Nuria Mercade PORTFOLIO 2023

Page 1

POR TFO LIO

NURIA MERCADÉ 2023

Architecture should always be exciting and moving for its inhabitants. I believe that small details and the quality of space can transform the way a specific place is used and experienced.

CONTACT nuriamerme@gmail.com +41 76 215 39 10
2

As BIM Consultant at UN, I am a key member of the BIM management team. My position involves organising the implementation of BIM from the early stages, ensuring that all existing information meets quality criteria and that future projects are developed in the most productive way.

For the last years, I have gained full experience in the design, construction, and delivery of projects in different sectors, as well as in managing the BIM and digital information element of multidisciplinary projects.

I enjoy working in a fluid, dynamic organization with a minimal amount of direction, where it is essential the ability to use time productively and work efficiently to achieve team/ project goals.

Seeking new opportunities where I can support, influence, and expand my knowledge about the building and coordination process within the BIM methodology.

SOFTWARE SKILLS

BIM: REVIT + Navisworks + BIM360 + Archibus + Enscape (Virtual Reality) + Archicad 23

LinkedIn certifications: Become a Bim Coordinator + Navisworks: Clash Detection

AutoCAD (8+ years Professional Experience, 6 years personal experience)

SketchUp, Rhino + VRay

Photoshop + Illustrator + Indesign + Premiere (Professional knowledge)

3D StudioMax + VRay (30h course)

EDUCATION

2016

Architect by School of Architecture, Universidad Politécnica de Madrid

2015-2016

Master’s degree in Architecture, Universidad Politécnica de Madrid

2010-2015

Grade in Architecture, Universidad Politécnica de Madrid

ARCHITECTURE EXPERIENCE

JUN 2022 - APR 2023

United Nations Office, Geneva, Switzerland

BIM Expert Consultant

Key experience: BIM implementation at the United Nations. This includes developing a BIM strategy for future internal projects and implementing CMMS for the maintenance of existing buildings.

AUG 2019 - JUN 2022

ColladoCollins Architects, London

ARB Lead Design Architect

Key experience: major residential mixed-use schemes and new later living residential building design process and technical development (BIM - Revit).

JAN 2022 – JUN 2022

Royal Tunbridge Wells, mixed use and elderly residential scheme – £63.085m 22,700 m2

Concept and design development / RIBA

Workstage: 2-3

NOV 2020 – JAN 2022

The Sylvans, 53 Dwellings - Later living residential building, Sevenoaks, Kent –6,750 m2

Technical development / RIBA

Workstage: 3-4

JUN 2020 – NOV 2020

Access Homes. Residential, Offices & Storage, London –27,000 m2 Design / RIBA Workstage: 2-3

JAN 2020 – JUN 2020

Shootersway. 103 Dwellings, Berkhamsted, Hertfordshire – 15,733 m2 Design / RIBA Workstage: 1-3

JAN 2017- JUN 2019

ESTUDIO ALVAREZ SALA, Madrid

Architect Designer

Key experience: complete new residential building design process with varied work methodology (AutoCad and Revit).

FEB 2017- JUN 2019

122 Dwellings incorporating mixed

NURIA MERCADÉ

use at ground floor and city planning modification, Barcelona

Strategic definition– construction

OCT 2018 – JUN 2019

85 Dwellings Building, Madrid

Design stage.

MAR 2019

Private Residential Building

Contest, Madrid

NOV 2018 – DIC 2018

TABIT building, 91 Dwellings

Residential Building, Madrid

Technical design

JUL 2017- JAN 2018

AURA Homes, 254 Dwellings

Residential Building, Madrid

Developed design – technical design

JAN 2017- FEB 2017

Office Building Refurbisment, Madrid

Technical design

SEP 2018-JUL 2019 INDEPENDENT ARCHITECT

Complete House Refurbishing, Madrid – 317 m2

AWARDS, EXHIBITIONS & PUBLICATIONS

2015

Community of Madrid Excellence Award

2013

Community of Madrid Excellence Award

DEC 2012

Collective Exhibition: “1912.DIA.D –UD Campo Baeza”

2010

Collective Exhibition: “Materia y Espacio ”experimental workshop, commissioned by Ignacio Vicens

2012

Freehand Drawing Publication: “255.255.255 daetsam” Magazine

LANGUAGES

Spanish - Mother tongue

English - Professional C1

French - Intermediate B1 (currently studying)

BIM Architect ETSAM
3

FORMER ABC CINEMA SITE

162 DWELLINGS, RETAIL & CAR PARK - LATER LIVING SCHEME ROYAL TUNBRIDGE WELLS, KENT

Constructed Area: 22,700 m2

Cost: £63.085m

Client: Retirement Villages Group Ltd

Workstage: 2, Pre-Planning - REVIT & ScketchUp

The site sits in the geographic centre of Tunbridge Wells at the crossroads between Mount Pleasant Road which runs north-south linking the historic Pantiles with more recent development, and Church Road / Crescent Road running east-west between Calverley Park and Tunbridge Wells Common. The main Civic centre of the town, an impressive NeoGeorgian building constructed in 1934, the same year the Ritz Cinema opened, sits diagonally opposite the site framing an important open space which currently lacks enclosure due to the absence of any building on the site.

The various elements of the building face a rich mix of architectural styles reflecting the long and varied history of the development of Tunbridge Wells, from the stuccoed Regency style so prevalent in the residential and historic quarters, through the neo-Gothic follies, the ArtDeco influence of the Civic Centre, and even the Brutalist style of the Axa offices there is a rich mix to respond to.

detail 1 detail 2 det. 1 det. 2
4 LATER-LIVING MIXED-USE BUILDING TUNBRIDGE
WELLS

The proposals are for a mixed-use scheme promoting active frontages along Mount Pleasant Road and Church Road to reintegrate the site into the town and bolster the link between the north and south retail areas. Retail uses facing Mount Pleasant Road for small local retailers are proposed, with a mix of catering and wellbeing uses further up the hill and within the public courtyard. Above these, residential apartments are proposed, with each dwelling provided with a private terrace or balcony.

The public realm serves as the key interface between the functions, weaving the development into the town and providing access to the amenity functions and the residential uses. The footpath traversing the site through the courtyard connects Mount Pleasant Road with the Clandircarde Estate and the GP surgery which serves an important local function.

Residential C2 Retail accomodation Public Realm Cafe bar / bistro / restaurant
Parking / Store Plant and Servicing Water Feature Element Public Open Space Public Open Space
Residential C2/C3
Amenities
5 LATER-LIVING MIXED-USE BUILDING TUNBRIDGE WELLS

THE SYLVANS 53 DWELLINGS - LATER LIVING RESIDENTIAL BUILDING SEVENOAKS, KENT

Constructed Area: 6,750 m2

Client: ELYSIAN RESIDENCES

Workstage: 3, Planning - REVIT

The Sylvans site forms part of the wider Wildernesse House redevelopment.

The redevelopment masterplan includes the Grade II listed Wildernesse House conversion into apartments for older people with communal facilities as well as eight Mews Houses, parking and associated landscaping.

The proposed works involve the construction of five buildings comprising 53 units of extra care accommodation for older people (sui generis use).

The spatial character of the Wildernesse Estate has informed the number and distribution of blocks in this part of the site. A mix of stepped two and three storey blocks are proposed relating to the site topography and being lower next to the southern boundary and existing houses.

The spaces between the blocks are intended to be informal in character with a woodland feel. Paths will get more formal as they are nearer the house.

1 2 3 4 5 B1_Level 0U B1_Level 1U FFL 111.200 m B1_Level 2U FFL 117.123 m B1_Level RU FFL 109.700 m B1_Level 2L FFL 106.700 m B1_Level 1L FFL 103.700 m B1_Level 0L FFL 115.314 m B1_Level RL 1 4 4 9 8 10 3 2 7 1.1 1.2 1.3 1.4 1.5 1.6 1.7 MATERIALS KEY 1. FACING BRICK 2. PROJECTING BRICK PATTERNING 01 3. PROJECTING BRICK PATTERNING 02 4. PROJECTING HEADER BRICK FRAMING HIGHLIGHT 5. BRICK-ON-EDGE COPING 6. ROOF CLAY TILES 7. ZINC CLADDING 8. GRC COPING 9. PPC METAL WINDOWS/DOORSCOLOUR TBC 10. PPC METAL BALUSTRADES COLOUR TBC 11. PPC METAL EXPOSED GUTTER COLOUR TBC 12. PPC METAL RWPs -COLOUR TBC Block 01 Block 02 Block 04 B1_Level 0U B1_Level 1U B1_Level 2U FFL 117.123 m B1_Level RU FFL 109.700 m B1_Level 2L FFL 106.700 m B1_Level 1L FFL 103.700 m B1_Level 0L FFL 115.314 m B1_Level RL 1 11 12 8 9 10 2 1.1 1.2 1.3 1.4 1.5 1.6 1.7 ColladoCollins Architects -Refer to highways consultant's drawings for details -Landscaping layout is indicative only -Refer to area schedule Project: Checked by: DateByAuth © Copyright Reserved. ColladoCollins Architects Ltd 17-19 Foley Street T 020 7580 3490 www.colladocollins.com STAGE 3 VISUAL SCALE 1:100 @ A1 10m 2m 8m 6m 4m 0m P7 22.01.21 NM CB Wildernesse House, Sevenoaks Block 1 - Proposed Elevations 2 Elysian Residences The Sylvans, Sevenoaks SYL-CCA-B1-ZZ-DR-A-20.302 1 100 Block 1 -East Elevation 1 1 P1First issue 22-01-21CBNM P4Coordination issue 16-04-21DHNM P7Stage issue 01-07-21NMASE 1 : 100 Block 1 -West Elevation 2 2
6 LATER-LIVING RESIDENTIAL BUILDING THE SYLVANS
7 1WP 100Ø 100Ø W00Ø RWP 100Ø RWP 100Ø RWP 100Ø WP0Ø 100Ø RWP 100Ø RWP 100Ø RWP 150Ø MVHR WM RWP 150Ø B/O/M F/F B/O/M F/F WM WM WM MVHR B/O/M F/F B/O/M F/F 100Ø 100Ø 105 20 105 20 104 103 70 105 15 103 60 105 10 105 20 105 10 105 20 103 70 103 65 103 70 103 65 105 15 105 15 105 15 105 05 106 15 102 84 103 89 104 20 103 72 103 76 104 55 103 88 104 52 103 60 TOW + 103 70 TOW + 103 70 103 60 TOW + 103 70 103 70 103 70 103 70 103 70 103 90 103 60 103 70 104 23 TOW + 103 70 TOW + 103 70 TOW + 103 70 103 60 103 60 103 70 103 70 103 60 103 60 TOW + 103 70 103 64 103 70 103 64 103 70 103 64 103 70 TOW + 105 20 105 15 105 20 105 20 TOW + 105 20 105 20 105 20 105 20 105 15 TOW + 106 25 TOW TOW + 106 25 106 15 105 20 106 30 106 50 105 20 106 25 105 20 105 15 105 20 105 15 105 05 105 10 105 15 105 10 105 05 105 10 105 15 105 15 105 10 TOW + 105 15 103 70 103 70 105 05 105 05 105 10 106 25 106 00 105 10 105 10 105 20 102 95 TOW + 103 70 103 60 103 70 103 25 103 14 105 90 105 20 105 10 105 20 105 00 105 00 104 6 104 55 103 99 2 2 2 1 1 9 2 0 1 8 1 7 1 6 2 3 2B4P Block 1 101 3B6P Block 1 104 2B4P Block 1 103 2B4P Block 1 102 AOV inlet Bin Store MAIN ENTRANCE Postboxes 103.70 m 105.20 m 1.A 1.B 1.C 1.D 1.E 1.F 1.G 1.H 1.I 1.J 1.K 1.1 1.2 1.3 1.4 1.5 1.6 1.7-B10LW100UW19 B10UW18 B10UW17 B10UW13-B10UW10----B1-0U-W02 B1-0U-W03 -B1-0U-W06 -------B1-0L-W02 ---B1-0L-W06 -Block 01 Block 02 Block 03 Block 04 Block 05 ColladoCollins Architects N CONSULTANTS -Refer to highways consultant's drawings for details -Refer to landscape consultant's drawings for details -Landscaping layout is indicative only AREAS -Refer to area schedule NOTES Scale @ A1: Drawn By: Checked by: RevNotes DateByAuth 17-19 Foley Street T 020 7580 3490 info@colladocollins.com F 020 7580 2917 London W1W 6DW Scale @ A3: VISUAL SCALE 1:100 @ A1 10m 2m 8m 6m 4m 0m As indicated 22.01.21 NM CB P1First issue 22-01-21CBNM P3Coordination issue 01-04-21DHNM P4Coordination issue 16-04-21DHNM P5Shell & Core issue 11-05-21NMASE P6S73 Planning Submission 01-06-21NMASE P7Stage 3 issue T1Coordination issue 21-07-21ASE LATER-LIVING RESIDENTIAL BUILDING THE SYLVANS

THE SYLVANS 53 DWELLINGS - LATER LIVING RESIDENTIAL BUILDING SEVENOAKS, KENT

Constructed Area: 6,750 m2

Client: ELYSIAN RESIDENCES

Workstage: 4, Technical design - REVIT

INTERNAL LAYOUTS:

As the project coordinator team, we received from the interior architects the design intent concept and we were responsible of developing it further on. This included creating construction drawing packages for finishes, RCP, fittings (kitchens, bathrooms and built-in wardrobes) and specification documents (sanitaryware, appliances and finishes)

SHELL AND CORE:

Development in detail of the façade, external walls, internal walls, roof joints, windows and doors schedule, among others.

We worked hand by hand with different consultants to develope the design of lobby areas, open staircases and cores. The preparation of detail studies included construction drawings, sections and technical details.

8
LATER-LIVING RESIDENTIAL BUILDING THE SYLVANS
9 LATER-LIVING RESIDENTIAL BUILDING THE SYLVANS

THE SYLVANS

53 DWELLINGS - LATER LIVING RESIDENTIAL BUILDING SEVENOAKS, KENT

Constructed Area: 6,750 m2

Client: ELYSIAN RESIDENCES

Workstage: 4, Technical design - REVIT

10 LATER-LIVING RESIDENTIAL BUILDING THE
SYLVANS
11 LATER-LIVING RESIDENTIAL BUILDING THE SYLVANS

ACCESS HOMES RESIDENTIAL, OFFICES & STORAGE MENDIP RD, LONDON

Constructed Area: 27,000 m2

Client: ACCESS SELF STORAGE

Workstage: 1 to 3 - REVIT + SketchUp

The site, is situated in Battersea, an area located within the London Borough of Wandsworth in south west London. The borough of Wandsworth forms part of inner London and is located to the south of the River Thames, 2.9 miles south west of Charing Cross.

The building would be 8 storeys and 10 storeys facing York Road and 8 storeys and 13 storeys fronting Mendip Road. It would feature a 2 storey basement and a single storey podium.

The mixed-use scheme comprises: 131 Build to rent dwellings, 193 Sharedliving dwellings, 7,858m² Storage space, Flexible office space, 187m² Cafe.

Building heights are varied to respond to the surrounding urban context and the need to retain daylight/sunlight to

neighbouring residents. This height distinction allows for a prominent corner building on York/Mendip Road and a taller element facing the river maximising the river views.

The chosen materials respond to local architecture. This is predominantly brick and render with GRC and metal finishes proposed in emerging developments. The use of brick is extended to the majority of the scheme with a colour change to reflect the change in internal use between the Co-living and build to rent. The four volumes are split into two by changing the brick colour, although to retain the legibility of four buildings the detailing between the facades differs.

12 MIXED-USE BUILDING MENDIP RD
THAMES PATH YORK ROAD SITE MENDIP COURT CHALMER HOUSE GREAT CHART STREET CHILLINGTON DR WEALD HOUSE Battersea Reach 56 Chatfield Rd Under construction RIVER THAMES FFL 0.000 m Level 0 FFL 6.075 m Level 1 FFL 9.225 m Level 2 FFL 12.375 m Level 3 FFL 15.525 m Level 4 FFL 18.675 m Level 5 FFL 21.825 m Level 6 FFL 24.975 m Level 7 FFL 28.275 m Level 8 FFL 31.875 m Level 9 tower FFL 35.025 m Level 10 tower FFL 38.175 m Level 11 FFL 41.325 m Level 12 FFL 44.475 m Roof Plan FFL 31.425 m Level 9 FFL 34.575 m Level 10 56 Chatfield Rd Under construction YORK ROAD Architects drawings for details drawings for details linked from a should not be used buildings ColladoCollins Architects Ltd PLANNING VISUAL SCALE 1:200 @ A1 0m 15020 ProposedPrecis Advisory/Access Mendip Road 1 : 500 Mendip Road context elevation as proposed 1 1 : 200 Mendip elevation as proposed 2 57 m², 610 ft² Amenity 25 m², 270 ft² Co-living unit 25 25 m², 270 ft² Co-living unit 25 29 m², 310 ft² Co-living unit 30 wch 20 m², 220 ft² Co-living unit 20 25 m², 270 ft² Co-living unit 25 20 m², 220 ft² Co-living unit 20 21 m², 230 ft² Co-living unit 20 25 m², 270 ft² Co-living unit 25 71 m², 760 ft² 51 m², 550 ft² 1B2P 54 m², 580 ft² BtR Amenity 54 m², 580 ft² 1B2P 51 m², 550 ft² 53 m², 570 ft² 1B2P 58 m², 620 ft² 21 m², 230 ft² Co-living unit 20 30 m², 330 ft² Co-living unit 30 25 m², 270 ft² Co-living unit 25 13 MIXED-USE BUILDING MENDIP RD

SHOOTERSWAY 103 DWELLINGS, C2 EXTRA CARE BERKHAMSTED, HERTFORDSHIRE

Constructed Area: 15,733 m2

Client: ELYSIAN RESIDENCES

Workstage: 1 to 3 - REVIT + SketchUp

14 LATER-LIVING RESIDENTIAL BUILDING BERKHAMSTED

The proposal is to create a C2 Extra Care development with integrated amenities and care provision comprising 103 dwellings, with 75 parking spaces for residents, staff, and visitors.

The concept for the development as two groupings of three interlinked pavilions are reinforced by the materials selected for each volume. In each grouping the central volume contains the main circulation core and in the case of the western grouping (Block A) the central volume contains the main entrance to the development. The peripheral volumes are linked via glazed circulation spaces, and are subservient to the main central piece.

The use of different materials between the central linking volume and the peripheral buildings establishes a hierarchy of form and colour which reflects the internal arrangement. This breaks down the visual impact of the volume and simultaneously creates a diverse development for residents, integrating the colours of nature into the building - green elements to complement the verdant site and surroundings, and black elements to contrast with and highlight the green.

m R S 113xmRmfeVeuhe i lciwe t SRh Dac m e cl DRmuorcaVsuhe i lc e 113 ft² Sunken Courtyard 75 Parking spaces Sunken Courtyard Void Commercial Bin Store Valet Parking Lobby Staff Reception Drop off No color scheme assigned to view 01 A 2B 03 2B 04 2B XL 1080 ft² 01 A 01 A 06 B 2B XL 07 2B XL 757 ft² 16 99 m² 2B L 86 m² 2B 02 08 1B M 03 2B S 1:11 5 0 900750 ColladoCollins Architects N -Do not scale from this drawing -This document is for information only and is subject to a preliminary risk analysis to be carried out by all AREAS NOTES Scale @ A1: By 17-19 Foley Street info@colladocollins.com www.colladocollins.com 020 7580 2917 Scale @ A3: PRELIMINARY Any decisions to be made on the basis of this drawing, whether as to project viability, pre-letting, lease -Design development -Accurate surveys -Accurate boundary/site ownership documentation -Construction methods and building tolerances -Local Authority/Statutory consents NOTES VISUAL SCALE 1:250 @ A1 25m 5m 20m 15m 10m 0m 1 250 7 04/11/19 Author Checker 18067 SK1-100 Upper Ground Floor Plan Elysian Shootersway, Berkhamsted Terrace over loading area 1Issued for Comment 19-04-30SMDH 2Issued for Information 19-05-22SMDH 7Plant and riser spaces added WM B Living / Dining / Kitchen  ‐42sqm Living / Dining / Kitchen Hall Ensuite Bedroom 1 Bedroom 2 Service Cupboard Bathroom Living / Dining / Kitchen Hall Bedroom 1 Bedroom 2 Service Cupboard Bathroom ‐Refer to highways consultant's drawings for details ‐Refer to landscape consultant's drawings for details ‐Landscaping layout is indicative only NOTES By © Copyright Reserved. ColladoCollins Partners LLP VISUAL SCALE 1:100  @ A1 10m 2m 8m 6m 4m 0m Typical 2bed Large A Typical 2bed Small Typical 2bed Medium WM Hall Services Cupbd Living / Dining / Kitchen  ‐42sqm Bathroom Bedroom 1 ‐17sqm Ensuite Bedroom 2 ‐15sqm Living / Dining / Kitchen Hall Ensuite Bedroom 1 Bedroom 2 Service Cupboard Bathroom Living / Dining / Kitchen Hall Ensuite Bedroom 1 Bedroom 2 Service Cupboard Bathroom ColladoCollins Architects CONSULTANTS ‐Refer to highways consultant's drawings for details ‐Refer to landscape consultant's drawings for details ‐Landscaping layout is indicative only AREAS NOTES Scale @ A1: Drawn By: Auth © Copyright Reserved. ColladoCollins Partners LLP 17‐19 Foley Street info@colladocollins.com F         020 7580 2917 Scale @ A3: PLANNING VISUAL SCALE 1:100  @ A1 10m 2m 8m 6m 4m 0m 1 : 50 06/18/14 DH 18067 P4‐103 Typical Flat Types ‐ 2 Bed Elysian Shootersway, Berkhamsted Typical 2bed Large A Typical 2bed Small Typical 2bed Medium
15 LATER-LIVING RESIDENTIAL BUILDING BERKHAMSTED

AURA HOMES 254 DWELLINGS - RESIDENTIAL BUILDING ALCOBENDAS, MADRID

Constructed Area: 53,518 m2

Cost: € 37.8m

Client: NEINOR HOMES

Workstage: 2 to 4 - REVIT

The complex of Espino del Cuquillo comprises 254 homes, 254 storage rooms and 475 parking spaces. It is completed with large garden areas and three community pools.

The plot in which the building is located has a very irregular perimeter that mixes straight and curved boundaries.

For this reason, the building dissociates itself from the official alignments and follows its own geometry, through gentle curvatures that also adapt to the topography. Two bands of houses with double orientation are projected. Living rooms, main bedrooms and terraces face the exterior and the secondary bedrooms face an inner street conveniently landscaped.

16 RESIDENTIAL BUILDING AURA HOMES

The communication core and halls are located in this intermediate street. Each core serves 2 or 4 homes in every floor. The parking and the storage rooms are located in two basements under the built area.

17 RESIDENTIAL BUILDING AURA HOMES

PARADIS DEL MAR 122 DWELLINGS, MIXED-USE BUILDING MONTGAT, BARCELONA

Constructed Area: 13,466 m2

Cost: € 9.05m

Client: CONSTRUREAL

Workstage: 1 to 5 - AUTOCAD

18 RESIDENTIAL BUILDING PARADIS DEL MAR

The complex of Paradis del Mar is located in a restructuring area where industrial use is being substituted by housing.

As part of an industrial urban structure, there was a lack of green areas. For this reason, the first and fundamental intervention is made at an urbanistic scale. The Area’s Urbanistic Rules have been modified to include a new green public area.

After this action, the building is configured as a one L shaped block and it is located in the north edges, leaving the south

orientation to this new green area. This organization allows the building and gardens to have a better solar utilization. As a mixed-use building, in the lower floor we will find commercial locals. These spaces work as connectors between the existing street and the new public space. Concerning the dwelling, there is a huge typology variety as there are both public and private ones. Not segregating public and private housing allows a higher dynamism, flexibility and exclusive apartments.

19 RESIDENTIAL BUILDING PARADIS DEL MAR

BRUSELAS 38 COMPLETE OFFICE REFURBISHMENT ALCOBENDAS, MADRID

Constructed Area: 14,000 m2

Cost: € 7,88m

Client: COLONIAL AXIARE

Workstage: 4 - AUTOCAD

This construction was a completely aged building crying out for a change on its appearance and distribution.

The first premise was to design the distribution that allows to optimize the space and provide more flexibility. Due to the privileged position next to the only green area of the urban sector, it is essential to create a constant contact with the exterior.

In the new floorplan, all vertical communications of the building and the common spaces are condensed in the central area, permitting a second ring circulation within the lucrative office space.

With the opening of a courtyard, the central space acquires presence inside the building, full of light and with the possibility of relating some plants with others, and therefore, their people. In this atrium a panoramic elevator was incorporated.

Consequently, the office distribution around the communication space increases permeability and establishes visual relationship from one side to another of the building.

The differentiation between office space and common space is also defined by the decision on the pavements.

20 OFFICE REFURBISHMENT BRUSELAS 38
21 OFFICE REFURBISHMENT BRUSELAS 38

CREIXEMENT + ORDRE PUBLIC RESIDENCIAL BUILDING CONTEST MONTGAT, BARCELONA

Constructed Area: 6,040m2

The dwellings that make up this project are distributed in one linear block that follows the longitudinal geometry of the plot.

The access to the residential complex on the ground floor takes place next to an existing green area in the neighborhood. The pavement treatment on the ground floor generates a continuity among the private garden and the public green area, which is considered as an extension of the parcel.

The dwellings distribution in each floor is flexible due to a structural modulation

which allows a complete adjustment to the residential needs.

When discussing about dwellings, connections between public space and the building communication are the most valuable quality. There is a visual relationship between the private and main space of the house, and the common space of the whole building. In between these two places, we can find the “winter garden”: a visually permeable space built as a greenhouse. This can be considered as both indoor and outdoor place and it acts as a semi-private space.

PUBLIC HOUSING CONTEST CREIXEMENT + ORDRE
22

TYPOLOGY 03

Structural modulation: A + B

Surface: 102,0 m2

TYPOLOGY 02

Structural modulation: A

Surface: 64,5 m2

TYPOLOGY 03

Structural modulation: B

Surface: 36,6 m2

PUBLIC HOUSING CONTEST CREIXEMENT + ORDRE 23

GOLF BALCONY PRIVATE RESIDENCIAL BUILDING CONTEST ARROYO FRESNO, MADRID

Constructed Area: 16,600 m2

Cost: €12,4m

HOUSING CONTEST GOLF BALCONY
24

The proposed buildings are 3 different volumes adapted to the regulatory constraints. There are two housing typologies: separate block and linear block next to a dividing wall.

Despite the differences of typologies, every dwelling is designed under the same concept: spacious living rooms with extraordinary terraces.

With regard to the separate blocks, every floor varies according to the height, creating staggered volumes. These variations are produced always in the living rooms and the fourth bedroom, which can be considered as part of the living room if necessary. Kitchen and bathrooms are located in the same position as a permanent element throughout the whole building.

Because of the inner limitations of the linear typology, which does not tolerate wide variations, the 2 dwellings for each landing entrance distribution remains the same. In all these dwellings, the living room position creates a “sequenced” space with natural light and ventilation and enjoys two orientations.

These strategies allow both typologies to have panoramic views.

HOUSING CONTEST GOLF BALCONY
25

ENTRE AS PEDRAS FOREST PAVILIONS O GROVE, GALICIA

Architectural design project

Mentor: Aranguren

ACADEMIC PROJECT
PROJECT
MASTER’S DEGREE
26

The Project is located in the O Grove peninsula (Arosa sea inlet), where there is lush vegetation and it will be able to visually connect to the sea and troughs. Therefore, the project separates itself from the original location and goes deep into the forest. There are two different camping programs: facilities and camping. The tents are the only refuge and each single piece around the forest is a specific part of the camping program. Every piece is surrounded by the vegetation, which is also an organizing element of the project.

The pieces are semi-buried so that there is a balance between the outside height of the building and the environment. These pieces bore the ground, integrate themselves into the environment, and incorporate the passage of time into their materials.

ACADEMIC PROJECT MASTER’S DEGREE PROJECT 27

ROBOTIC TOWER TOWER PARKING + POOLS MADRID

Construction development and Structure design project

Mentor: Jesus Anaya + Frechilla

ACADEMIC PROJECT CONSTRUCTION + STRUCTURE PROJECT
28

The new robotic parking tower is located next to the Santiago Bernabeu Stadium. It rises above the stadium providing a privileged view of the city.

On the ground floor, the car parking access is buried and placed close to the existing streets. This creates a new square for the city.

The building has two different functions: a large automated parking system and, on the top of the building, public facilities as swimming pools, café and entertainment.

Six metallic trusses define the building. This structure holds the floor framings of the public area located in the top of the building. Additionally, it supports the parking lot which hangs from steel wire ropes.

Moreover, different façade finishes are used according to the building use. In the parking area, a metal mesh covers up all the façade and allows ventilation. Meanwhile the upper part is constructed with sliding polycarbonate panels.

ACADEMIC PROJECT CONSTRUCTION + STRUCTURE PROJECT
29

CALI_26 NEW PUBLIC SPACE CALI, COLOMBIA

Architectural design 06

Mentor: Maroto + Izaskun Chinchilla

This urban intervention is located in Cali, Colombia. As of today, the Villanueva Prison creates a “hole” in the city. This new project tries to adress the issue of present disconnection in the city. The prison wall disappears allowing the pedestrian’s natural circulation to be restored.

New public space is created as an extension of current streets. Long retaining walls define the new streets. These walls have attached a light structure which holds the new public buildings.

ACADEMIC PROJECT ARCHITECTURE DESIGN
30

CLOUD ART FOUNDATION OPORTO, PORTUGAL

Architectural design 07

Mentor: Sancho

The analysis of Oporto’s population and the lack of city facilities generate the formal design of the Foundation. The building is mainly designed for cultural use. The project is formed of two different pieces: a “cloud” that alights over a concrete basement.

A temporary exhibition area is located in this ethereal new space, where the sights and opacities between inside and outside become essential.

ACADEMIC PROJECT CONSTRUCTION + STRUCTURE PROJECT 31

CERAMICS DESIGN

Since 2022, I have been a member of various ceramic studios, where I have been exploring different techniques, forms, and prototypes of functional and decorative objects. Through these experiences, I have deepened my understanding of ceramics and honed my skills in creating unique and visually captivating pieces. It has been a fulfilling journey of artistic exploration, and I am eager to continue pushing the boundaries of what can be achieved with clay.

CERAMICS STUDIO KLAYIT.CH
32
CERAMICS STUDIO KLAYIT.CH 33
PAINTING NOTEBOOK SKETCHES 34

Sonus Ipsum was founded during the Cultural Days celebrated in the School of Music in Pozuelo de Alarcon. They explore all new resources and sound innovations that appeared on the first twentieth-century avant-gardes. Once this workshop was concluded, Sonus Ipsum first performance included John Cage, H. Cowell, Kurtag and Ligeti pieces.

The group is composed by interpreters of different disciplines, which gives great

versatility to their live staging. Traditional acoustic instruments and electronic ones are combined. The main objective is to make surprising sound effects. Aside from the artists previously mentioned, their musical repertoire also includes works from Crumb, Jodlowski, R. Humet and Bruynel. They regularly perform their work in public.

MUSIC SONUS IPSUM
35

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Nuria Mercade PORTFOLIO 2023 by Nuria Mercadé Megias - Issuu