Planning Package for P87/09

Page 95

DESCRIPTION

% WT

Install Mech Valves

0.12

Hydrotesting of Pipelines

0.03

Painting of A/G Piping & Supports

0.01

Tentative S/D to be discussed with KOC

0.18

Installation of Corrosion Monitoring Fittings

PIPE WAY Installation of all AG Steel Pipes

0.36 0.01

Installation of UG RTRP Pipes

0.28

Install Mech Valves

0.07

Hydrotesting of Pipelines

0.40

Painting of A/G Piping & Supports

0.60

Tentative S/D to be discussed with KOC

0.17

Installation of all AG Steel Pipes

58,710.000

1.90

Installation of all UG Steel Pipes

Installation of Corrosion Monitoring Fittings

0.01

1.18

18,231.000

0.05

Installation of all AG RTRP Pipes

0.04

Installation of Corrosion Monitoring Fittings

0.01

Install Control Valves

0.70

Installation of Flow Elements

0.05

Install Mech Valves

0.10

Hydrotesting of Pipelines

0.03

Painting of A/G Piping & Supports

0.02

Tentative S/D to be discussed with KOC

0.18

Finish Construction

0.00

INSTRUMENTATION

6.00

92,700.000

0.40

6,180.000

DESALTER A&B AREA Installation of Inst. cables/ Tubing

0.03

Install Cable Trays

0.11

Glanding & Termination works

0.07

Installation of JB

0.02

Air Supply Piping/ Tubing for Valves

0.05

Shut down ‐ Instrument work

0.10

Calibration of Instruments

0.02

WET CRUDE TANK AREA

2.58

Installation of Inst. cables/ Tubing

0.94

Glanding & Termination works

0.59

Installation of JB

0.03

Air Supply Piping/ Tubing works for Valves

0.46

Shutdown ‐ Instrument work

0.15

Calibration of Instruments

0.02

Installation of Inst. cables/ Tubing

0.63 0.17

Glanding & Termination works

0.13

Installation of JB

0.01

Air Supply Piping/Tubing for valves

0.11

Shutdown ‐ Instrument work

0.07

Calibration of Instruments Installation of Inst. cables/ Tubing

0.07

2.39 0.32

Glanding & Termination works

0.76

Installation of JB

0.01

Air Supply Piping/ Tubing for Valves

0.60

Shutdown ‐ Instrument work

0.25

Calibration of Instruments

0.09

DESALTER A&B AREA Demolition of Old Redundant Pipe lines

36,925.500

0.36

Install Cable Trays

DEMOLITION

9,733.500

0.07

Install Cable Trays

PUMPING AREA

39,861.000

0.39

Install Cable Trays

PIPE WAY

COST IN KD % COMPLETE

0.01

3.80

Installation of all AG RTRP Pipes

PUMPING AREA

CONTRACT VALUE

0.78

12,051.000

0.18

2,781.000

0.12

Demolition of Old redundant valves

0.04

Demolition of Old reduntant Instruments & Cables

0.02

Page 9 of 10

PREVIOUS PERIOD

CURRENT PERIOD

CUMULATIVE UPTO CURRENT PERIOD

REMARKS