GSTT Orthopaedic Centre of Excellence London, UK Client: Guy’s and St Thomas’ NHS Trust
The Orthopaedic Centre of Excellence (OCE) at Guy’s
Size: 7,500m2 (new build)
Hospital will be a 7,500sqm state-of-the-art facility which
Completion Due: 2028
will include eight new theatres, prep and recovery areas,
Sustainability: Target - BREEAM Excellent
outpatients and diagnostics and therapies specifically for
Cost: £109million
orthopaedic patients. Additionally, it will contain teaching/ training and research and innovation.
― WHY IT’S RELEVANT TO IMPERIAL
•
As a hub of excellence for education and training, it will enable an innovative approach to the development of a
Extension of acute services adjacent to existing Guy’s tower with research and education facilities
comprehensive research portfolio which in turn will lead to
•
State of the art surgical suites
Pond and connected into the existing hospital buildings. The
•
Tight hospital site requiring innovative clinical planning and plant strategies
•
Use of MMC and DfMA to reduce programme, cost and site set-up area.
improved outcomes for patients, as well as the ability of the network to attract substantial research funding. The OCE will be located in a new building along Great Maze location of the site presents a number of constraints for the design and construction logistics in terms of maintaining pedestrian access to the main hospital entrance, very limited loading and materials storage space and the close proximity of the boiler house and numerous live hospital departments. The project takes account of these as key driving factors in the design development process.