Portfolio Preety Anand: Professional work experience

Page 1

PREETY ANAND PORTFOLIO II


Preety Anand Architect Dipl. Ing. Architecture / MArch born on 05.04.1983 in Frankfurt/Main (Germany) Nationality: German


2015/16 2015 2014 2013

Hamad International Airport// Doha, Qatar

Aviation/ Infrastructure

52 Lime Street // London

Commercial

MGM Cotai // Macau

Mixed use, Commercial

MIST Housing Masdar City// Masdar [UAE] King Khalid International Airport// Riyadh [UAE] Al Reem Island// Abu Dhabi [UAE]

Feasibility study Aviation Masterplan

RMJM London

West Twyford Primary School// Ealing

Education

AStudio London

Birmingham New Street Station// Birmingham [UK] Infrastructure

20082011 2007/08 2007 2006

Foster & Partners London Kohn Pedersen Fox London

Haskoll London

Deutsche Bank “Green towers” // Frankfurt M.

Mixed use Commercial Refurbishment

gmp Architekten Frankfurt am Main

Indoor Swimming Pool// Aschaffenburg, Germany Canteen _ University of Bremen// Bremen

Refurbishment Leisure Hospitality

pbr Planungsbüro Frankfurt am Main

Einkaufszentrum Riedberg// Frankfurt M., Germany Residential Commercial Cologne Science Center// Heidenheim, Germany University Heidenheim// Heidenheim, Germany

Competitions

Schneider+Schumacher Frankfurt am Main Albert Speer und Partner Frankfurt am Main


2015/2016 Hamad International Airport// Doha, Qatar Signage and wayfinding Equipment and furniture Concept, design, graphics and technical detailling of digital and analogue airport signage / equipment and furniture

Foster + Partners, London


Arrivals

DIGITAL AND ANALOGUE SIGNAGE AND EQUIPMENT

Departures


Typical detail pendant signage


Typical detail pendant signage


Garden signage


FLight information display detail


2015 52 Lime Street // London Detail design & coordination / Design studies Tasks: Basement and office tower insulation details Boundary issue: Assessment of survey of neighbouring building / Identification of clashes / redesign & technical coordination of interfacing cladding Structural coordination of substructure B3- L01 Structural coordination lobby escalators MEP coordination

KPF, London


B

C 6000

D

E

6000

F

6000

G

6000

H

6000

J

6000

L

K

6000

M

6000

P

N

6000

6000

R

S

6000

6000

WRBC DEVELOPMENT UK LIMITED

1 A-210

B

40 Lime Street London, EC3M 7AY, UK CONSULTANTS:

A

Kohn Pedersen Fox Associates (International) PA 7a Langley Street London, WC2H 9JG, UK TEL: +44 (0)20.3119.5300

C 6000

KPF

Architect

D 6000

E 6000

F 6000

G 6000

H 6000

J 6000

L 6000

M 6000

P 6000

R

S

6000

6000

CANOPY ABOVE

LARGE CAR

14

+/- 16.400

1524

BOX VAN

BOX VAN

OUTLINE OF 38 LEADENHALL

125

FFL= +16.589 1:45 FALL

00 90

BOH TOILET LOBBY

1:60 FALL

FFL= +16.252

10

+/- 16.430

FFL=+16.450

SECURITY ACCESS CONTROL ROOM

FFL= +16.159

00 90

R-05

+/- 16.430

11

LIFT LR-2

R-07

R-04

WESTERN STAIR LOBBY FFL= +16.400

HIGH / MID RISE LIFT LOBBY

LIFT MR-2

LIFT LR-4

00 90

FFL= +16.550

LIFT MR-1

LIFT LR-3

LOW RISE LIFT LOBBY

FIRE CURTAIN

27/01/14

PLANT

6 CAFE STAIR AND SECURITY AMENDED, OIL FILL POINT ADDED

02/12/13

OFFICE

BI-FOLD DOOR

5 REVISED REVOLVING DOORS AND CAFE ENTRANCE DOORS, REVISED CYCLE LIFT SHAFTS, REVISED CAFE SERVICE STAIR,

28/10/13

VEHICLE BLOCKER

4 REVISED STAIRS, KIOSK ENTRY, BOH RECEPTION AND ACOMMODATION STAIR

LIFT HR-1

LIFT HR-2

R-11

R-12

LIFT MR-3

LIFT HR-3

LIFT MR-4

FIRE FIGHTING LIFT F-1

FFL= +16.200

GOODS LIFT GL-2

FIRE CURTAIN

6000

14 CYCLE LIFT C-1

BICYCLE LOBBY FFL= +16.200

CYCLE LIFT C-2

5

14

ANNEX RISER

FFL = +16.180

R-13

R-14

CHANNEL DRAIN

+16.030

GOODS LIFT GL-1

DOCK MANAGERS OFFICE

UKPN 11kV ROOM 2

FFL= +16.070

FFL= +16.100

EMERGENCY FILL POINTS

SECURITY ROOM FFL= +16.200

14

26/07/13

28/03/13

1 REVISED UKPN ROOM LAYOUT, REPLANNED RECEPTION BOH, BILLITER STREET LAYOUT MODIFY, CAFE SERVICE ROUTE REPLANNED

25/02/13

Description

LEVEL 34 FFL= +154.750 m AOD

W.C

OFFICE

LEVEL 33 FFL= +150.825 m AOD

W.C

LEVEL 32 FFL= +146.900 m AOD

Date

FOR DRAWING LEGEND REFER:KPF A-002

OFFICE

W.C

LEVEL 29 FFL= +135.125 m AOD

W.C

OFFICE

7

LEVEL 30 FFL= +139.050 m AOD

W.C

OFFICE

R-19

LEVEL 31 FFL= +142.975 m AOD

W.C

OFFICE

LEVEL 28 FFL= +131.200 m AOD

W.C

00 90

LEVEL 27 FFL= +127.275 m AOD

KEY PLAN:

OFFICE

+/- 16.380 14 POSITION OF WOODFORD STONES REFER TO A-301

CR

OFFICE

1 A-400

Scale Drawn By

2m

4m

6m

8m

10m

DRAWING NO.

LEVEL 23 FFL= +111.575 m AOD

W.C

LEVEL 22 FFL= +107.650 m AOD

W.C

OFFICE

14

LEVEL 17 FFL= +88.025 m AOD

W.C CR

W.C

MR

MR

W.C

OR

OR

W.C

LOW RISE LIFT SHAFT

LEVEL 18 FFL= +91.950 m AOD

W.C

OFFICE

BUILDING SECTION C:\Users\jpalmer\Documents\1972_ARCH_KPF_MAIN_jpalmer.rvt

LEVEL 19 FFL= +95.875 m AOD

W.C

OFFICE

OFFICE

LEVEL 20 FFL= +99.800 m AOD

W.C

OFFICE

REVISION

LEVEL 21 FFL= +103.725 m AOD

W.C

OFFICE

© 2015 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.

-210 0/12/2013 15:17:11

LEVEL 24 FFL= +115.500 m AOD

W.C

OFFICE

MB

A-100

LEVEL 25 FFL= +119.425 m AOD

W.C

1972

PLAN GROUND LEVEL 0m

LEVEL 26 FFL= +123.350 m AOD

W.C

OFFICE

GROUND LEVEL FLOOR PLAN SCALE: 1 : 100

OR

14/01/13 1 : 100 @ A0

Project No.

W.C

OFFICE

Kohn Pedersen Fox Associates (International) PA

Issue Date:

MR

OFFICE

N

KPF

1

LEVEL 35 FFL= +158.675 m AOD

W.C

OFFICE

+/- 16.680

13

LEVEL 36 FFL= +162.450 m AOD

NOTES:

LIGHTING BOX

+16.180

14

PLANT

W.C

OFFICE

16/09/13

3 REVISED UKPN AND CAFE SERVICE ACCESS LAYOUT, LOW RISE LIFT SHIFTED SOUTHWARDS, DEEPER GOODS LIFTS

RETAIL KIOSK (SHELL) FFL= +16.200

14

R-15

+/- 16.680

LEVEL 37 FFL= +167.080 m AOD OR

OFFICE

R-16

EASTERN STAIR

LEVEL 38 FFL= +170.450 m AOD

CHILLERS

UKPN 11kV ROOM 2 LOBBY FFL=+16.050 CANOPY ABOVE

14

FIRE FIGHTING LIFT / STAIR LOBBY FFL= +16.400

PLN LEVEL 39 FFL= +174.375 m AOD

6

+16.180 R-18

PLN LEVEL 40 FFL= +178.300 m AOD

2 REVISED RECEPTION AREA, REVISED UKPN ROOM STAIRS, REVISED SECURITY ROOM LOCATION

No.

PLN LEVEL 41 FFL= +182.225 m AOD

2 A-210

ANNEX STAIR +16.030

R-03

12

7 REVISED WESTERN STAIR EXIT AND SECURITY ROOM; REVISED ENTRY TO TURNSTILE CONTROL ROOM, BOH TOILET AND RISER 5; RELOCATED RISER 20

+16.030

OIL FILL POINT

FFL = +16.180

R-09

SUPPLY AIR PLANT ROOM +/- 16.530

FFL= +16.030

FFL= +16.199 FFL= +16.276

R-08

R-10 LIFT LR-1

28/02/14

4

1:60 FALL

FFL= +16.090

14 RISER ACCESS

CHANNEL DRAIN

1:80 FALL

CHANNEL DRAIN

14

PLANT REPLACEMENT HATCH

FFL= +16.030

14

MEZZANINE SLAB EDGE ABOVE

8 STORAGE CHANGED TO SECURITY ACCESS ROOM, UKPN LEVELS REVISED,CYCLE ENTRY MATWELL ADDED, KIOSK DOOR REMOVED, BOH TOILET AND BLAST WALL ARRANGEMENT REVISED, COLUMN LOCATIONS UPDATED, DOORS UPDATED, LIGHTING BOX ADDED

FFL = +16.180

RISING ARM BARRIERS

FFL= +16.400 M AOD

NOTIONAL

EDGE OF CONCRETE UPSTAND

14

EAST CORRIDOR

00 90

LOADING BAY 1045

14 CAFE (SHELL)

21/03/14

6000

FFL= +16.400

RECEPTION ACCESSIBLE VISITORS TOILET

6000

FFL= +16.400

FEATURE STAIR

FUTURE ACCESSIBLE WC LOCATION BY TENANT

9 CYLE LIFT OPENINGS REVISED PER LIFT CONTRACTOR DRAWINGS; DOOR AND SECURITY WINDOW LOCATION ADJUSTED PER DTZ REQUEST, REVISED RETAIL AND RESTAURANT ENTRY LEVELS, ENTRANCE MATTING ADDED

1:80 FALL

CORRIDOR

RECEPTION COAT ROOM

+/- 16.400

25/04/14

3 FFL= +16.400

9

6000

BOH TOILET

10 WESTERN STAIR LOBBY,UKPN ROOM AND LOBBY FFL HTS ADJUSTED; FIRE FIGHTING FINAL EXIT WIDTH ADJUSTED; UKPN DOOR AND WALLS REVISED; HATCH INTO DOCK MANAGER'S OFFICE REVISED, ACCESS LADDER TO PLANT ROOM OMITED, RETAIL LOBBY OMITED. FIRE CURTAIN ADDED

6000

RECEPTION DESK AHU ROOM

26/06/14

BOX VAN

1 :20 RAMP

FOR EXTERNAL WORKS LAYOUTS REFER TO DRAWING A-800

20/02/15

11 SKIP BAY ADJUSTED

SKIP BAY

LINE OF RESTRICTED HEAD HEIGHT

PLN LEVEL 42 FFL= +186.150 m AOD

12 REVISED LEVELS, FALLS AND UKPN ROOM CONCRETE WALLS AND SHAFTS

2

LIGHTWELL

14

PLN LEVEL 43 FFL= +190.075 m AOD

13 DOOR REVISED TO METAL DOOR, SUPPLY AIR 02/04/15 PLANT ROOM FFL REVISED, CONCRETE WALLS TO SECURITY ROOM AND DOCK MANAGER OFFICE REVISED

EDGE OF CONCRETE UPSTAND

WASTE PRESENTATION AREA

PLN LEVEL 44 FFL= +194.000 m AOD

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C

W.C W.C W.C

LEVEL 16 FFL= +84.100 m AOD LEVEL 15 FFL= +80.175 m AOD LEVEL 14 FFL= +76.250 m AOD LEVEL 13 FFL= +72.325 m AOD LEVEL 12 FFL= +68.400 m AOD LEVEL 11 FFL= +64.475 m AOD LEVEL 10 FFL= +60.550 m AOD LEVEL 09 FFL= +56.625 m AOD LEVEL 08 FFL= +52.700 m AOD LEVEL 07 FFL= +48.775 m AOD GREEN ROOF PLANT

W.C W.C

PLANT W.C

W.C

W.C

W.C

W.C

PLANT

ANNEX PARAPET FFL= +46.710 m AOD LEVEL 06 FFL= +44.850 m AOD LEVEL 05 FFL= +40.925 m AOD LEVEL 04 FFL= +37.000 m AOD LEVEL 03 FFL= +33.075 m AOD LEVEL 02 FFL= +29.150 m AOD

PLANT

FIRE CONTROL CYCLE ENTRANCE

UKPN

LEVEL 01 FFL= +25.225 m AOD MEZZANINE FFL= +21.300 m AOD GROUND FFL= +16.400 m AOD

LIFT PIT

LIFT LIFT PIT PIT

LIFT PIT

PLANT

2

LONG SECTION 2 SCALE: 1 : 300

PLANT BASEMENT 1 FFL= +11.000 m AOD

WASTE STORAGE BASEMENT LEVEL THREE

HIGH RISE

FFL= +16.637

SMOKE EXTRACT RISER

MID RISE

FFL= +16.630 1:45 FALL

BASEMENT 2 FFL= +6.000 m AOD BASEMENT 3 FFL= +1.900 m AOD

LOW RISE

3010

26/06/15

HIGH RISE LIFT SHAFT

14

1700

1

1000

1290

PLN LEVEL 45 FFL= +197.925 m AOD

Landscape Consultants

FFL= +16.690

FIRE CURTAIN

1215

FOR DETAILED LAYOUTS REFER TO DRAWING A500

PLANT REPLACEMENT HATCH

3094

ENTRANCE LOBBY

2915

FRAMED OUT FOR TENANT FIT OUT

14 ANTI-SURF BARRIER REMOVED, 1 StESCALATOR John's Square London DSC AMENDED TO ONLY SHOW AT 1:50, EC1M 4DH BENCH ELIMINATED, BENCH AND 020JOINT 7253FOR 2929 COLUMN COVER REVISED TO MATCH ORIGINAL DESIGN, FINISH FLOOR LEVELS REVISIONS: AMENDED, LEVEL THRESHOLD REMOVED, EASTERN STAIR AMENDED, LOADING BAY WORKING ZONE CLARIFIED, RESTAURANT FRAMED SLAB OPENING SHOWN IN DASH, GULLEY ADDED, GHOST LINES REMOVED, DIRECTION OF OPENING FOR DOOR OF SUPPLY AIR PLANT ROOM CHANGED

MID RISE LIFT SHAFT

FFL= +16.690

LOW RISE LIFT SHAFT

UKPN 11 kV ROOM 1

FFL= +16.630 NOTIONAL

13 Fitzroy Street London W1T 4BQ TEL: +44 (0)207.636.1531

VARIES

RETAIL (SHELL)

FFL= +16.630 NOTIONAL

CANOPY ABOVE

1 A-154

RESTAURANT ENTRANCE (SHELL)

FFL= +16.400

8

UKPN LOBBY 1 FFL= +16.660

14

14

Structural, Mechanical, Facade, Electrical, Public Health and Fire Engineers. Vertical Transportation Consultants

0

+/- 16.530

+/- 16.603

+/- 16.621

6000

+/- 16.558

14

main lobby design coordination

London, EC3


boundary issue update | boundary wall CLAshes 38 leadenhall street - worst case

boundary issue analysis & strategy

boundary issue update | summary

clashes by 195mm

clashes by 225mm

entire width and height

entire width and height

wall type 2 l07

clash by 50-60 mm

as per current design

roof

l06

entire width and height

wall type-12 (contract)

clashes by 450 mm

precast panel as per current design

clash by

l04

l03

wall type 10

40 mm

entire width and height

l03

block-work (new)

clashes by 125 mm clashes by 340mm

entire width and height

infill between structural frame members

entire width and height

clashes by 165 mm

l02

l01 block-work (new)

local bulge

clashes by 345mm

along interior edge

entire width and height

clashes by 300 mm

fire rated composite panels, reduced thickness

l02

l01

clashes by 480mm

for the east elevation of the “shoulder”

l05

l04

along vertical beam

ended approach

with shaftwall construction behind

loading bay entrance

infill to loading bay

gf + MZ

gf + MZ

clashes by 320mm

entire width and partiallly height

entire width and height

current scheme contract

clash: boundary wall protruding into 100 mm clearance zone

B

C

D

E

F

G

H

1 A-210

J

K

L

M

N

P

R

S

52 LIME STREET, London EC3 | client design review 35 2nd JUly 2015 3

clash

recommended Approach ‘minimise cladding zone’

not r ‘fa

52 LIME STREET, London cladding build- UpEC3 | client design review 35 minimised 2nd JUly 2015 18

A

0

1

2

8

3

9

4

10

5

2 A-210

11

6

12 7

13

Concept: Minimizing cladding zone • no impact on position of columns • no impact on setting out of slab edge • area impact is minimised: 68 sq ft / 6.4 sqm • massing of the “shoulder” remains • thickness of exterior wall decreased in order to accommodate clashes

o accommodate clashes

52 LIME STRE


Interface cladding details

boundary issue update | section details: build-up and interfaces_SHOULDER

boundary issue update | plan & section

boundary issue update | plan & sectiondetails: build-up and interfaces_Billiter street annex

boundary issue update | plan & sectiondetails: build-up and interfaces_Billiter street annex boundary issue update | plan details: build-up and interfaces_SHOULDER/ BILLITER ANNEX 52 LIME STREET, London EC3 | client design review 35 2nd JUly 2015 16

52 LIME STREET, London EC3 | client design review 35 2nd JUly 2015 17


52 Lime Stre

52 Lime Street

London, EC3

B

C

D

6000

E

6000

F

6000

G

6000

H

6000

J

6000

L

K

6000

M

6000

P

N

6000

R

6000

S

6000

B

6000

C

D

6000

1 A-210

E

6000

F

6000

G

6000

1 A-210

H

6000

6000

J

L

K

6000

M

6000

P

N

6000

R

6000

S

6000

6000

WRBC DEVELOPM

WRBC DEVELOPMENT UK LIMITED 40 Lime Street London, EC3M 7AY, UK

A

40 Lime Street London, EC3M 7AY, UK

A

CONSULTANTS:

Kohn Pedersen Fox Associates (International) PA 7a Langley Street London, WC2H 9JG, UK TEL: +44 (0)20.3119.5300

1

A-149

A-150

CONSULTANTS:

A-151

KPF

Architect 1

1

c

insulation concept

London, EC3

Architect

Kohn Pedersen Fox Asso (International) PA 7a Langley Street London, WC2H 9JG, UK TEL: +44 (0)20.3119.53

0

Structural, Mechanic Facade, Electrical, P Health and Fire Engi Vertical Transportati Consultants

Structural, Mechanical, Facade, Electrical, Public Health and Fire Engineers. Vertical Transportation Consultants A1

A1 00 90

c

CCTV ROOM

FFL= +6.000

FFL= +6.000

FFL= +6.000

FFL= +6.000 PAVS 6

8

3

00 90

11 SALT ROOM RELOCATION/ BUND REVISED/ UPDATED

02/04/15 20/02/15

9 WASTE STORAGE LAYOUT REVISED; B3 STAIR LOCATION UPDATED PER CONSULTANT COORDINATION MEETING, BUILDING MANAGEMENT OFFICE LAYOUT AMMENDED, 8 PAVS ROOM AND DOOR ADDED

25/04/14

8 CYCLE LIFT OPENINGS REVISED PER LIFT DRAWINGS;PARTITION WALLS AND DOOR ADDED PER DTZ REQUEST, WET RISER LOCATION IN WESTERN STAIR LOBBY REVISED

21/03/14

7 TANK ROOM PLANT ROOM WALL AMENDED, SOUTH STAIR FROM B2 REDESIGNED, MANEGEMENT WASHROOMS / TOILETS LAYOUT REVISED

28/02/14

6 REVISED TRANSFORMER, PUMP, LANDLORDS HV/LV SWITCHROOMS ; CCTV ROOM ADDED; WESTERN STAIR LOBBY LAYOUT REVISED

27/01/14

BALER GOODS LIFT LOBBY P

FFL= +6.000

CORRIDOR 1

CORRIDOR 2

FFL= +6.000

P

FFL= +6.000

BUILDING MANAGEMENT ROOM NO.6

STORAGE ROOM NO.2

BUILDING MANAGEMENT ROOM NO.2

CORRIDOR 4 FFL= +6.000

10

CYCLE LIFT C-2

B

P P

2 A-152

5

2 A-210

3 REVISED COLUMN LAYOUT, CORE WALLS UPDATED, LOW RISE LIFT SHIFTED SOUTHWARDS, DEEPER GOODS LIFTS

26/07/13

2 MANAGEMENT ROOMS LAYOUT, ONE CYCLE LIFT EXTENDED TO B2,

28/03/13

1 TRANSFORMER ROOMS ARRANGEMENT ADJUSTED, STAIR LAYOUTS ADDED, CAFE SERVICE ROUTE REPLANNED

25/02/13

Description

STORAGE ROOM NO.2

6000 6000

FFL= +11.000

R-08

R-05

LIFT PIT C

LIFT PIT E

LIFT PIT I

LIFT PIT D

LIFT PIT F

LIFT PIT J

R-12 LIFT PIT B

10

ALL BASEMENTS TO ACHIEVE GRADE 3 WATERPROOFING PROTECTION TO BS 8102

R-04

7 REVISED SHOWER LAYOU

6 WESTERN STAIR LOBBY R REMOVED @ R-12/R-13. REVISED

5 CAFE STAIR AND SECURIT FILL POINT ADDED

4 RELOCATED COMMS AND ROOMS

UKPN 33 kV ROOM 2

3 REVISED SHOWER, UKPN SERVICE ACCESS LAYOUT SHIFTED SOUTHWARDS, LIFTS

1 A-152

ANNEX RISER

GOODS LIFT GL-2

5

2 REVISED CYCLE STORAGE SHOWERS LAYOUT. REVI STAIRS

12 WET LEATHER ROOM

PLANT REPLACEMENT SOFT SPOT

CYCLE LIFT C-2

1 REVISED UKPN ROOMS L SERVICE ROUTE REPLANN No.

BASEMENT SUPPLY AHU FFL= +11.000

FFL= +11.000

R-18

E

7

R-16

R-14

FOR DRAWING LEG

ALL BASEMENTS GRADE 3 WATERP PROTECTION TO

R-19

FIRE FIGHTING LIFT / STAIR LOBBY

FIRE FIGHTING LIFT F-1

LIFT PIT H

FFL= +11.000

STORAGE ROOM NO.1

7

R-15

11

00 90

SPRINKLER CONTROL VALVE ROOM

KEY PLAN:

Description

NOTES:

2 A-210

6 CYCLE LIFT C-1

LIFT PIT K

MECHANICAL PLANT ROOM

CAFE (SHELL)

00 90

FFL= +6.000

FFL= +11.000

R-13

R-03 LIFT PIT G

WESTERN STAIR LOBBY

EASTERN STAIR FIRE FIGHTING LIFT / STAIR LOBBY

BUILDING MANAGEMENT ROOM NO.4

8 SPRINKLER CONTROL VAL REVISED, GAS METER RO REVISED, WATER METER REVISED TOILET LAYOUT

RISER ABOVE

CAFE SERVICE STAIR

FFL= +6.000

MOTORCYCLE PARKING

BICYCLE LIFT LOBBY FFL= +11.000

GOODS LIFT GL-1

R-11

CORRIDOR 5

Date

FOR DRAWING LEGEND REFER:KPF A-002

R-15

9 BICYCLE STORAGE AND S REVISED, CYCLE LIFT OPE LIFT DRAWINGS, WET RIS WESTERN STAIR LOBBY R

GOODS LIFT LOBBY

R-09

R-10 LIFT PIT A

R-14 FIRE FIGHTING LIFT F-1

10 ACCESS TO SPRINKLER CO REVISED, DOOR DIRECTIO

4

COMMS INTAKE NO. 2

CORRIDOR 1 FFL= +11.000

00 90

BUILDING MANAGEMENT ROOM NO.5 FFL= +6.000

FFL= +6.000

11 REVISED LAYOUT CHANG LOCALS AND AIR HANDLI CYCLE STORAGE LAYOUT, 33kV ROOM 1 ACCESSES, METER AND GAS METER REMOVAL OF CORRIDOR AND RELATIVE CEILINGS, INSULATION STRATEGY A REVISED GOODS LIFT LOB BASEMENT 1 LEVEL

b

MALE WASHROOM

RECYCLING AND WASTE STORAGE

FFL= +6.000 BUILDING MANAGEMENT ROOM NO.3 FFL= +6.000

02/12/13 16/09/13

6 LOBBY

WESTERN STAIR

5 RISER DOORS ADDED, LOBBY ADDED TO WASTE STORE 4 PUMPS/TANKS RELOCATED, EASTERN 9 BOUNDARY RECONFIGURED, MANAGEMENT SUTE REVISED

No.

b

MALE WASHROOM

NOTES:

R-13

WESTERN STAIR LOBBY

BUILDING MANAGEMENT ROOM NO.1

11

P

P P

ACCESSIBLE WASHROOM FEMALE WASHROOM

6000

00 90

B

GOODS LIFT GL-2

R-12

FFL= +6.000

TOILET / SHOWER NO. 2

TOILET

GOODS LIFT GL-1

CORRIDOR 2

R-11

12 RISER NAME ADDED

FFL= +11.000

3

ACCESSIBLE WASHROOM

F

TOILET / SHOWER NO. 1

FEMALE SHOWER ROOM

TOWEL ROOM

CLEANERS CUPBOARD

00 90

ACCESSIBLE SHOWER / WASHROOM

P

P

R-10

FFL= +6.000

PIPE WORK TRANSFER ABOVE

P

P

STORAGE ROOM R-09 NO.1

6000

FFL= +6.000

STORAGE ROOM NO.3

PLANT REPLACEMENT SOFT SPOT ABOVE

00 90

TENANT CAFE / KITCHEN PH ROOM

P

6000

9

FFL= +11.000

F

4

MALE SHOWER ROOM

FEMALE SHOWER LOBBY

FEMALE WASHROOM

00 90

STAIR LAYOUT TO ENGINEERING DESIGN

PLANT REPLACEMENT HATCH ABOVE

FFL= +11.000

2

10 REVISED INSULATION STRATEGY AT B2, PAVS 3 AND RCU 1 LAYOUTS ADJUSTED TO MATCH MEP DRAWINGS

6000

a

FFL= +6.000

BICYCLE STORAGE RACKS

FFL= +11.000

MALE SHOWER LOBBY

MAIL ROOM

a

MECHANICAL PLANT FFL= +6.000

ACCESS GANTRY

RESTAURANT (SHELL)

920

CORRIDOR 5

TANK / PUMP ROOM

insulation FIXED TO SOFFIT ABOVE with 600 mm offset

TRANSFORMER NO.1

LANDLORDS SWITCHROOM NO. 2

insulation FIXED above FLOOR SLAB

2

12000

insulation below slab with 600 mm offset

RCU 9

RCU 10

RCU 1

6000

FFL= +6.000

FFL= +6.000

PAVS 3

CORRIDOR 7

LANDLORDS SWITCHROOM NO. 1 RCU 3

RISER ABOVE

6000

PAVS 5

PAVS 4

TRANSFORMER NO. 2

1 St John's Square Londo EC1M 4DH 020 7253 2929 REVISIONS:

REVISIONS:

COMMS ROOM NO.1 COMMS ROOM NO.1 FFL= +6.000

ACCESS GANTRY

Landscape Consultan

PAVS 1

PLANT REPLACEMENT HATCH ABOVE

CORRIDOR 3

CORRIDOR 3

FFL= +6.000

13 Fitzroy Street London W1T 4BQ TEL: +44 (0)207.636.15

1

1 St John's Square London EC1M 4DH 020 7253 2929

D

ACCESS LADDER CORRIDOR 6

COMMS INTAKE NO. 1 FFL= +11.000

FFL= +11.000

WATER METER ROOM

Landscape Consultants

1

FFL= +6.000

D

PAVS 1 PAVS 2

11

SALT TANK

FFL= +6.000

CORRIDOR 4

LANDLORDS HV SWITCH ROOM NO.2

FFL= +6.000

6000

RCU 8

RCU 7 STAIR LAYOUT TO ENGINEERING DESIGN

LANDLORDS HV SWITCH ROOM NO.1

FFL= +6.000

UKPN 33 kV ROOM 1

GAS METER ROOM FFL= +11.000

13 Fitzroy Street London W1T 4BQ TEL: +44 (0)207.636.1531 OIL TANK

6000

FFL= +6.000

FUTURE DISTRICT HEATING

COMMS ROOM NO.2

KEY PLAN:

FFL= +11.000

E

12

1 A-398

12

N

vertically fixed insulation

note: Waterproofing in B02 required to achieve a grade 3 level of protection in accordance with PLAN LEVEL BASEMENT 1 152 LEVEL B2 FLOOR PLAN Lime Street bs8102 London, EC3

U-Value = o.35 W/m²K

horizontally fixed insulation (slab) U-Value = o.25 W/m²K

horizontally fixed insulation (soffit)

PLAN BASEMENT 2 LEVEL

C 6000

D

E

6000

F

6000

G

6000

H

6000

6000

Scale

Project No.

1972

Drawn By

horizontally fixed insulation (slab)

13

MB

U-Value = o.25 W/m²K

A-099 16/04/2015 10:19:20

DRAWING NO.

L

K

6000

M

6000

P

N

6000

6000

R

Issue Date: Scale

Project No. Drawn By

horizontally fixed insulation (soffit)

SCALE: 1 : 100

10m

note: Waterproofing in B01 required to achieve a grade 3 level of protection in accordance52with Lime StreetB1 F LEVEL London, EC3 bs8102

Kohn Pedersen Fox Assoc

U-Value = o.35 W/m²K

1 : 100 @ A0

U-Value = o.25 W/m²K

4m

2m

0m

6m

8m

DRAWING NO.

11

52 LIME STREET, London EC3 A-099 28TH april 2015

BASEMENT INSULATION | BASEMENT 01 | SK-732 REV b

© 2013 KOHN PED

S

6000

6000

WRBC DEVELOPMENT UK LIMITED

1 A-210

B

40 Lime Street London, EC3M 7AY, UK

C 6000

D 6000

E

F

6000

G

6000

WRBC DEVELOPMENT UK

1 A-210

H

6000

6000

J

L

K

6000

6000

M

P

N

6000

R

6000

6000

40 Lime Street London, EC3M 7AY, UK

S 6000

CONSULTANTS:

CONSULTANTS:

KPF

Architect

c

A

Kohn Pedersen Fox Associates (International) PA 7a Langley Street London, WC2H 9JG, UK TEL: +44 (0)20.3119.5300

Architect Kohn Pedersen Fox Associates (International) PA 7a Langley Street London, WC2H 9JG, UK TEL: +44 (0)20.3119.5300

A 1 A-502

Structural, Mechanical, Facade, Electrical, Public Health and Fire Engineers. Vertical Transportation Consultants

CANOPY ABOVE

UKPN LOBBY 1 FFL= +16.660

1 A-154

RETAIL (SHELL)

UKPN 11 kV ROOM 1

FFL= +16.630 NOTIONAL

FFL= +16.630 NOTIONAL

FFL= +16.690

Landscape Consultants 1 St John's Square London EC1M 4DH 020 7253 2929

1

LARGE CAR

+/- 16.400

BOX VAN

BOX VAN

SKIP BAY

BOH TOILET LOBBY

BOH TOILET

1:80 FALL

G

FFL= +16.400

00 90

RECEPTION ACCESSIBLE VISITORS TOILET

LOADING BAY

EDGE OF CONCRETE UPSTAND

1:60 FALL

F

FFL= +16.252

1:60 FALL

FFL= +16.090

LIFT LR-1 +/- 16.430

11

LOW RISE LIFT LOBBY

LIFT LR-2

E

13

LIFT HR-1

LIFT HR-2

R-11

R-12

13 GOODS LIFT GL-2

FFL = +16.180

SUPPLY AIR PLANT ROOM

LIFT HR-3

FFL= +16.200

13

12

FIRE FIGHTING LIFT F-1

UKPN 11kV ROOM 2

FFL= +16.070

FFL= +16.100

FFL= +16.200

13

ANNEX STAIR

CANOPY ABOVE R-19

FIRE FIGHTING LIFT / STAIR LOBBY FFL= +16.400

13

26/07/13

28/03/13

1 REVISED UKPN ROOM LAYOUT, REPLANNED RECEPTION BOH, BILLITER STREET LAYOUT MODIFY, CAFE SERVICE ROUTE REPLANNED

25/02/13

10

H

insulation below slab (structurally rated tbc arup - to extend 1m beyond insulated wall)

RETAIL KIOSK (SHELL) FFL= +16.050

600 mm

R-07 R-05

R-23

R-08

R-06 OFFICE STORAGE

9 LIFT A LR-1

Date

FOR DRAWING LEGEND REFER:KPF A-002

7 DOOR TAGS, FIRE RATED WALL TO RETUR AIR PLANT ROOM AND ANNEX ANNOTAT ADDED

4

6 PLENUM ADDED AND AIR RETURN PLAN ROOM REVISED TO SUIT MEP REQUIRME

5 REVISED LAYOUT OF RETURN PLANT ROO BILLITER ANNEX; RISER 20 RELOCATED; 24 & 25 ADDED

LIFT C LR-3

LIFT SHAFT E

LOW RISE LIFT LOBBY

11

LIFT B LR-2

LIFT D LR-4

WESTERN STAIR LOBBY 9 R-25

WESTERN STAIR

600 mm

LIFT SHAFT G

GOODS LIFT GL-1

R-24 R-12 LIFT SHAFT J

GOODS LIFT GL-2

FIRE FIGHTING LIFT F-1

6 CANOPY

MALE WASHROOM

R-15

Description

FOR DRAWING LEGEND REFE

2 A-210

R-18

FIRE FIGHTING LIFT / STAIR LOBBY

1 GENERAL AMENDMENT

NOTES:

ANNEX RISER

SMOKE EXTRACT FAN ROOM

R-14 LIFT SHAFT H

2 LOW RISE LIFT SHIFTED SOUTHWARDS, DEEPER GOODS LIFTS, REARRANGED MA WC

insulation FIXED TO partition wall and slab above LAYOUT REPEATS UP TO LEVEL 06 No.

R-16 R-13 LIFT SHAFT K

3 REVISED WESTERN STAIR AND LOBBY

A-155

KITCHEN & RESTAURANT EXHAUST AHU'S

5

R-11

4 BILLITER ANNEX REVISED, ACCESSIBLE W STORAGE AND MALE WC REVISED. PART REMOVED @ R-12/R-13

1 ANNEX LEVEL 1

EXTRACT AIR PLANT ROOM FFL= +25.125

FFL= +25.125

9 12

LIFT SHAFT I

LIFT SHAFT F

R-20R-04 R-03

SUPPLY AIR PLANT ROOM

H

COOLING UNITS

R-09 R-10

7

R-19

9 EASTERN STAIR

9

R-22

KEY PLAN:

7

00 90

D

00 90

KEY PLAN:

+16.180 +/- 16.400

MER ROOM

UKPN 11kV ROOM 2 LOBBY FFL=+16.050

R-16

R-15

+/- 16.680

16/09/13

3 REVISED UKPN AND CAFE SERVICE ACCESS LAYOUT, LOW RISE LIFT SHIFTED SOUTHWARDS, DEEPER GOODS LIFTS

Description

OFFICE FFL= +25.225 M AOD

2 REVISED RECEPTION AREA, REVISED UKPN ROOM STAIRS, REVISED SECURITY ROOM LOCATION

No.

8 FIRE EXTINGUISER CABINETS OMITTED, STAIR REVISED, RISER 20 RELOCATED, FI FIGHTING LOBBY CONCRETE WALL REMO SUPPLY AND EXTRACT AIR PLANT ROOM REVISED, GENERAL NOTES ADDED, WALL TYPES REVISED, INTUMESCENT PAINT TO FREESTANDING COLUMNS OMITTED

G

NOTES:

LIGHTING BOX

6

+16.180

28/10/13

insulation FIXED TO SOFFIT ABOVE

2 A-210

+16.030

R-18

02/12/13

5 REVISED REVOLVING DOORS AND CAFE ENTRANCE DOORS, REVISED CYCLE LIFT SHAFTS, REVISED CAFE SERVICE STAIR, 4 REVISED STAIRS, KIOSK ENTRY, BOH RECEPTION AND ACOMMODATION STAIR

EMERGENCY FILL POINTS

SECURITY ROOM

FFL= +16.050

CYCLE LIFT C-2

R-13

R-14 LIFT MR-4

DOCK MANAGERS OFFICE

STORAGE BICYCLE LOBBY

CYCLE LIFT C-1

R-03

LIFT MR-3

ANNEX RISER

FIRE CURTAIN

6 CAFE STAIR AND SECURITY AMENDED, OIL FILL POINT ADDED

section H-H

+16.030

5 GOODS LIFT GL-1

27/01/14

G

00 90

FFL= +16.200 +/- 16.530

R-04

WESTERN STAIR LOBBY FFL= +16.400

HIGH / MID RISE LIFT LOBBY

LIFT MR-2

LIFT LR-4

00 90 FFL= +16.550

LIFT MR-1

LIFT LR-3

H

VEHICLE BLOCKER CHANNEL DRAIN

OIL FILL POINT

FFL = +16.180

D

F

R-10

MEZZANINE SLAB EDGE ABOVE

FIRE CURTAIN

FFL= +16.199

R-09

EAST CORRIDOR

R-08

1 :20 RAMP

R-07

7 REVISED WESTERN STAIR EXIT AND SECURITY ROOM; REVISED ENTRY TO TURNSTILE CONTROL ROOM, BOH TOILET AND RISER 5; RELOCATED RISER 20

9 PLANT ROOM WALLS REVISED, DOORS T STAIRCASES REVISED TO BE METAL DOO PLANTROOM FFL UPDATED, FIRE EXTINGUISHER CABINET WALLS REMOV

3 EXISTING FLUE DEMOLISHED AND CAPPED AT ROOF LEVEL

9

00 90

00 90

R-05

BI-FOLD DOOR 6000

CHANNEL DRAIN

FFL= +16.276 RISER ACCESS

28/02/14

LIGHTWELL

W LO BE

H

SECURITY ACCESS CONTROL ROOM

8 STORAGE CHANGED TO SECURITY ACCESS ROOM, UKPN LEVELS REVISED,CYCLE ENTRY MATWELL ADDED, KIOSK DOOR REMOVED, BOH TOILET AND BLAST WALL ARRANGEMENT REVISED, COLUMN LOCATIONS UPDATED, DOORS UPDATED, LIGHTING BOX ADDED

2 VOID

PY NO CA

FFL=+16.450

+16.030 FFL= +16.030

21/03/14

F O

+/- 16.430

4

FFL= +16.030

25/04/14

9 CYLE LIFT OPENINGS REVISED PER LIFT CONTRACTOR DRAWINGS; DOOR AND SECURITY WINDOW LOCATION ADJUSTED PER DTZ REQUEST, REVISED RETAIL AND RESTAURANT ENTRY LEVELS, ENTRANCE MATTING ADDED

E IN UTL O

10

CHANNEL DRAIN

1:80 FALL

FFL= +16.400 M AOD

NOTIONAL

FFL = +16.180

RISING ARM BARRIERS

FFL= +16.159 CAFE (SHELL)

PLANT REPLACEMENT HATCH

10 WESTERN STAIR LOBBY,UKPN ROOM AND LOBBY FFL HTS ADJUSTED; FIRE FIGHTING FINAL EXIT WIDTH ADJUSTED; UKPN DOOR AND WALLS REVISED; HATCH INTO DOCK MANAGER'S OFFICE REVISED, ACCESS LADDER TO PLANT ROOM OMITED, RETAIL LOBBY OMITED. FIRE CURTAIN ADDED

8

00 90

FEATURE STAIR

FUTURE ACCESSIBLE WC LOCATION BY TENANT

CORRIDOR

FFL= +16.400

6000

3 FFL= +16.400

G

RECEPTION COAT ROOM

+/- 16.400

6000

RECEPTION DESK AHU ROOM

9

26/06/14

insulation FIXED TO SOFFIT ABOVE

BOX VAN

6000

FOR EXTERNAL WORKS LAYOUTS REFER TO DRAWING A-800

20/02/15

11 SKIP BAY ADJUSTED

00 90

00 90

LIGHTWELL LINE OF RESTRICTED HEAD HEIGHT

12 REVISED LEVELS, FALLS AND UKPN ROOM CONCRETE WALLS AND SHAFTS

38 LEADENHALL

GLAZED ENCLOSURE AROUND VOID

13 DOOR REVISED TO METAL DOOR, SUPPLY AIR 02/04/15 PLANT ROOM FFL REVISED, CONCRETE WALLS TO SECURITY ROOM AND DOCK MANAGER OFFICE REVISED

2

EDGE OF CONCRETE UPSTAND

WASTE PRESENTATION AREA

6000

8

6000

OUTLINE OF 38 LEADENHALL

FFL= +16.589 1:45 FALL

12000

SMOKE EXTRACT RISER

6000

FFL= +16.630 1:45 FALL

6000

REVISIONS:

6000

PLANT REPLACEMENT HATCH

FFL= +16.637

1 St John's Square London EC1M 4DH 020 7253 2929 REVISIONS:

1

CLEANERS CUPBOARD

FOR DETAILED LAYOUTS REFER TO DRAWING A500

FFL= +16.690

FIRE CURTAIN

EAST CORRIDOR

ENTRANCE LOBBY

13 Fitzroy Street London W1T 4BQ TEL: +44 (0)207.636.1531

WC CORRIDOR

FRAMED OUT FOR TENANT FIT OUT

0

ESCALATOR LANDING LOBBY

Landscape Consultants

ACCESSIBLE WASHROOM

CANOPY ABOVE

BELOW

FEMALE WASHROOM

FFL= +16.400

OUTLINE OF CANOPY

13 Fitzroy Street London W1T 4BQ TEL: +44 (0)207.636.1531

6000

c

RESTAURANT ENTRANCE (SHELL)

Structural, Mechanical, Facade, Electrical, Public Health and Fire Engineers. Vertical Transportation Consultants

0

+/- 16.530

+/- 16.603

+/- 16.621

VARIES

+/- 16.558

10m

REVISION

© 2013 KOHN PEDERSEN FOX ASSOCIATES PC. All rights reserved.

J

vertically fixed insulation

11/01/13

52 LIME STREET, London EC3 A-098 28TH april 2015

BASEMENT INSULATION | BASEMENT 02 | SK-731 REV B B

8m

6m

4m

2m

0m

U-Value = o.25 W/m²K

SCALE: 1 : 100

A-098 16/04/2015 10:15:22

1

Issue Date:

KPF

1 A-399

Kohn Pedersen Fox Associates (International) PA

LEVEL B1 FLOOR PLAN C:\KPF\Revit\1972_ARCH_KPF_MAIN_dli.rvt

13

KPF

00 90

LEVEL B2 FLOOR PLAN C:\KPF\Revit\1972_ARCH_KPF_MAIN_dli.rvt

00 90

insulation ON TOP of slab with 600 mm offset

POSITION OF WOODFORD STONES REFER TO A-301 +/- 16.680

E

1 A-402

1 A-400

LEVEL 01 FLOOR PLAN C:\KPF\Revit\1972_ARCH_KPF_MAIN_panand.rvt

N

vertically fixed insulation horizontally fixed insulation (slab) 1

PLAN GROUND LEVEL SCALE: 1 : 100

horizontally fixed insulation (soffit) 0m

2m

4m

6m

8m

10m

1 4/2015 12:37:15

:58

GROUND LEVEL FLOOR PLAN C:\KPF\Revit\1972_ARCH_KPF_MAIN_dli.rvt

13

KPF Scale

KPF

Kohn Pedersen Fox Associates (Interna

Kohn Pedersen Fox Associates (International) PA

Issue Date:

13

14/01/13 1 : 100 @ A0

Project No.

1972

Drawn By

MB

1

vertically fixed insulation

Scale Project No. Drawn By

horizontally fixed insulation (slab) 0m

PLAN LEVEL 01

GROUND LEVEL FLOOR SCALE: 1 : 100 PLAN

Issue Date:

horizontally fixed insulation (soffit)

2m

4m

6m

8m

10m

LEVEL 01 FLOOR

DRAWING NO.

A-101


52 Lime Street L

HORIZONTALLY FIXED INS-03 INSULATION TO SLAB 4

+15.380m

GROUND FFL= +16.400 m AOD ANNEX ENTRANCE LOADING BAY ENTRY FFL= +16.030 +16.100 m m AOD AOD FFL=

m

ANNEX ENTRANCE LOADING BAY ENTRY FFL= +16.030 +16.100 m m AOD AOD FFL=

HORIZONTALLY FIXED INSULATION TO SLAB INS-03

FFL= +16.680

SK-1188

insulation details

London, EC3

M

FFL= +16.480 GROUND FFL= +16.400 m AOD ANNEX ENTRANCE LOADING BAY ENTRY FFL= +16.030 +16.100 m m AOD AOD FFL=

6 SK-1188

600

3 SK-1188

HORIZONTALLY FIXED INSULATION TO SOFFIT INS-01

BICYCLE STORAGE

VERTICALLY FIXED INSULATION

SHOWERS

SPRINKLER CONTROL VALVE ROOM

VERTICALLY FIXED INSULATION LIN-04

+12.650m

LIFT PIT

WRBC DEVELOPMENT U

INS-03

40 Lime Street London, EC3M 7AY, UK

RESTAURANT

INS-03

CONSULTANTS:

Architect

2.200m

Kohn Pedersen Fox Associates (International) PA 7a Langley Street London, WC2H 9JG, UK TEL: +44 (0)20.3119.5300

2

HORIZONTALLY FIXED INSULATION TO SOFFIT

BASEMENT 1 FFL= +11.000 m AOD UNDERSIDE OF B1 SLAB FFL= +10.600 m AOD

BASEMENT 1 FFL= +11.000 m AOD UNDERSIDE OF B1 SLAB FFL= +10.600 m AOD

600

SK-1188

BASEMENT 1 FFL= +11.000 m AOD UNDERSIDE OF B1 SLAB FFL= +10.600 m AOD

Structural, Mechanical, Facade, Electrical, Public Health and Fire Engineers. Vertical Transportation Consultants

600

INS-01

CCTV ROOM

VERTICALLY FIXED INSULATION

8.950m

CORRIDOR 3

BUILDING MANAGEMENT ROOM No.4

VERTICALLY FIXED INSULATION LIN-04

Landscape Consultants

ACCESS GANTRY

BUILDING MANAGEMENT ROOM No.2

1 St John's Square London EC1M 4DH 020 7253 2929

INS-03 HORIZONTALLY FIXED INSULATION TO SLAB

1 SK-1188

BASEMENT 2 FFL= +6.000 m AOD

13 Fitzroy Street London W1T 4BQ TEL: +44 (0)207.636.1531

LIN-04

BASEMENT 2 FFL= +6.000 m AOD

REVISIONS:

BASEMENT 2 FFL= +6.000 m AOD

5 SK-1188

HORIZONTALLY FIXED INSULATION INS-03

600

PUMP ROOM

BASEMENT 3 FFL= +1.900 m AOD

1

Section A-A

2

SCALE: 1 : 50

Section B-B

3

SCALE: 1 : 50

Section C-C SCALE: 1 : 50

WIP_22.05 HORIZONTALLY FIXED INSULATION TO THE SLAB BICYCLE LOBBY

HORIZONTALLY FIXED INSULATION TO THE SLAB

FFL= +16.530

INS-03

STORAGE ROOM

CAFE (SHELL)

INS-03 GROUND FFL= +16.400 m AOD ANNEX ENTRANCE LOADING BAY ENTRY FFL= FFL= +16.100 +16.030 m m AOD AOD

GROUND FFL= +16.400 m AOD ANNEX ENTRANCE LOADING BAY ENTRY FFL= FFL= +16.100 +16.030 m m AOD AOD

GROUND FFL= +16.400 m AOD ANNEX ENTRANCE LOADING BAY ENTRY FFL= FFL= +16.100 +16.030 m m AOD AOD

+16.200m

VERTICALLY FIXED INSULATION LIN-04 No.

BICYCLE LIFT LOBBY

Description

NOTES:

STORAGE ROOM

FOR DRAWING LEGEND REFER

CAFE VERTICALLY FIXED INSULATION

VERTICALLY FIXED INSULATION

+12.200m

LIN-04

RESTAURANT

BASEMENT 1 FFL= +11.000 m AOD UNDERSIDE OF B1 SLAB FFL= +10.600 m AOD

SSL +10.900 m Basement 01

BASEMENT 1 FFL= +11.000 m AOD UNDERSIDE OF B1 SLAB FFL= +10.600 m AOD

+8.950m

BASEMENT 1 FFL= +11.000 m AOD UNDERSIDE OF B1 SLAB FFL= +10.600 m AOD

VERTICALLY FIXED INSULATION

BUILDING MANAGEMENT ROOM NO.6

LIN-04

VERTICALLY FIXED INSULATION LIN-04

HORIZONTALLY FIXED INSULATION TO THE SLAB

SK-1185 22/05/2015 18:23:37

SECTIONS INSULATION STRATEGY C:\KPF\Revit\1972_ARCH_KPF_MAIN_panand.rvt

BASEMENT 2 FFL= +6.000 m AOD

BASEMENT 2 FFL= +6.000 m AOD

SSL +5.900 m

CORRIDOR 1 KEY PLAN:

BUILDING MANAGEMENT

RECYCLING & WASTE STORAGE

600

INS-03

HORIZONTALLY FIXED INSULATION TO SLAB

600

BASEMENT 2 FFL= +6.000 m AOD

Basement 02

KPF

Kohn Pedersen Fox Associates (Inte

Issue Date: Scale VERTICALLY FIXED INSULATION U-VALUE= 0.35 W/m² K VERTICALLY FIXED INSULATION U-VALUE= 0.35 W/m² K

4

Section D-D SCALE: 1 : 50

5

Section E-E SCALE: 1 : 50

6

Section F-F SCALE: 1 : 50

(PLAN) (SECTION)

Drawn By

HORIZONTALLY FIXED INSULATION (SLAB / SOFFIT) U-VALUE= 0.25 W/m² K

SECTIONS INSU STRATEGY

HORIZONTALLY FIXED INSULATION (SLAB / SOFFIT) U-VALUE= 0.25 W/m² K

DRAWING NO.

INSULATION PERFORMANCE SCALE: 1 : 50

Project No.

SK-1185

© 2013 KOHN PEDERSEN FOX A


2014 MGM Cotai // Macau Detail design & coordination / Design studies Tasks: Canopy design / details & coordination East façade details and coordination Main entrance to towers design /details & coordination Tower cladding details / Tower signage study Theatre cladding design options study Plant room enclosure Casino / restaurant area (“Spectacle”) sections, “Spectacle” toilet layout

KPF, London



Tower entrance


tower entrance


entrance canopy design and details


tower signage study BMU track level and support framing to be revised by NSC

5.5m

21m finished ceiling

shadow box glass vision glass

16.6m 42.6m


“spectacle section”


“spectacle section”


Offices

Residential

Offices

Ground Floor

Plaza

Residential

Residential Block

+ 4.5

+ 7.5 Podium

Roof Plan


2013 MIST Housing Masdar City// Masdar [UAE] Feasibility Study Tasks: Concept 2D drawing of scheme based on modular grid 3D modelling of scheme Design development of different typologies Visualization: Rendering and Photoshop work Report document

RMJM International, London


2013 King Khalid International Airport// Riyadh [UAE] Concept Design Tasks: Schematic design in plan & section

RMJM International, London


2013 Al Reem Island// Abu Dhabi [UAE] Masterplan Concept Study Tasks: Concept 2D drawing of scheme Visualization: Photoshop

RMJM International, London


Ground level

Elevation south


First Level

West Twyford Primary School// Ealing Diagrammatic design Concept Design Planning application

ASTUDIO, London Long section

2013


2013 Birmingham New Street Station// Birmingham [UK] New Construction / Refurbishment Tasks: Coordination/ Updating of GAs Design & technical coordination of spaces related to Pallasades Mall Structural coordination of substructure cladding Coordination of risers

Haskoll Architects & Designers, London


Grundriss

Retail Level


2008-2011 Deutsche Bank “Green towers” // Frankfurt M. [Germany], Refurbishment Design & coordination of ground level zone: Main customer and employee branch of “Deutsche Bank” ”Art Café”: Café, restaurant and art exhibition area “Main Conference Area”: Foyer and art exhibition area Convenience store, security control, library and ID office Design & coordination of the Mezzanine floor Coordination Open space design

gmp Architekten, Frankfurt am Main MARKUS BREDT


LIBRARY

M

AI N

C O N FE R EN C E

Grundriss mit Zonen übersicht

AR EA

ART CAFE

FOYER

ES

AC

SP R

SE C

VI E ST F

AF K

N

BA BR C

AN H


reflected ceiling plan bank branch Reflected ceiling plan, Bank Branch


floor plan bank branch Floor plan, Bank Branch


atm zone bank branch Detail plan, ATM Area Bank Branch



atm zone bank branch Detail Elevation/ Section, ATM Area Bank Branch


atm zone bank branch Detail Elevation/ Section, ATM Area Bank Branch


consulation cabins bank branch Detail Plan/ Elevation/ Section, Consultation Cabins Bank Branch



waiting lounge bank branch Detail Plan/Elevation/ Section, Lounge Bank Branch




steel feature staircase Main conference area Details Steel Staircase, Main Conference Area


Plan Swimming Pool


2007-2008 Indoor Swimming Pool// Aschaffenburg, Germany Refurbishment Tile pattern swimming pool area Tile pattern changing/ locker area Detail planning showers and toilets

pbr-PlanungsbĂźro Rohling AG GmbH



2007-2008 Canteen _ University of Bremen// Bremen, Germany Refurbishment Design of the students’ lounge Detail design sliding glass partition wall

pbr-PlanungsbĂźro Rohling AG GmbH


EKZ Riedberg// Frankfurt M., Germany

2007

Complex of buildings in Frankfurt’s new district Riedberg consisting of a retail mall, a residential house and a free standing building with commercial occupancy. Detailing of doors Door schedule Detailing of bathrooms and toilets

Schneider + Schumacher Architekten





2006 Cologne Science Center// Heidenheim, Germany Competition Digital and physical concept studies Production of presentation drawings Layout of panels

Albert Speer & Partner GmbH


Schnitt BB 1:200


2006 University Heidenheim// Heidenheim, Germany Competition

Digital and physical concept studies Production of presentation drawings Layout of panels

Albert Speer & Partner GmbH



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.