AR315 Architecture Design Studio 03 Jul Nov 2022 Lecturers: Ms. Ida Marlina Mazlan, Ms. Intan Liana Samsudin, Dr. Gibert OLA ELNAZEER BABIKER MOHAMED 1002162250 Portfolio
Table Of Contents
Project
Project
Project
Project
Project
Project
Project
1 2-6 Project 2 7-21 Project 3 22-31
1A: Interpretation Culture Line Artwork
1B: Sculpture
1: Documentation (History 3)
2A: Site analysis Site demarcation Vernadoc drawings
2: Science analysis (Tadom hill resort)
2B: Response Model Project 3: Final Design Project 2: Services of design studio project (Water supply & Sewerage system) 1
Project 1
Project 1A: Interpretation Culture Line Artwork
Project 1B: Sculpture
Project 1: Documentation (History 3)
Introduction
Culture is a reflection of a community or nation. This makes culture a vital and important determining factor of how the community reacts, responds, and grows. Culture plays a major role in the lives of everyone in the society
Task
Individually, students are to find any elements in regards to the Orang Asli in Malaysia to interpret it into a line artwork
To further understand the interpretation of culture in Orang Asli, Students are to refer individually to their drawings and manipulate them into a 3D form; Sculpture
1
2
Project
Project
Project
Project
1
1
1A: Interpretation Culture - Line Artwork
1B: Sculpture
1: Documentation (History 3) Project 1A: Interpretation Culture Line Artwork 3
1 Project 1 Project 1A: Interpretation Culture Line Artwork Project 1B: Sculpture Project 1: Documentation (History 3) Project 1B: Sculpture 4
1 Project 1 Project 1A: Interpretation Culture Line Artwork Project 1B: Sculpture Project 1: Documentation (History 3) 5 Project 1: Documentation (History 3)
1 Project 1 Project 1A: Interpretation Culture Line Artwork Project 1B: Sculpture Project 1: Documentation (History 3) 6 Project 1: Documentation (History 3)
Project 2
Project 2A: Site analysis Site demarcation Vernadoc drawings
Project 2: Science analysis (Tadom hill resort)
Project 2B: Response Model
Introduction Task
Tadom Hill Resorts started out as a village of the indigenous Temuan tribe, surrounded by acres of forests fronting an emerald lake (that used to be a limestone quarry). What makes Tadom Hill Resort special is the unique bamboo culture that plays a prominent part in the aboriginal lifestyle
In a group students are to analyze Tadom Hill Resort site. As a member of Dr Mike's group, we were asked to focus about the Topography & Climate of the site to choose the perfect site demarcation and then create the response models
2
7
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response Model Project 2A: Site analysis 8
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response Model Project 2A: Site analysis 9
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response Model Project 2A: Site analysis 10
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response Model Project 2A: Site analysis VideoAnimation 11
Project 2A: Site analysis
Site demarcation
Site demarcation
Vernadoc drawings
Project 2: Science analysis (Tadom hill resort)
Project 2B: Response Model
My group decided on choosing the water site near the Tadom Hill Resort, this site is surrounded by hill, land and water. The site demarcation can be easily accessed from the road and also from a pathway from the resort
Video taken from the site demarcation showing the view towards Tadom Hill Resort
2 Project 2
12
Project
Project
Project
Sphere
Is the Building that I
draw with my other 2
(Tadom hill resort)
Model
Semantan Chalet Chalet
2 Project 2
2A: Site analysis Site demarcation Vernadoc drawings
2: Science analysis
2B: Response
Vernadoc drawings
Cafe Hall Lake Side Bamboo Chalet
Hammock
helped to
group members 13
Project
Project
Project
hill resort)
2 Project 2
2A: Site analysis Site demarcation Vernadoc drawings
2: Science analysis (Tadom
2B: Response Model Vernadoc drawings
Hakka Village Lake Side Cafe
Bamboo Madu Chalet Chalet
14
Project 2A:
analysis
Project 2: Science analysis (Tadom hill resort)
Project 2: Science analysis (Tadom hill resort)
Project 2B: Response Model
Drawings integrated with AR343 Building Science 1
In a group of 3 students, we were asked to choose a building and analyze it scientifically. One student (Ethar Khalid) was asked to analyze a building from Tadom Hill Resort, the student chose the gaming room in the resort to analyze it.
2 Project 2
Site
Site demarcation Vernadoc drawings
15
Project
Project
Project
Drawings
(Tadom hill resort)
(Tadom hill resort)
AR343
2 Project 2
2A: Site analysis Site demarcation Vernadoc drawings
2: Science analysis
2B: Response Model Project 2: Science analysis
integrated with
Building Science 1 16
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response ModelProject 2B: Response Model 17
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response ModelProject 2B: Response Model 18
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response ModelProject 2B: Response Model 18
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response ModelProject 2B: Response Model 20
2 Project 2 Project 2A: Site analysis Site demarcation Vernadoc drawings Project 2: Science analysis (Tadom hill resort) Project 2B: Response ModelProject 2B: Response Model 21
Project 3
Project 3: Final Design
Project 2: Services of design studio project (Water supply & Sewerage system)
Introduction Task
After understanding the site and the community of area of Tadom, culture of orang asli and the business of Tadom, This project will explore the fundamental part of the design process: identifying and utilizing the basic elements of a place
-Individually, students are to create an Ideation and manifasto poster for their proposed program related to the site and community, Then to propose a centre that will accommodate a communal space for activities of up to 20 users based on the needs of the community
3
22
3 Project 3 Project 3: Final Design Project 2: Services of design studio project (Water supply & Sewerage system) Project 3: Final Design Manifasto Poster Theprogramandmanifestopostershowsmyintentionsfor myproposedprogramrelatedtothesiteandcommunity.It includesproposedspacesandideationinrelationtomy program.Italsoconsiderstheissues,designconcept, targetusersandtheprograms. GROUND LEVEL EXHIBITION CAFE SITTING UW/C TLTES ENTRANCE RECIPTION S S2 FIRST LEVELPUBLIC ACCESS PRIVTE ACCESS W/C LIBRARY TERACCE VOID UTLITIES S1 S2 STORAGE STAFF ROOM QUITE ZONE Bubble Diagrams SCHDULE OF AREA AREA SIZE AREA SIZE EXHIBITION CAFE ENTRANCE RECIPTION SITTING W/C UTILITIES LIBRARY TERACCE QUITE ZONE STORAGE STAFF ROOM Staircase S1 Staircase S2 122sqm 325sqm 28sqm 31sqm 36sqm 155sqm 69sqm 857sqm 37sqm 168sqm 7sqm 10sqm 4sqm 52sqm DESIGN PROGRESS sketches 23
Project
Project
Project
Project
Key Plan 1:1000
Site Plan 1:200
3
3
3: Final Design
2: Services of design studio project (Water supply & Sewerage system)
3: Final Design
24
Project
Project
Project
Project
3
3
3: Final Design
2: Services of design studio project (Water supply & Sewerage system)
3: Final Design 25
Project
Project
Project
Project
system)
3
3
3: Final Design
2: Services of design studio project (Water supply & Sewerage
3: Final Design 26
Project
Project
Project
Project
3
3
3: Final Design
2: Services of design studio project (Water supply & Sewerage system)
3: Final Design 27
Project
Project
Project
Project
3
3
3: Final Design
2: Services of design studio project (Water supply & Sewerage system)
3: Final Design 28
Models in the
process
3 Project 3 Project 3: Final Design Project 2: Services of design studio project (Water supply & Sewerage system) Project 3: Final Design
thinking
First Model Second Model 29
3 Project 3 Project 3: Final Design Project 2: Services of design studio project (Water supply & Sewerage system) Project 3: Final Design Final Model 30
Project
Project 3: Final Design
Project 2: Services of design studio project (Water supply & Sewerage system)
Project 2: Services of design studio project (Water supply & Sewerage system)
Drawings integrated with AR333 Building Services 1
3
3
31
Thank you The End