Technical requisites

Page 18

Technical Requisites _ Pantelis Charalambides WSA 5

The internal/partion walls will be made out of gabion walls and will use the medium sized rocks from the by-products (40mm-150mm). In cases where sound or thermal insulation is needed such as the walls looking into the courtyards and spaces that need sound insulation between them they will be double-layered with insulation in-between them

Low Carbon Strategy

2) Internal/Partition Walls:

Total stone (40-150mm) needed for partition walls: 427m3

Amount of medium sized rocks by-products from daily limestone production: in Ipsonas: 28-35T (4050% of daily production)

18


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.