working on this project since then. Since the building envelope has a cubic shape and has been open on all sides, the building is wrapped by a grid based on the wood structure with a longer plinth where the communal spaces of the building are located. Facade elements (Grids) have been filled with balconies where in some there is a tree as the signature of The Urban Woods concept. In the following pages, the design of the facade and balconies has been illustrated.

The next step was the sustainability aspect of the project, which by collaboration with specialists in different fields we succeed to adopt a 360° sustainable approach. This wooden building is energy-neutral, climateadaptive, and nature-inclusive - from balcony farming to insect habitation, balustrades with solar panels, and so on.

I am thankful for this project as it has been a learning project for me, from its design challenges to its technical challenges. Owing that the project has a GLT/CLT structure, I developed my knowledge about this sustainable construction method which has to be considered during the design process to ease the construction and lower the total cost of the structure.

More information about it can be found on the website. (www.theurbanwoods.com)

Location: Delft, The Netherlands

Team: Tim Vermeend, Olga Gumienna, Jordy Lubbe & Peyman Baktash.

Participation: SO, VO, DO

[ 30
]
Peyman Baktash © Designed by UCA - Rendered by RenderFabriek

> Mass that fits with the urban context.

> Facade grid with large opening.

> Building envelope and facade concept

> Balcony and shared tree for each household. (Company standard)

[ 32

> solar panels on the roof will provide residents and common areas with electricity

> biobased, sustainable materials - CLT construction

> Shared car - accessible through app

> use of recycled materials

> rainwater collection and filtering through roofs and facade

> sustainable, energy-efficient heating and cooling system

> BREEAM certificate is planned to be obtained as a guarantee for the sustainability of the building

Peyman Baktash ]

As mentioned in the beginning, designing the façade posed the first challenge of this project for me, particularly because the liveliness of the building depended on it. On the other hand, The Urban Woods wished to incorporate trees into the façade. To translate all of these desires into the design, a series of studies on the grids, balconies, and their relationship with the trees were conducted to integrate them into the façade on all four sides

> Initial study per grid

> Seleted prefab

[ 34
> Grid Balcony Tree UW Facade > Finding the best

> Rainwater drainage system for tree irrigation

> Collaboration with “Nest Architect” and “Urban jungle project”

> Two households together in one ‘frame’

Peyman Baktash ] best composition prefab facade element

> Third Floor - Scale 1:250 *

> * Drawings on this page had been done by a group of (assistant) architects and technical designers at Urban Climate Architects in Revit. Collaboration

[ 36
A A B B D D H H K K L L 09. 09. 08 08 04 04 02 02 01 01 F F 07 07 03 03 A A B B E E G G I I 05. 05. 06 06 C C 30880 20700 3550 2250 4030 4030 2250 3550 3400 4100 3820 3600 3600 3820 4100 3400 8,8 m² Gang 03.00.06 8,8 m² Gang 03.00.07 8,4 m² Gang 03.00.08 13,2 m² Voorruimte lift 03.00.01 3,4 m² Hal 03.12.01 0,3 m² Meterkast 03.12.02 1,6 m² Technische ruimte 03.12.03 3,6 m² Badkamer 03.12.04 19,7 m² Woonkamer 03.12.05 10,2 m² Slaapkamer 03.12.06 3,4 m² Hal 03.07.01 0,3 m² Meterkast 03.07.02 1,6 m² Technische ruimte 03.07.03 3,6 m² Badkamer 03.07.04 19,7 m² Woonkamer 03.07.05 10,2 m² Slaapkamer 03.07.06 3,4 m² Hal 03.01.01 0,3 m² Meterkast 03.01.02 1,6 m² Technische ruimte 03.01.03 3,6 m² Badkamer 03.01.04 23,5 m² Woonkamer 03.01.05 10,2 m² Slaapkamer 03.01.06 3,4 m² Hal 03.06.01 0,3 m² Meterkast 03.06.02 1,6 m² Technische ruimte 03.06.03 3,6 m² Badkamer 03.06.04 23,5 m² Woonkamer 03.06.05 10,2 m² Slaapkamer 03.06.06 4,5 m² Hal 03.11.01 0,4 m² Meterkast 03.11.02 1,4 m² Technische ruimte 03.11.03 2,9 m² Badkamer 03.11.04 14,8 m² Woonkamer 03.11.05 11,4 m² Slaapkamer 03.11.06 4,5 m² Hal 03.08.01 0,4 m² Meterkast 03.08.02 1,4 m² Technische ruimte 03.08.03 2,9 m² Badkamer 03.08.04 14,8 m² Woonkamer 03.08.05 11,4 m² Slaapkamer 03.08.06 4,5 m² Hal 03.02.01 0,4 m² Meterkast 03.02.02 1,4 m² Technische ruimte 03.02.03 2,9 m² Badkamer 03.02.04 14,8 m² Woonkamer 03.02.05 11,4 m² Slaapkamer 03.02.06 4,5 m² Hal 03.05.01 0,4 m² Meterkast 03.05.02 1,4 m² Technische ruimte 03.05.03 2,9 m² Badkamer 03.05.04 14,8 m² Woonkamer 03.05.05 11,4 m² Slaapkamer 03.05.06 4,8 m² Hal 03.10.01 0,4 m² Meterkast 03.10.02 1,8 m² Technische ruimte 03.10.03 2,9 m² Badkamer 03.10.04 23,7 m² Woonkamer 03.10.05 9,2 m² Slaapkamer 03.10.06 4,8 m² Hal 03.03.01 0,4 m² Meterkast 03.03.02 1,8 m² Technische ruimte 03.03.03 2,9 m² Badkamer 03.03.04 23,7 m² Woonkamer 03.03.05 9,2 m² Slaapkamer 03.03.06 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 10,7 m² Trappenhuis 03.00.04 5,6 m² Trappenhuis 03.00.05 4,2 m² Liftschacht 03.00.03 2,8 m² Liftschacht 03.00.02 Trap: Optrede: Aantrede: 16 x 190mm 220mm 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 3,5 m² Hal 03.09.01 0,4 m² Meterkast 03.09.02 16,8 m² Woonkamer 03.09.05 8,5 m² Slaapkamer 03.09.06 3,5 m² Hal 03.04.01 0,4 m² Meterkast 03.04.02 16,8 m² Woonkamer 03.04.05 8,5 m² Slaapkamer 03.04.06 1,8 m² Technische ruimte 03.09.03 1,8 m² Technische ruimte 03.04.03 3,4 m² Overige ruimte 03.04.07 3,4 m² Overige ruimte 03.09.07 3,7 m² Overige ruimte 03.11.07 3,7 m² Overige ruimte 03.02.07 3,7 m² Overige ruimte 03.05.07 3,7 m² Overige ruimte 03.08.07 +9220 RM EBV EBV EBV EBV RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM 3400 54 4436 160 3270 54 3396 160 3936 54 3270 160 4436 54 3400 30880 3400 4100 3820 3600 3600 3820 4100 3400 3400 160258654 3480 160 4020 542586160 3400 20700 3550 2250 4030 4030 2250 3550 3400 160258654 3480 150 4030 542586160 3400 3400 54 4436 160 3270 54 3396 160 3936 54 3270 160 4436 54 3400 21dm³/s 21dm³/s 21dm³/s 21dm³/s 21dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 21dm³/s 21dm³/s 14dm³/s 14dm³/s 21dm³/s 14dm³/s 21dm³/s 21dm³/s 14dm³/s 21dm³/s 14dm³/s 14dm³/s 19.4dm³/s 194dm³/s 21dm³/s 21dm³/s 21dm³/s 21dm³/s 21dm³/s 21dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 21dm³/s 14dm³/s 14dm³/s 21dm³/s 14dm³/s 21dm³/s 21dm³/s 14dm³/s 21dm³/s 14dm³/s 14dm³/s 21dm³/s 14dm³/s 21dm³/s 2,9 m² Badkamer 03.09.04 880x2315 930x2315 900x2340 880x2315 630x2315 740x2040 880x2315 880x2315 740x2040 930x2315 900x2340 880x2315 630x2315 880x2315 880x2315 930x2315 900x2340 880x2315 630x2315 740x2040 880x2315 880x2315 740x2040 930x2315 900x2340 880x2315 630x2315 880x2315 740x2040 740x2040 740x2040 740x2040 930x2315 930x2315 930x2315 930x2315 900x2340 900x2340 900x2340 900x2340 2,9 m² Badkamer 03.04.04 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 630x2315 630x2315 630x2315 630x2315 740x2040 740x2040 740x2040 740x2040 900x2340 900x2340 900x2340 900x2340 opstelplaats boompot opstelplaats boompot opstelplaats boompot opstelplaats boompot opstelplaats boompot 30 30 VD LS 30 30 30 30 30 30 30 30 30 30 30 30 LS 30 30 LS 30 30 VD LS VDLS VDLS VDLS VDLS 30 VDLS 30 30 VDLS 30 30 VDLS 30 VDLS 30 VDLS 30 VDLS 30 30 LS LS 30 30 LS LS ANV ANV hwa hwa hwa hwa hwa hwa hwa hwa Trap: Optrede: Aantrede: 17 x 179mm 232mm hwa verlichting verlichting verlichting verlichting verlichting balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m2 balustrade hoogte 1200mm balkon min. 4m2 balustrade hoogte 1200mm balkon min. 4m2 balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm KM KM KM KM V10 EBV EBV hwa hwa hwa hwa hwa hwa hwa hwa 754 7350 754 6500 754 6500 754 7350 754 757 3050 757 5700 757 5700 757 3050 757 757 3050 757 5700 757 5700 757 3050 757 754 7350 754 6500 754 6500 754 7350 754

60 minuten. Een vloer, trap of hellingbaan waarover of waaronder een vluchtroute voert bezwijkt niet binnen 30 minuten bij brand in een (sub)brandcompartiment waarin de vluchtroute niet ligt. Bouwconstructies welke bij brand leidt tot bezwijken van de betreffende brandscheiding bezit dezelfde mate van brandwerendheid m.b.t. bezwijken als de betreffende scheiding.

• Materialen toegepast in koker, schacht of kanaal is voldoet over een dikte van tenminste 0,01 meter aan brandklasse A2 overeenkomstig NEN-EN 13501-1. De bovenzijde van het dak wordt niet brandgevaarlijk uitgevoerd overeenkomstig NEN 6063. Voorzieningen voor afvoer van rook zijn overeenkomstig NEN 6062.

• Een zijde van constructie-onderdelen grenzend aan de binnenlucht voldoen tenminste aan brandklasse D D , voor beloopbaar vlak, D voor pijpisolatie en rookklasse S2, S1fl voor beloopbaar vlak, S2 voor pijpisolatie overeenkomstig NEN-EN 13501-1. Electrische leidingen voldoen tenminste aan brandklasse Dca en rookklasse S2ca overeenkomstig NEN-EN 13501-6. In afwijking hierop is deze van extra beschermde vluchtroutes en van binnenzijde liftschacht brandklasse B, Cfl voor beloopbaar vlak, B voor pijpisolatie, B2ca voor elektrische leidingen en rookklasse S2, S1fl voor beloopbaar vlak, S1 voor pijpisolatie

Peyman Baktash ] Collaboration between group members (as mentioned at the beginning) and Peyman Baktash. 09. 08 09. 08 04 02 01 07 03 05. 06 A B D H K L F E G I C boompot boompot boompot boompot boompot boompot boompot boompot boompot A B D C 1 100 Zuidwestelijke aanzicht 1 100 Noordwestelijke aanzicht 1 4 3 2 2 2 5 6 7 8 8 9 groene gevel (vegetatie) (te openen glazen panelen) (te openen glazen panelen) (te openen glazen panelen) (te openen glazen panelen) (te openen glazen panelen) (te openen glazen panelen) (te openen glazen panelen) (te openen glazen panelen) (te openen glazen panelen) ! ALLE MAATVOERING IN HET WERK TE METEN CQ. TE CONTROLEREN ! ! BOUWAANVRAAG TEKENINGEN ZIJN GEEN WERKTEKENINGEN ! Beton Loopslot/Deur zonder sleutel en onmiddelijk te openen over de tenminste vereiste breedte Vloer-/ Wand-/ Deur-/ Raam-/ Luikconstructie -dubbelzijdig brandwerend (WBDBO conform de NEN 6069) Mechanisch afzuigpunt e.a. conform NEN 1087 Vloer-/ Wand-/ Deur-/ Raam-/ Luikconstructie -enkelzijdig brandwerend (WBDBO conform de NEN 6069) Centrale verwarmingsketel RENVOOI Riolering vuilwater conform NEN 3215 Trapleuningen minimaal 900+trede. Leuning trap gelijk aan balustrade met extra handregel langs wand. Balustrades minimaal 1000+vl (o.k. voetregel tot b.k. handregel), spijlen ∅20 hoh 100mm. Transparante verlichtingsinstallatie conform de NEN 3011 Ruimte voorzien van noodverlichting Mechanisch aanvoerpunt e.a. conform NEN 1087 Ruimte voorzien van rookmelder conform NEN 2555 ANV RM Riolering hemelwater afoer conform NEN 3215 Extra Beschermde Vluchtroute EBV Deur zelfsluitend Losse (hand)brandblusser; koolzuur/poeder/... e.e.a conform het besluit 'Draagbare blustoestellen' Brandweerlift Droge blusleiding Tegelwerk toilet: mimimaal 1,2 meter boven vloer e.a. volgens NEN 2778 Tegelwerk badkamer: mimimaal 2,1 meter boven vloer e.a volgens NEN 2778 30 min brandwerendheid en R200 rookwerend 60 min brandwerendheid en R200 rookwerend 30/60/90 30/60/90 Isolatie Binnenwand, conform Bouwbesluit Scheidingswand, conform Bouwbesluit Bovenliggende constructie houten balken Massiefhout, (kruislings) gelamineerd Tegels Vrijloopdranger deur VD LS BRANDVEILIGHEID RIOLERING & INSTALLATIES Verlichting KM Deur op kleefmagneet Riolering vuilwater ontluchting A Tweemolentjeskade Wilgenlaan Noordwest aanzicht SITUATIE Meidoornlaan Zuidoost aanzicht Zuidwest aanzicht Noordoost aanzicht N ALGEMENE BEPALINGEN Brandveiligheid: • Constructieve gegevens/berekeningen volgens opgave constructeur. Bij brand in een brandcompartiment bezwijken niet aangrenzende bouwconstructies in ander brandcompartiment niet gedurende tenminste
en S1ca voor elektrische leidingen. Een zijde van constructie-onderdelen grenzend aan de buitenlucht voldoen tenminste aan brandklasse D, Dfl voor beloopbaar vlak, D voor p ijpisolatie overeenkomstig NEN-EN 13501-1. Elektrische leidingen voldoen tenminste aan brandklasse Dca overeenkomstig NEN-EN 13501-6. In afwijking hierop is deze voor extra beschermde vluchtroutes brandklasse C, Cfl voor beloopbaar vlak, B voor pijpisolatie, B2ca voor elektrische leidingen en B vanaf het aansluitend terrein tot een hoogte van ten minste 2,5 meter en vanaf 13 meter. Van de hierboven gestelde klassen hoeft ten hoogste 5 % van het totale oppervlakte van een ruimte behoeft niet te voldoen aande gestelde brandklasse en 10 % niet aan de gestelde rookklasse Voorts dienen de geveldelen, uitgezonderd gevelopeningen, van brandcompartimenten te voldoen aan brandklasse B te voorkoming brandoverslag. • Voor de brandwerendheid van een constructieonderdeel dient voldaan te worden aan de criteria volgens de NEN 6069. Hierin zijnde volgende beoordelingscriteria opgenomen: bezwijken (R), vlamdichtheid (E), temperatuur (I) en warmtestraling (W). • Rookmelders woningen volgens primaire inrichtingseisen volgens NEN 2555. Eventuele aanvullende gekoppelde rookmelders indien vereist geluidsniveau in verblijfsruimten binnen de woning niet wordt behaald Overig: •
op bestaande
en
en dimensionering
conform
constructeur • Oppervlaktes conform NEN 2580 • Geluidwering conform NEN 5077 • Ventilatie conform NEN 1087 • Natte ruimten en keuken voorzien van mechanische ventilatie afvoer • Daglichttoetreding conform NEN 2057 • Electrische installatie minimaal conform NEN 1010 • Deuren, ramen, kozijnen en daarmee gelijk te stellen constructieonderdelen in een scheidingsconstructie van een niet-gemeenschappelijke ruimte die volgens NEN 5087 bereikbaar zijn voor inbraak, hebben een volgens NEN 5096 bepaalde inbraakwerendheid die voldoet aan de in die norm aangegeven weerstandsklasse 2. • Indien er afgeweken wordt van de vergunde omgevingsaanvraag, dienen de wijzigingen schriftelijk vooraf ter goedkeuring aan degemeente te worden voorgelegd! VOOR ALLE GENOEMDE NORMEN ZIJN DE LAASTE UITGEGEVEN VERSIES INCL. WIJZIGINGSBLADEN VAN TOEPASSING! VOOR MEER INFORMATIE ZIE RAPPORTEN VAN ADVISEURS! project onderdeel revisie wijzigingsdatum omschrijving van wijziging Torenlocatie, Delft Bouwaanvraag Plattegrond derde verdieping Woongebouw The Urban Woods > North Facade - Scale 1:250 *
Riolering en waterleidingen aansluiten
hoofdafvoer • Alle constructieve gegevens, berekeningen
tekeningen, maatvoering
voledig
opgave

> A view of Revit model of the project (Enscape export) Working with BIM

[ 38
]
Peyman Baktash
[ 40 98 15300+PVijfdeverdieping 2970+P 178 20 Glazen balustrade, conform opgave leverancier (met geïntegreerde pv-panelen waar nodig) Planken Aluminium profiel, kleur: Champagne/Beige Aluminium staanders, conform opgave leverancier en constructeur kleur: Champagne/Beige Balkonconstructie conform opgave balkonleverancier Terrazo imitatie afwerking, kleur: groen met witte accenten Balkonconstructie conform opgave balkonleverancier HWA in verdikte gevelopbouw verslepen Goot t.b.v. afwatering balkon Roostervloer t.b.v. overgang Wandopbouw (on-bo) (Rc= min. 4,7 m²k/W): -2x gipsplaat 12,5mm -Dampremmende folie -HSB constructie incl. isolatie conform opgave adviseur -Cementgebondenplaat 12mm -Isolatieplaat, dikte conform opgave adviseur -Waterkerende folie -Gevelpanelen -kleur wit (met geïntegreerde pvpanelen waar nodig) CLT balk, afmeting conform opgave constructeur Stelruimte vullen met isolatie Aluminium kozijn, Kleur: Champagne/Beige Triple beglazing, glasopbouw conform opgave adviseur Vloeropbouw (on-bo): -CLT vloerplaat 180mm -Ballastlaag 70mm -Isolatielaag 40mm -Cementdekvloer incl. vloerverwarming 60mm 1200 100 295 310 210 520 180704060 350 Aanzicht kolom V05 project schaal tekening formaat datum Kantoor Groningen: Poelestraat 44 9712 KC Groningen Kantoor Delft: Spoorsingel 23 2613 BE Delft tel: 085-273 54 11 www.ucarchitects.com info@ucarchitects.com "DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever-Architecten van Toepassing" URBAN CLIMATE ARCHITECTS revisie wijzigingsdatum omschrijving van wijziging 28-10-2022 2307 B-510.05 1:10 Bouwaanvraag A3 Detail V05 Torenlocatie, Delft 98 15300+PVijfdeverdieping 15130+P 14660+P 20 Aanzicht glazen balustrade Planken Aluminium profiel, kleur: Champagne/Beige Balkonconstructie conform opgave balkonleverancier Terrazo imitatie afwerking, kleur: groen met witte accenten Balkonconstructie conform opgave balkonleverancier HWA in verdikte gevelopbouw verslepen Goot t.b.v. afwatering balkon Roostervloer t.b.v. overgang Wandopbouw (on-bo) (Rc= min. 4,7 m²k/W): -2x gipsplaat 12,5mm -Dampremmende folie -HSB constructie incl. isolatie conform opgave adviseur -Cementgebondenplaat 12mm -Isolatieplaat, dikte conform opgave adviseur -Waterkerende folie -Gevelpanelen -kleur wit (met geïntegreerde pvpanelen waar nodig) CLT balk, afmeting conform opgave constructeur Stelruimte vullen met isolatie Aluminium kozijn, Kleur: Champagne/Beige Triple beglazing, glasopbouw conform opgave adviseur Vloeropbouw (on-bo): -CLT vloerplaat 180mm -Ballastlaag 70mm -Isolatielaag 40mm -Cementdekvloer incl. vloerverwarming 60mm 295 310 210 520 180704060 350 Aanzicht kolom Constructie en bevestiging pot conform opgave balkonleverancier en constructeur Balkon voorzien van wortelwerende/waterdichte doek en vullen met grond Onderlicht uitvoeren met dicht paneel, kleur als kozijn Boompot Aluminium kozijn, Kleur: Champagne/Beige Triple beglazing, glasopbouw conform opgave adviseur 295 100 520 100 V06 project schaal tekening formaat datum Kantoor Groningen: Poelestraat 44 9712 KC Groningen Kantoor Delft: Spoorsingel 23 2613 BE Delft tel: 085-273 54 11 www.ucarchitects.com info@ucarchitects.com "DNR 2011" "Standaardvoorwaarden 2011 Rechtsverhoudingen opdrachtgever-Architecten van Toepassing" URBAN CLIMATE ARCHITECTS revisie wijzigingsdatum omschrijving van wijziging 28-10-2022 2307 B-510.06 1:10 Bouwaanvraag A3 Detail V06 Torenlocatie, Delft > Vertical Detail of Balcony - Scale 1:40 * > Vertical Detail of Balcony with tree’s pot - Scale 1:40 * > Technical floor plans of A B D 04 02 01 03 A B 05. 06 C 3,4 m² Hal 1,6 m² Technische ruimte 03.12.03 3,4 Hal 03.07.01 1,6 m² Technische ruimte 03.07.03 3,6 m² Badkamer 03.07.04 10,2 m² Slaapkamer 03.07.06 4,5 m² Hal 03.11.01 0,4 m² Meterkast 03.11.02 2,9 m² Badkamer 03.11.04 4,5 m² Hal 03.08.01 0,4 m² Meterkast 03.08.02 1,4 m² Technische ruimte 03.08.03 2,9 m² Badkamer 03.08.04 14,8 m² Woonkamer 03.08.05 11,4 m² Slaapkamer 03.08.06 4,8 m² Hal 03.10.01 0,4 m² Meterkast 03.10.02 1,8 m² Technische ruimte 03.10.03 2,9 m² 23,7 m² Woonkamer 03.10.05 9,2 m² Slaapkamer woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 930x2315 930x2315 930x2315 930x2315 60 60 60 60 60 60 60 60 60 60 60 3,5 m² Hal 03.09.01 0,4 m² Meterkast 03.09.02 16,8 m² Woonkamer 03.09.05 8,5 m² Slaapkamer 03.09.06 1,8 m² Technische ruimte 03.09.03 3,4 m² Overige ruimte 03.09.07 3,7 m² 3,7 m² Overige ruimte 03.08.07 RM RM RM RM RM RM RM RM RM 3400 4100 3820 20700 3550 2250 4030 4030 3400 160258654 3480 150 4030 542586160 3400 54 4436 160 3270 21dm³/s 21dm³/s 21dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 14dm³/s 21dm³/s 14dm³/s 21dm³/s 21dm³/s 2,9 m² Badkamer 03.09.04 880x2315 880x2315 740x2040 880x2315 740x2040 900x2340 880x2315 630x2315 880x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 630x2315 630x2315 740x2040 740x2040 900x2340 900x2340 opstelplaats boompot opstelplaats boompot 30 VDLS 30 VDLS 30 VDLS 30 VDLS hwa hwa verlichting verlichting balkon min. 4m2 balustrade hoogte 1200mm balkon balustrade balkon min. 4m 2 balustrade hoogte 1200mm balkon min. 4m balustrade hoogte 1200mm hwa hwa 5700 757 5700 757 3050 757 754 7350 754
Peyman Baktash ] of one-bedroom
1:100 > Commercial
of one-bedroom
H K L F E G I 8,8 m² Gang 03.00.06 8,8 m² Gang 03.00.07 8,4 m² Gang 03.00.08 13,2 m² Voorruimte lift 03.00.01 3,4 m² Hal 03.07.01 0,3 m² Meterkast 03.07.02 19,7 m² Woonkamer 03.07.05 3,4 m² Hal 1,6 m² Technische ruimte 03.01.03 3,4 m² Hal 03.06.01 0,3 m² Meterkast 03.06.02 23,5 m² Woonkamer 03.06.05 4,5 m² Hal 03.02.01 0,4 m² Meterkast 03.02.02 2,9 m² Badkamer 03.02.04 4,5 m² Hal 03.05.01 0,4 m² Meterkast 03.05.02 2,9 m² Badkamer 03.05.04 11,4 m² Slaapkamer 03.05.06 4,8 m² Hal 03.03.01 0,4 m² Meterkast 03.03.02 1,8 m² Technische ruimte 03.03.03 2,9 m² 23,7 m² Woonkamer 03.03.05 9,2 m² Slaapkamer woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 woonmatje 11m2 10,7 m² Trappenhuis 03.00.04 5,6 m² Trappenhuis 03.00.05 4,2 m² Liftschacht 03.00.03 2,8 m² Liftschacht 03.00.02 Trap: Optrede: Aantrede: 16 x 190mm 220mm 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 930x2315 60 60 60 60 60 60 60 60 60 3,5 m² Hal 03.04.01 0,4 m² Meterkast 03.04.02 16,8 m² Woonkamer 03.04.05 8,5 m² Slaapkamer 03.04.06 1,8 m² Technische ruimte 03.04.03 3,4 m² Overige ruimte 03.04.07 +9220 EBV EBV EBV EBV RM RM RM RM RM RM RM RM RM 30880 3600 3600 3820 4100 3400 54 3396 160 3936 54 3400 21dm³/s 21dm³/s 21dm³/s 14dm³/s 14dm³/s 21dm³/s 14dm³/s 14dm³/s 21dm³/s 21dm³/s 19.4dm³/s 19.4dm³/s 21dm³/s 21dm³/s 930x2315 930x2315 880x2315 930x2315 880x2315 740x2040 740x2040 930x2315 880x2315 740x2040 740x2040 930x2315 930x2315 900x2340 900x2340 930x2315 930x2315 930x2315 630x2315 740x2040 740x2040 900x2340 900x2340 opstelplaats boompot 30 30 VD LS 30 30 30 30 30 30 30 30 30 30 30 30 30 30 LS 30 30 LS 30 30 VD LS VDLS VDLS VDLS VDLS 30 30 30 VDLS 30 30 VDLS 30 30 30 30 30 LS LS 30 30 LS LS ANV ANV hwa hwa hwa Trap: Optrede: Aantrede: 17 x 179mm 232mm hwa verlichting balkon min. 4m2 balustrade hoogte 1200mm balkon min. 4m2 balustrade hoogte 1200mm balustrade hoogte 1200mm balustrade hoogte 1200mm KM KM KM KM EBV EBV hwa 6500 754 6500 754 7350 754
apartments - Scale
floor plans
apartments.

> Interior view, exposed CLT/GLT structure

[ 42
© Designed by Urban Climate Architects - Rendered by RenderFabriek
]
Peyman Baktash © Designed by Urban Climate Architects - Rendered by RenderFabriek > Entrance view
[ 44
© Designed by Urban Climate Architects - Rendered by RenderFabriek
]
Peyman Baktash

Thanks for your time to review my

peyman.baktash.pb@gmail.com

Peyman Baktash

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Portfolio 2024 - Peyman Baktash by Peyman Baktash - Issuu