POR TFO LIO
Architecture should always be exciting and moving for its inhabitants. I believe that small details and the quality of space can transform the way a specific place is used and experienced.

As BIM Consultant at UN, I am a key member of the BIM management team. My position involves organising the implementation of BIM from the early stages, ensuring that all existing information meets quality criteria and that future projects are developed in the most productive way.
For the last years, I have gained full experience in the design, construction, and delivery of projects in different sectors, as well as in managing the BIM and digital information element of multidisciplinary projects.
I enjoy working in a fluid, dynamic organization with a minimal amount of direction, where it is essential the ability to use time productively and work efficiently to achieve team/ project goals.
Seeking new opportunities where I can support, influence, and expand my knowledge about the building and coordination process within the BIM methodology.
SOFTWARE SKILLS
BIM: REVIT + Navisworks + BIM360 + Archibus + Enscape (Virtual Reality) + Archicad 23
LinkedIn certifications: Become a Bim Coordinator + Navisworks: Clash Detection
AutoCAD (8+ years Professional Experience, 6 years personal experience)
SketchUp, Rhino + VRay
Photoshop + Illustrator + Indesign + Premiere (Professional knowledge)
3D StudioMax + VRay (30h course)
EDUCATION
2016
Architect by School of Architecture, Universidad Politécnica de Madrid
2015-2016
Master’s degree in Architecture, Universidad Politécnica de Madrid
2010-2015
Grade in Architecture, Universidad Politécnica de Madrid
ARCHITECTURE EXPERIENCE
JUN 2022 - APR 2023
United Nations Office, Geneva, Switzerland
BIM Expert Consultant
Key experience: BIM implementation at the United Nations. This includes developing a BIM strategy for future internal projects and implementing CMMS for the maintenance of existing buildings.
AUG 2019 - JUN 2022
ColladoCollins Architects, London
ARB Lead Design Architect
Key experience: major residential mixed-use schemes and new later living residential building design process and technical development (BIM - Revit).
JAN 2022 – JUN 2022
Royal Tunbridge Wells, mixed use and elderly residential scheme – £63.085m 22,700 m2
Concept and design development / RIBA
Workstage: 2-3
NOV 2020 – JAN 2022
The Sylvans, 53 Dwellings - Later living residential building, Sevenoaks, Kent –6,750 m2
Technical development / RIBA
Workstage: 3-4
JUN 2020 – NOV 2020
Access Homes. Residential, Offices & Storage, London –27,000 m2 Design / RIBA Workstage: 2-3
JAN 2020 – JUN 2020
Shootersway. 103 Dwellings, Berkhamsted, Hertfordshire – 15,733 m2 Design / RIBA Workstage: 1-3
JAN 2017- JUN 2019
ESTUDIO ALVAREZ SALA, Madrid
Architect Designer
Key experience: complete new residential building design process with varied work methodology (AutoCad and Revit).
FEB 2017- JUN 2019
122 Dwellings incorporating mixed
NURIA MERCADÉ
use at ground floor and city planning modification, Barcelona
Strategic definition– construction
OCT 2018 – JUN 2019
85 Dwellings Building, Madrid
Design stage.
MAR 2019
Private Residential Building
Contest, Madrid
NOV 2018 – DIC 2018
TABIT building, 91 Dwellings
Residential Building, Madrid
Technical design
JUL 2017- JAN 2018
AURA Homes, 254 Dwellings
Residential Building, Madrid
Developed design – technical design
JAN 2017- FEB 2017
Office Building Refurbisment, Madrid
Technical design
SEP 2018-JUL 2019 INDEPENDENT ARCHITECT
Complete House Refurbishing, Madrid – 317 m2
AWARDS, EXHIBITIONS & PUBLICATIONS
2015
Community of Madrid Excellence Award
2013
Community of Madrid Excellence Award
DEC 2012
Collective Exhibition: “1912.DIA.D –UD Campo Baeza”
2010
Collective Exhibition: “Materia y Espacio ”experimental workshop, commissioned by Ignacio Vicens
2012
Freehand Drawing Publication: “255.255.255 daetsam” Magazine
LANGUAGES
Spanish - Mother tongue
English - Professional C1
French - Intermediate B1 (currently studying)
FORMER ABC CINEMA SITE
162 DWELLINGS, RETAIL & CAR PARK - LATER LIVING SCHEME ROYAL TUNBRIDGE WELLS, KENT



Constructed Area: 22,700 m2
Cost: £63.085m
Client: Retirement Villages Group Ltd
Workstage: 2, Pre-Planning - REVIT & ScketchUp

The site sits in the geographic centre of Tunbridge Wells at the crossroads between Mount Pleasant Road which runs north-south linking the historic Pantiles with more recent development, and Church Road / Crescent Road running east-west between Calverley Park and Tunbridge Wells Common. The main Civic centre of the town, an impressive NeoGeorgian building constructed in 1934, the same year the Ritz Cinema opened, sits diagonally opposite the site framing an important open space which currently lacks enclosure due to the absence of any building on the site.
The various elements of the building face a rich mix of architectural styles reflecting the long and varied history of the development of Tunbridge Wells, from the stuccoed Regency style so prevalent in the residential and historic quarters, through the neo-Gothic follies, the ArtDeco influence of the Civic Centre, and even the Brutalist style of the Axa offices there is a rich mix to respond to.
The proposals are for a mixed-use scheme promoting active frontages along Mount Pleasant Road and Church Road to reintegrate the site into the town and bolster the link between the north and south retail areas. Retail uses facing Mount Pleasant Road for small local retailers are proposed, with a mix of catering and wellbeing uses further up the hill and within the public courtyard. Above these, residential apartments are proposed, with each dwelling provided with a private terrace or balcony.


The public realm serves as the key interface between the functions, weaving the development into the town and providing access to the amenity functions and the residential uses. The footpath traversing the site through the courtyard connects Mount Pleasant Road with the Clandircarde Estate and the GP surgery which serves an important local function.

THE SYLVANS 53 DWELLINGS - LATER LIVING RESIDENTIAL BUILDING SEVENOAKS, KENT
Constructed Area: 6,750 m2
Client: ELYSIAN RESIDENCES
Workstage: 3, Planning - REVIT




























The Sylvans site forms part of the wider Wildernesse House redevelopment.
The redevelopment masterplan includes the Grade II listed Wildernesse House conversion into apartments for older people with communal facilities as well as eight Mews Houses, parking and associated landscaping.

The proposed works involve the construction of five buildings comprising 53 units of extra care accommodation for older people (sui generis use).
The spatial character of the Wildernesse Estate has informed the number and distribution of blocks in this part of the site. A mix of stepped two and three storey blocks are proposed relating to the site topography and being lower next to the southern boundary and existing houses.
The spaces between the blocks are intended to be informal in character with a woodland feel. Paths will get more formal as they are nearer the house.




THE SYLVANS 53 DWELLINGS - LATER LIVING RESIDENTIAL BUILDING SEVENOAKS, KENT
Constructed Area: 6,750 m2
Client: ELYSIAN RESIDENCES
Workstage: 4, Technical design - REVIT


INTERNAL LAYOUTS:
As the project coordinator team, we received from the interior architects the design intent concept and we were responsible of developing it further on. This included creating construction drawing packages for finishes, RCP, fittings (kitchens, bathrooms and built-in wardrobes) and specification documents (sanitaryware, appliances and finishes)
SHELL AND CORE:
Development in detail of the façade, external walls, internal walls, roof joints, windows and doors schedule, among others.
We worked hand by hand with different consultants to develope the design of lobby areas, open staircases and cores. The preparation of detail studies included construction drawings, sections and technical details.





THE SYLVANS
53 DWELLINGS - LATER LIVING RESIDENTIAL BUILDING SEVENOAKS, KENT
Constructed Area: 6,750 m2
Client: ELYSIAN RESIDENCES
Workstage: 4, Technical design - REVIT








ACCESS HOMES RESIDENTIAL, OFFICES & STORAGE MENDIP RD, LONDON
Constructed Area: 27,000 m2
Client: ACCESS SELF STORAGE
Workstage: 1 to 3 - REVIT + SketchUp
The site, is situated in Battersea, an area located within the London Borough of Wandsworth in south west London. The borough of Wandsworth forms part of inner London and is located to the south of the River Thames, 2.9 miles south west of Charing Cross.
The building would be 8 storeys and 10 storeys facing York Road and 8 storeys and 13 storeys fronting Mendip Road. It would feature a 2 storey basement and a single storey podium.

The mixed-use scheme comprises: 131 Build to rent dwellings, 193 Sharedliving dwellings, 7,858m² Storage space, Flexible office space, 187m² Cafe.

Building heights are varied to respond to the surrounding urban context and the need to retain daylight/sunlight to
neighbouring residents. This height distinction allows for a prominent corner building on York/Mendip Road and a taller element facing the river maximising the river views.
The chosen materials respond to local architecture. This is predominantly brick and render with GRC and metal finishes proposed in emerging developments. The use of brick is extended to the majority of the scheme with a colour change to reflect the change in internal use between the Co-living and build to rent. The four volumes are split into two by changing the brick colour, although to retain the legibility of four buildings the detailing between the facades differs.



























SHOOTERSWAY 103 DWELLINGS, C2 EXTRA CARE BERKHAMSTED, HERTFORDSHIRE



Constructed Area: 15,733 m2
Client: ELYSIAN RESIDENCES
Workstage: 1 to 3 - REVIT + SketchUp

The proposal is to create a C2 Extra Care development with integrated amenities and care provision comprising 103 dwellings, with 75 parking spaces for residents, staff, and visitors.
The concept for the development as two groupings of three interlinked pavilions are reinforced by the materials selected for each volume. In each grouping the central volume contains the main circulation core and in the case of the western grouping (Block A) the central volume contains the main entrance to the development. The peripheral volumes are linked via glazed circulation spaces, and are subservient to the main central piece.
The use of different materials between the central linking volume and the peripheral buildings establishes a hierarchy of form and colour which reflects the internal arrangement. This breaks down the visual impact of the volume and simultaneously creates a diverse development for residents, integrating the colours of nature into the building - green elements to complement the verdant site and surroundings, and black elements to contrast with and highlight the green.
AURA HOMES 254 DWELLINGS - RESIDENTIAL BUILDING ALCOBENDAS, MADRID

Constructed Area: 53,518 m2
Cost: € 37.8m
Client: NEINOR HOMES
Workstage: 2 to 4 - REVIT
The complex of Espino del Cuquillo comprises 254 homes, 254 storage rooms and 475 parking spaces. It is completed with large garden areas and three community pools.
The plot in which the building is located has a very irregular perimeter that mixes straight and curved boundaries.
For this reason, the building dissociates itself from the official alignments and follows its own geometry, through gentle curvatures that also adapt to the topography. Two bands of houses with double orientation are projected. Living rooms, main bedrooms and terraces face the exterior and the secondary bedrooms face an inner street conveniently landscaped.
The communication core and halls are located in this intermediate street. Each core serves 2 or 4 homes in every floor. The parking and the storage rooms are located in two basements under the built area.












































































































































































PARADIS DEL MAR 122 DWELLINGS, MIXED-USE BUILDING MONTGAT, BARCELONA

Constructed Area: 13,466 m2
Cost: € 9.05m
Client: CONSTRUREAL
Workstage: 1 to 5 - AUTOCAD


The complex of Paradis del Mar is located in a restructuring area where industrial use is being substituted by housing.
As part of an industrial urban structure, there was a lack of green areas. For this reason, the first and fundamental intervention is made at an urbanistic scale. The Area’s Urbanistic Rules have been modified to include a new green public area.
After this action, the building is configured as a one L shaped block and it is located in the north edges, leaving the south

orientation to this new green area. This organization allows the building and gardens to have a better solar utilization. As a mixed-use building, in the lower floor we will find commercial locals. These spaces work as connectors between the existing street and the new public space. Concerning the dwelling, there is a huge typology variety as there are both public and private ones. Not segregating public and private housing allows a higher dynamism, flexibility and exclusive apartments.

BRUSELAS 38 COMPLETE OFFICE REFURBISHMENT ALCOBENDAS, MADRID
Constructed Area: 14,000 m2
Cost: € 7,88m
Client: COLONIAL AXIARE
Workstage: 4 - AUTOCAD
This construction was a completely aged building crying out for a change on its appearance and distribution.
The first premise was to design the distribution that allows to optimize the space and provide more flexibility. Due to the privileged position next to the only green area of the urban sector, it is essential to create a constant contact with the exterior.
In the new floorplan, all vertical communications of the building and the common spaces are condensed in the central area, permitting a second ring circulation within the lucrative office space.

With the opening of a courtyard, the central space acquires presence inside the building, full of light and with the possibility of relating some plants with others, and therefore, their people. In this atrium a panoramic elevator was incorporated.
Consequently, the office distribution around the communication space increases permeability and establishes visual relationship from one side to another of the building.
The differentiation between office space and common space is also defined by the decision on the pavements.



