Skip to main content

Mivan Shuttering: An Advancement Technology in Construction

Page 1

Mivan Shuttering: An Advancement Technology in Construction Mivan shuttering is a construction process that helps to strengthen the building. In Mivan shuttering, mostly aluminium, formworks are used. With the growing demand for housing, real estate stakeholders are focusing on new construction techniques. Mivan technology is originated from European technology. The technology helps to reduce the construction time and enhance the lifespan of the building. How Widely Is It Used In India? Mivan technology is widely used in the European, Asian, and Gulf countries, but it has not gained immense popularity in India. It has been thought that Mivan shuttering is beneficial for huge construction for the Pradhan Mantri Awas Yojana. Since it is a cost-effective method of building construction work, it helps provide affordable houses for most underprivileged people. Families can rest assured of the quality and strength of the civil structure. Learn the Steps for the Mivan Shuttering Construction Here are few steps to consider for Mivan Shuttering Construction: Erecting Wall Using Steel Wire Rods Initially, the basic framework is erected using steel rods. It is essential to position the wire rod mesh and maintain the position until the concrete is poured. The location of the rod will be a determining factor for the structure’s performance. In this step, the detailers help spot the number of bars that need to be positioned and bent with other bars. The steel rods are secured tightly with other rods to avoid any dislodgment in the distant future. Fastening the Aluminium Formwork After that, aluminium formworks are pointed out at the site. The aluminium formwork is pre-designed according to the room dimension, and after that, the floor and the wall need to be erected. The aluminium formworks are fixed with other formworks through the help of a pin or wedge system. Concrete Pouring


After the aluminium formworks are finished casting, next the high-quality concrete is poured. For big projects, a concrete slurry pump may be purchased to cast the concrete effectively. If you want to ensure the compactness of the concrete, you can use vibrators while pouring the concrete. When the concrete becomes compact, it will expel out any air pockets in the concrete structure. The shuttering is dismantled after the concrete is cured for the requisite period. The Mivan shuttering can be used again if it is executed perfectly. It can be used about 200 times which reduces the burden of buying material for each construction process. Advantages & Disadvantages of Mivan Shuttering ● ● ● ● ● ●

The time taken for construction is reduced Minimizes the requirement of skilled labour Minimizes leakage due to less no of joints Requires less maintenance The walls and floor slabs have a smooth finish It provides uniformity.

Final Words Nova Formworks is a reputed company in India providing shuttering systems to construction units. The company has been operating its business for the past nine years. The plastic formwork system helps to decrease the construction time enhances the efficiency of the work. Their products are exported globally. They are committed to delivering new quality products to their customers. You can contact them over the phone for any queries you may have in your mind.


Turn static files into dynamic content formats.

Create a flipbook
Mivan Shuttering: An Advancement Technology in Construction by Nova FormWorks - Issuu