1 minute read

DESIGN PROCESS

It was decided to generate a route through nature, based on this existing topography that would surround the lake and connect directly to the existing building.

Advertisement

In this route you can find 4 additional main areas where you can develop multiple activities with their own environment, without losing the connection with the lake.

To better connect these three large built-up areas, it was decided to add a commercial promenade running over the lake, in order to shorten times and distances for some users.

Of these 4 new areas, 2 were intended to be built up so that they could have their independent land uses and the other 2 would be for small buildings immersed in nature.

The concept is to generate a community with something of the tradition of the central neighbourhoods, therefore in the built-up areas central public spaces were created that allow for this social gathering, accessible from anywhere.

This article is from: