Tailored Scaffolding Solution to the Onshore and Offshore Industries

Page 1

TAILORED SCAFFOLDING SOLUTION FOR THE ONSHORE AND OFFSHORE INDUSTRIES

Customer-Oriented

Safety-Minded

High-Quality

Innovative

Competent

Service-Oriented

Reliable

Environmentally-Friendly


INDUSTRIAL SCAFFOLDING FROM STANDARD TO CUSTOM-MADE SCAFFOLDING

WORKING PLATFORMS AND SCAFFOLDING Our working platforms and scaffolding are quick to fabricate and are available for use for new construction, renovation as well as maintenance and repair work. You receive working and load-bearing scaffolding, open or closed, as needed, in one and the same structure.

SCAFFOLDING CHARACTERISTICS AND EQUIPMENT:

• Stand-alone, without a need for brickwork anchoring; • All-encompassing fall protection; • Extended scaffolding width to ensure maximum stability

of the steel beams and to guarantee accident-free work, but without resorting to wood or overlaps; • Cover that ensures weather-independent work; A scaffolding that is wrapped in tarpaulin or foil quickly becomes a windand weather-resistant, thermally insulated tent/winter structure.

STAIRWAY TOWERS AND BRIDGE CROSSINGS Our rentable stairways and bridge crossings provide you access. And they are always optimally adapted to the local conditions at hand.

• Available on short notice and quickly assembled, as a temporary solution from today to tomorrow;

• Without foundations, with maximum stability and • •

stability (statics) documentation available; Safe for all loads: All stairway towers meet, as required, the highest safety requirements; Sound-protected with Layher Protect System.

We use the Layher Allround Scaffolding System, which is supplied by the market leader in the industry, Wilhelm Layher GmbH & Co. KG.


TENT AND WINTER STRUCTURES APPROPRIATE TENT AND WINTER STRUCTURES

TENT STRUCTURES WITH STANDARD DIMENSIONS CAN BE EXTENDED, AS DESIRED

• Inner width of 12.5 m; • Free-standing inner height of 6.2 m; • Inner length calculated in

sections of 3 metres each. The PVC tarpaulin of reinforced, fire-resistant polyester is available in white and/or light grey and ensures good lighting conditions inside the tent structure.

SOLID TENTS • Able to withstand even the hardest • • •

weather conditions; Lightweight structure of anodized aluminium; Can be installed quickly by 2-3 workers; Equipped with crane eyelets to permit quick moving of the structure.

TEMPORARY SPACE SOLUTIONS, LIGHTWEIGHT AND ROBUST AT THE SAME TIME TENT AND WINTER STRUCTURES The purpose of the tent and winter structure is to protect people and equipment against the elements. They can be used all year round. A tent structure can also protect the surrounding environment – against possible environmental impacts, e.g. in the form of dust that can be generated in the course of work.


INTERIM HALLS

FAST ASSEMBLED, DURABLE WEATHER PROTECTION

A NUMBER OF DIFFERENT EQUIPMENT OPTIONS FOR TEMPORARY HALLS • Option for cladding with tarpaulin • • •

or profiled steel plates; Possible to achieve a heat transfer coefficient of 0.5 with suitable heat insulation measures; Possible to integrate sliding roofs as well as crane systems with a lifting load of 3 tonnes; Individual components available for connection to existing buildings or halls.

ADVANTAGES OF TEMPORARY HALLS COMPARED TO TRADITIONAL HALL BUILDINGS • No construction permits required, • • •

since there is tried out statics for the anchoring of the scaffolding; Structures without foundation that can be extended, as desired; Many different equipment, wall and roof versions; Short design and fabrication stages.


SHRINK WRAP

FLEXIBLE – HIGH CARRYING CAPACITY – LOW COSTS – ENVIRONMENTALLY-FRIENDLY POSSIBLE USES OF SHRINK WRAP • Sanitation, renovation, • • • • • •

ADVANTAGES OF SHRINK WRAP • Many variants available; • Wind and waterproof; • Guaranteed UV resistance for at least 12 months;

• Available in a fireproof design • •

(certified according to DIN 4102-1 for building material class B1); Environmentally-friendly PE foil; Low-cost disposal.

Secure quick and cheap protection of your project or product with shrink wrap against environmental impacts and fire and the environment against harmful emissions! Shrink wrap can provide optimal protection against environmental impacts even for complex shapes and structures, since the foil fits closely after it has been exposed to thermal treatment and shrinks. Shrink wrap can also be used instead of tarpaulin or tent canvas and can be draped, e.g. over scaffolding as weatherresistant disposable cover.

new construction; Asbestos removal cover that can be used in vacuum; Airtight cover for varnishing work; Sandblasting cover; As a tent, cover, temporary roofing; Industry / shipbuilding / wind turbine construction; Protected storage and transport protection for installations and machinery, etc. can optionally be provided with tarpaulin or profiled steel plates.


CASE: SCAFFOLDING FOR THE BEATRICE OFFSHORE WIND FARM Bladt Industries A/S was contracted to build 30 jacket foundations for the Beatrice Offshore Wind Farm. The work was done at the old Lindø shipyard in Munkebo. The area now goes by the name of Lindø Port of Odense A/S.

COST-SAVING GANGWAY The pictures are from the work process where the bottom and top structures of the jacket foundations were assembled (welded together). The gangway or the Layher FW system, as it is more accurately designated, turned out to be particularly advantageous for this task, since it saves a lot of material, personnel, time and thereby also money.

WORKFLOW The gangway and the associated cantilevers are put together on the ground, lifted into place and lowered down again with a crane. This means that the primary focus of the work at heights is on construction and dismantling around the jacket legs. The work with the Layher FW system placed major demands on the static work, but the job was done professionally and to Bladt Industries’ complete satisfaction in cooperation with our external engineer and the customer. As an element in the entire logistics concept, we provided a GEDA P18 lift for the staircase tower, where the upper and lower part of the jacket foundations were welded together. The staircase tower was some 40 to 45 metres tall, a height that the lift could climb in 1.5 minutes, which helped the customer avoid, among other things, a number of crane lifting operations. What is more, a lift can run almost all the time, whereas the operating hours of a crane are unreliable because of wind conditions.

PROJECT DATA: Project period: October 2016 – May 2018

INNOVATION FROM LAYHER

Customer: Bladt Industries A/S

The Layher FW system is the latest innovative solution to come from scaffolding producer Layher, and this was the first time when it was ever used in such a magnitude.

Scaffolding material: Layher Allround


CASE: SCAFFOLDING FOR THE WIKINGER OFFSHORE WIND FARM Bladt Industries A/S was contracted to produce 41 jacket foundations for the Wikinger Offshore Wind Farm for around 16 months in 2015 and 2016. The scaffolding job was awarded to Ostsee GerĂźstbau GmbH. Founded in 1993 the company has built up a wide range of competencies and know-how, a lot of which came into play during this exciting project. The experiences and know-how acquired specifically from this project manifested itself, among other things, in the subsequent project on the Beatrice Offshore Wind Farm.

WORKFLOW In addition to activities in other areas, there were 4 construction sites in the south hall, with associated staircase towers with a height of up to 25 metres and various suspended scaffolding in conjunction with the welding of individual components to larger units. There was further an outdoor construction site next to the south hall, which used a Layher cassette roof on a 45-cm-tall Layher lattice beam, as well as 23-metre-tall staircase towers with the appropriate ballasting that was computed for the job by our external engineer. It must also be noted that scaffolding producer Layher provided professional service during the design stage.

PROJECT DATA: Project period: 16 months (2015-2016) Customer: Bladt Industries A/S Scaffolding material: Layher Allround


FIELDS OF APPLICATION FOR SCAFFOLDING

ADVANTAGES OF SCAFFOLDING INSTALLATION

Construction and installation work

A scaffolding makes all areas and components accessible

Shipbuilding/shipyards

Makes it possible for various work to be done at the same time

Industry/mechanical engineering

Short construction and repair times

Construction of wind power plants

If the conditions change, the scaffolding can quickly be custommade and moved

Offshore repair work

DO YOU NEED A WEATHERPROOF COVER FOR YOUR CONSTRUCTION SITE, SCAFFOLDING, INSTALLATION OR STRUCTURAL PARTS? GET IN TOUCH WITH US, AND WE WILL PREPARE A SUITABLE OFFER FOR YOU!

Ostsee Gerüstbau GmbH

O.G. Specialstilladser ApS

www.ostsee-geruestbau.de info@ostsee-geruestbau.de

www.ogspecialstilladser.dk info@ogspecialstilladser.dk

Waldheide 1, 17509 Lubmin, Germany Tel.: +49 (0)4826 615031

Kystvejen 100B, floor 1, door 12 DK-5330 Munkebo Tel.: +45 6595 2525


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.