DESCRIPTION
% WT
Install Mech Valves
0.12
Hydrotesting of Pipelines
0.03
Painting of A/G Piping & Supports
0.01
Tentative S/D to be discussed with KOC
0.18
Installation of Corrosion Monitoring Fittings
PIPE WAY Installation of all AG Steel Pipes
0.36 0.01
Installation of UG RTRP Pipes
0.28
Install Mech Valves
0.07
Hydrotesting of Pipelines
0.40
Painting of A/G Piping & Supports
0.60
Tentative S/D to be discussed with KOC
0.17
Installation of all AG Steel Pipes
58,710.000
1.90
Installation of all UG Steel Pipes
Installation of Corrosion Monitoring Fittings
0.01
1.18
18,231.000
0.05
Installation of all AG RTRP Pipes
0.04
Installation of Corrosion Monitoring Fittings
0.01
Install Control Valves
0.70
Installation of Flow Elements
0.05
Install Mech Valves
0.10
Hydrotesting of Pipelines
0.03
Painting of A/G Piping & Supports
0.02
Tentative S/D to be discussed with KOC
0.18
Finish Construction
0.00
INSTRUMENTATION
6.00
92,700.000
0.40
6,180.000
DESALTER A&B AREA Installation of Inst. cables/ Tubing
0.03
Install Cable Trays
0.11
Glanding & Termination works
0.07
Installation of JB
0.02
Air Supply Piping/ Tubing for Valves
0.05
Shut down ‐ Instrument work
0.10
Calibration of Instruments
0.02
WET CRUDE TANK AREA
2.58
Installation of Inst. cables/ Tubing
0.94
Glanding & Termination works
0.59
Installation of JB
0.03
Air Supply Piping/ Tubing works for Valves
0.46
Shutdown ‐ Instrument work
0.15
Calibration of Instruments
0.02
Installation of Inst. cables/ Tubing
0.63 0.17
Glanding & Termination works
0.13
Installation of JB
0.01
Air Supply Piping/Tubing for valves
0.11
Shutdown ‐ Instrument work
0.07
Calibration of Instruments Installation of Inst. cables/ Tubing
0.07
2.39 0.32
Glanding & Termination works
0.76
Installation of JB
0.01
Air Supply Piping/ Tubing for Valves
0.60
Shutdown ‐ Instrument work
0.25
Calibration of Instruments
0.09
DESALTER A&B AREA Demolition of Old Redundant Pipe lines
36,925.500
0.36
Install Cable Trays
DEMOLITION
9,733.500
0.07
Install Cable Trays
PUMPING AREA
39,861.000
0.39
Install Cable Trays
PIPE WAY
COST IN KD % COMPLETE
0.01
3.80
Installation of all AG RTRP Pipes
PUMPING AREA
CONTRACT VALUE
0.78
12,051.000
0.18
2,781.000
0.12
Demolition of Old redundant valves
0.04
Demolition of Old reduntant Instruments & Cables
0.02
Page 9 of 10
PREVIOUS PERIOD
CURRENT PERIOD
CUMULATIVE UPTO CURRENT PERIOD
REMARKS