All About MIVAN aluminium Formwork or MIVAN Shuttering Being a mould for structures, formwork uses fresh concrete for hardening it. Although timber happens to be a common formwork material, the only disadvantage is it warps, shrinks, and swells. To overcome such an issue, the significance of MIVAN Formwork came under the limelight. And in this post, you are going to get an insight into MIVAN aluminium Formwork or MIVAN shuttering. Facts & Facets to Learn about MIVAN Aluminium Shuttering MIVAN is the aluminium shuttering, aka, MIVAN Shuttering. Initially, the European construction company developed it. In the year 1990, the company from Malaysia started producing formwork systems. In the current construction industry, over 30,000sqm formworks from this company get used around the world. MIVAN formwork already has given proofs to be economical and satisfactory for the construction environment. MIVAN technology serves its purpose for the construction of a larger number of constructional works like houses. It does its job in a very short span of time. What it does is use the room size forms to the construct walls & slabs in a constant pour on the concrete. Aluminium shattering is cost-effective for repetitive layouts and other plinth works. The system is unique as the components in buildings like walls, slabs, beams, balconies and window hoods are made concrete. There is no need for brickworks or block works. The MIVAN Formwork comprises different components. These components include beam components, wall components, and deck components. MIVAN aluminium formwork has a modular nature and the system allows seamless assembling & easy removal of the formwork. This construction can even proceed speedily with little deviation in any dimensional tolerance. The system happens to be flexible and can easily get adapted for variations in any layout. Process of MIVAN Construction This construction process is similar to that of the traditional formwork type. Let’s read on to know further: 1. Setting Wall Reinforcing Steel: The first step includes the wall reinforcing steel to get used for the structure of the building. The steel supports the concrete till until it gets 50% designed strength. 2. Placing the Formwork: MIVAN formwork is the ready-made one formwork. It gets designed & manufactured in the factory as per any required size of columns, slabs, beams, and other building elements. Formwork can get easily dismantled from structures once its job gets over. 3. Pouring concrete: The last step is to pour the concrete into the formwork to create a shape. Nova Formworks can offer a wide range of services in this direction. You can contact our professionals for any query related to MIVAN Aluminium Formwork.