patriciaandresramirez@gmail.com +447413422266 London, UK https://portfolio5138.webnode.co.uk 2020 - CURRENT SENIOR ARCHITECT
PORTFOLIO PATRICIA
.
ANDRES RAMIREZ
The Berkeley Hotel London. Site Progress 2020-2023 The Berkeley Hotel London. Site Progress 2020-2023
Architectural Coordinator / Design Consultant, April 2020 – Current
The Berkeley Hotel, London, UK. 2020-2023
Architectural Coordinator during Stage 5
Architect: Richard Rogers + Partners
Client: Maybourne Hotel Group
7,000 sq. m. New wing plus refurbished existing hotel
Overlooking Hyde Park, The Berkeley Hotel celebrates contemporary architecture with a new nine-storey-high wing design by Richard Rogers and Partners.
With planning permission being granted in 2017, The Hotel aims to provide the highest quality 5 star accommodation, increase the number and type of hotel rooms, upgrade the public areas, bars and restaurants plus provide a new spa and pool facility.
The Berkeley Hotel London. Site Progress 2020 - 2023
The Berkeley Hotel New Wing. West Elevation
The Berkeley Hotel New Wing. Internal View of the floorplate. Composite deck rebar installation prior pouring of the concrete
Stainless steel forks of the tensioning rods tying the top of the superstructure or ‘The Crown’
The Berkeley Hote, 33 Knightsbridge Road. New Wing and Refurbished Block. North Elevation.
The Berkeley Hotel London. Site Progress 2020 - 2023 The Berkeley Hotel London. Site Progress 2020 - 2023
The Berkeley Hotel New Wing. Internal view of the concrete elliptical wall forming the stair shaft of the Spa. Photograph by Nick Carter.
The Berkeley Hotel. Ground Floor Plan
The Berkeley Hotel. Level 07 - Typical Floor Plan
The Berkeley Hotel London. Site Progress 2020 - 2023 The Berkeley Hotel London. Site Progress 2020 - 2023
Basement. Internal view of the elliptical wall. Concrete works completed. View of the Ground Floor Slab
Erection of the lateral external trusses. Lift of a ‘K’ brace piece
Steelwork node. Splicing of beams.
Main facade erection. Unitised DGU and juliet balcony panel Erection of the lateral external trusses. East elevation.
The Berkeley Hotel London. Site Progress 2020 - 2023 The Berkeley Hotel London. Site Progress 2020 - 2023
East facade view. Photograph by Nick Carter.
Top external structure assembly . Photograph by Nick Carter.
Top external structure assembly . Photograph by Nick Carter.
Rogers Stirk Harbour + Partners
Top node of the external structure. View from level 10. Photograph by Nick Carter.
Drawings of the top beams by RSHP.
New Building Fire Stair
The Berkeley Hotel, London, UK. 20202023
Design Coordinator onsite between Design Team and Steel and Facade Subcontractors.
South elevation. Fire stair steelwork erection.
Stair landing detail
Stair component concept sketch
Stair component concept sketch
The Berkeley Hotel new wing. Fire stair steelwork erection.
The Berkeley Hotel new wing. Fire stair steelwork erection. Fire stair base acoustic connection to concrete slab.
The Berkeley Hotel, London, UK. 2020-2022
Knightsbridge Entrance Stair
Project Architect from Concept Design to Stage 5
Knightsbridge Entrance Stair. Axonometric view
Knightsbridge Entrance Stair. 3D view from basement level
Knightsbridge Entrance Stair. Lighting and nosing detail
Knightsbridge Entrance Stair. Upper flight site photo
Penthouse Gym Pavilion
The Claridge’s Hotel, London, UK. 2020-2022
Project Architect from Concept Design to Stage 4
This glass pavilion houses a private gym for the penthouse suite at Claridge’s. Its unique location presented structural and technical challenges as it sits over the glass roof of one of the hotel’s courtyard.
Gym pavilion. View from internal atrium
Claridge’s roof plan. Gym pavilion plan on the left and Piano pavilion on the right hand side
Gym pavilion section through entrance steps.
Picture with the team inside the finished pavilion. Timber finishings and square skylight.
Gym pavilion. View from internal atrium.
Gym pavilion 3D view. Roof architectural intent
Gym pavilion 3D view. Floor support and main structural frame
Internal view of the gym pavilion. Ceiling lighting
The Claridge’s Hotel, London, UK. 2020-2022
Project Architect from Concept Design to Stage 4
Penthouse Piano Pavilion
External view of the piano pavilion. Photograph by Nick Carter. Claridge’s piano pavilion. View from the penthouse suite. Photograph by Nick Carter.
Gym pavilion Eave detail.
Opposite the Gym Pavilion on the Victorian wing of Claridge’s, the Piano pavilion was designed to bookend the views from the other side of the penthouse suite. Minimalistic language is used with full glazed walls and a flat copper roof.
Internal view of the piano pavilion. Photograph by Nick Carter.
Piano pavilion. Eave and downpipe detail Gym pavilion section. Gym pavilion 3D view.
The Maybourne Riviera Hotel, Roquebrune-Cap-Martin, France 2020
External Terrace Stairs (Opposite page)
The Maybourne Riviera Hotel, Roquebrune-Cap-Martin, France 2020
Project Architect from Concept Design to Stage 4
As the lower portion of one of the main staircases, the feature glass stair at ground floor aims to disappear on the eye of the guests allowing breathtaking views towards the sea. Stainless steel and structural glass materialise this stair in an industrial but carefully crafted language. Two additional external steel stairs bring a pop of colour using a similar language (opposite page).
Feature Entrance Stair
External stairs concept sketch. Different options for discussion.
External stairs. Picture from the workshop.
Concept 3D views.