PER_NEIGH3 Friday, January 11 2013 Page 1 of 4
Ravenstahl Response Center Detail Report For One Neighborhood For Time Period:
Request ID Composed 315150
12/03/2012 09:08 am
History Info 315267
12/07/12 07:12 AM
12/03/2012 03:18 pm
Status Completed
12/01/2012
To
Neighborhood:
12/31/2012
Central Oakland
Location
Refer To Dept.
Problem Type
DPW - Sts ... & Pks, 3rd Div
Potholes
0413 Mckee Pl
COMPLETED -- G. MCCAIN 12/5/12 Sent To Department
Parking ... Enforcement-Exe. Dir.
Meters
0000 Atwood St
Sent To Department
DPW - Asphalt ...
Drainage
0000 Oakland Av
History Info 315402
12/05/2012 08:21 am
History Info 315775
12/10/2012 02:17 pm
History Info 316040
01/04/13 02:02 PM
12/10/12 02:20 PM
12/13/2012 08:16 am 01/10/13 11:18 AM
History Info
REFER TO ASPHALT; STREET NEEDS GRADED -- G. MCCAIN 12/28/12 Completed
City Source ... Associates, Inc. Clean
0000 Blvd Of The Allies
Completed 12/5/12 City Source Completed
DPW - Transportation ... & Engineering
Painting Crosswalks
0372 Mckee Pl
Although we realize that pedestrians must cross the street at many locations, marked crossings are completed only when all safety standards can be met. Locations within an intersection are legal crossings, and we ask that pedestrians use extreme care when crossing the street. This location does not meet warrants for a crosswalk. R. Freyermuth
316246
12/17/2012 09:06 am 01/10/13 11:07 AM
History Info
Completed
DPW - Transportation ... & Engineering
Painting Crosswalks
0000 Atwood St
We will send I.O. #11820 to DPW Traffic to renew work order #57791 to repaint the crosswalk during the upcoming 2013 painting season. R. Freyermuth
316298
12/17/2012 10:52 am
History Info
Acknowledged
DPW - Traffic ...
Graffiti
3535 Ward St