Malawi Transport Sector Multimodal Development and Potential Public Private Partnership Study

Page 133

Road

Description

Total Total NonLength(km) Motorised Motorised Good (%)

Fair (%)

Poor (%)

Road Condition (IRI)

Surface Type

4 to 7 Years S116 S122 S135 S126 S139/T401 S117 T315 S138 T378 S149 M001/M006 M012 M001

Bowe Jnc S116/T339 - Kamsonga Jnc S116/T340 Mpatsanjoke Bridge - Livingstonia Hotel Ntcheu-Tsangano-Neno-Mwanza Linthipe - Lobi Lirangwe - Machinga Lilongwe - Kasiya - Santhe Mbowe: Jnc M1/T315 - Mazamba Hill: Jnc S110 Mwanza - Chapananga - Chikwawa Monkey Bay - Cape MacLear Losa: Jnc M4/S149 - Chonde: Jnc M2/S149 Blantyre - Mwanza Lilongwe - Mchinji Chikwawa - Blantyre

14.1

21

37

100

0

0

5.52

Earth

2.2 140 13.5 14.9 133

739 26 100 19 74

880 94 1422 1327 1461

100 45 0 46.4 12.2

0 54.4 0 24.7 39

0 0.6 100 28.9 48.8

2.66 6.63 15.59 9.4 9.96

Chip Seal Earth Earth Earth Earth

21.4 106 18

120 147 83

166 1453 643

0 4.3 0

0 25.7 18.3

100 70 81.7

16.45 11.55 13.18

Earth Earth Earth

22.1 104 109 54

n/a 525 1084 604

n/a 145 710 1453

61.1 91.3 80.6 88

38.9 7.7 18.9 3.5

0 1.1 0.5 8.5

6.95 2.17 3.2 3.29

Earth Chip Seal Chip Seal Chip Seal

More than 7 Years M010

Njolo: Jnc M5/M10 - Kapiri: Jnc M10/S127 Ntchisi: Jnc M7/T341 - Mwangala Crossroads Mitundu: Jnc S125/Market - Start Diamphwe Bridge Rumphi - Nyika - Chitipa Chinganya: Jnc M5/T319 - Sanga: At the Court LHS

15.4

186

695

0

19.9

80.1

10.86

Earth

17.8

542

1116

65.6

34.4

0

6.75

Earth

22.1 275

18 314

1172 555

0.6 78.8

9.2 14

90.2 7.2

10.75 5.2

Earth Earth

4.5

27

186

0

56

44

9.51

Earth

35.1

89

932

99.6

0

0.4

3.68

Earth

30.7

13

61

0.8

0

99.2

13.09

Earth

13.8

41

1459

0

22.2

77.8

10.9

Earth

1

237

940

9.68

3.2

0

2.98

Asphalt

21.4 22

237 22

940 2534

0 18.3

28.7 73.1

71.3 8.6

10.75 8.09

Asphalt Earth

S129

Mqosha Customs - Jenda: Jnc M1/M20 Mazamba Hill: Jnc S110 - Mzenga: Jnc S110/T317 Hoba: Jnc M3/S133 - Mbela: Jnc S133/T383 Mwanjati: Start at box culvert - Chingo: Jnc M3/S129 Start Unga River Bridge - Mwanjati: Start at box culvert Chiringa - Mloza Makanjira: Jnc S129/T377 - Start Unga Bridge

1

237

940

5.3

0

94.7

11.61

Earth

T418

Didi: Jnc at TC - Thunga: Jnc M2/T418

21.4

333

438

0

37

63

11.41

Earth

M007 S125 M009 T319 M020 S110 S133 S129 S129 T415

133


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Malawi Transport Sector Multimodal Development and Potential Public Private Partnership Study by Olivier CROUZIER - Issuu