area-and-budget-worksheet

Page 1

Conceptual Area & Budget Worksheet Please note these budgets are drawn from historic data and extrapolations from similar projects and are not be construed as formal estimate of construction cost; this is provided as a way of evaluating the building efficiencies and illustrate the challenges faced in reuse of the Building. I t confirms that $40+ million is probably a good starting point for full renovation. It illustrates how important the tax credits and other incentives are to developers in closing the substantial “gap” in a project proforma of any type. See BOE Architects estimates for school rehab assumptions, which ranged from $45-70 million.

RESIDENTIAL

Schenley High School Vision Plan RESIDENTIAL RENTALS OPTION: Tax Credits; Auditorium remains/W/INCUBATOR/LEARNING CTR Building Area (approx)

(GSF)

(USF)

1BR

2BR

Subbasement

25,000

12,000

0

-

-

Basement

66,430

55,000

0

-

-

Ground Floor

66,430

55,000

0

First Floor

56,580

32,800

Second Floor

56,580

Third Floor

56,580 327,600

Totals

Construction System

Add Auditorium

PFAFFMANN + ASSOCIATES 7/9/12

12,000 55,000

16

2

8,900

23

2

32,800

4,500

24

2

32,800

4,500

24

2

220,400

17,900

87

Total USF

238,300

Area basis

95

Unit Budget

Class/Workshop

8

25,000

92,000

TOTAL units

Budget

Site Work (Parking & LA)

100,000

$

15,000

$

1,875,000

Demolition/Asbestos

327,600

$

20.00

$

6,552,000

Shell/core

327,600

$

35.00

$

11,466,000

Apartment GC

220,400

$

25.00

$

5,510,000

Electric

238,300

$

15.00

$

3,574,500

HVAC

238,300

$

20.00

$

4,766,000

Plumbing

220,400

$

10.00

$

2,204,000

Fire protection

327,600

$

2.50

$

819,000

125 parking spaces (75 grade/50 on deck)

Corridors elevators common space

Assume gas fired heat pump w/HRC 800 fixture units Fully sprinkler

$ 34,891,500

Base Design & Construction Costs

CM/GC Fee (5%)

$

1,744,575

Contingency (10%)

$

3,489,150

Soft Costs (10%)

$

3,489,150

$

$ 43,614,375

459,099

limit on State Tax 20% Credit $500,000 Fed Tax credit: 20%

OFFICE

Schenley High School Vision Plan SINGLE OCCUPANT OFFICE W/INCUBATOR/LEARNING CTR (TAX CREDITS IF AUDITORIUM REMAINS) Building Area (approx)

(GSF)

(USF)

Subbasement

25,000

-

Basement

66,430

-

Ground Floor

66,430

23,400

First Floor

56,580

32,800

8,900

Second Floor

56,580

32,800

8,900

Third Floor

56,580

32,800

8,900

327,600

121,800

26,700

Totals

PFAFFMANN + ASSOCIATES 7/9/12

Add Auditorium

1

Class/Workshop

0

12,000

0

55,000

0

25,000

148,500

92,000

240,500 -

Construction System

Area basis

Unit Budget

Budget

Site Work (Parking & LA)

100,000

$

15,000.00

$

1,875,000

Demolition/Asbestos

327,600

$

20.00

$

6,552,000

Shell/core

327,600

$

45.00

$

14,742,000

Electric

240,500

$

15.00

$

3,607,500

HVAC

240,500

$

20.00

$

4,810,000

Assume gas fired heat pump w/HRC

Plumbing

240,500

$

7.00

$

1,683,500

100 FU

Fire protection

320,000

$

3.00

$

960,000

$

98.76

$

32,355,000

Contractors Fee (5%)

$

1,617,750

Contingency (10%)

$

3,235,500

Soft Costs (10%)

$

3,235,500

$

$

40,443,750

$/GSF:

Base Design & Construction Costs

$/USF:

272

125 parking spaces (75 grade/50 on deck)

Corridors elevators common space

Fully sprinkler


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
area-and-budget-worksheet by Oakland Planning and Development Corporation - Issuu