NIGERIA’S MOST INFORMATIVE NEWSPAPER NO 16,306
MONDAY, 17 AUGUST, 2015
www.tribuneonlineng.com
Ooni: 6 candidates intensify moves —P6
Nigerian Tribune
How PDP can bounce back —IBB
@nigeriantribune
Nigerian Tribune
N150
Shekau in audio message says, 'I'm still in charge'
—P21
—P6
APC, PDP at each other's throats
•Looting of treasury under Jonathan stalling Buhari's performance —APC •Violation of constitutional provisions under Buhari undermining democracy —PDP •Alleged diversion of $1bn Lagos-Kano rail loan untrue —Okonjo-Iweala —P2,4 •NDDC faults AGF over missing N183bn APC'S ALLEGATIONS PDP'S ALLEGATIONS OKONJO-IWEALA REACTS 3.8 trillion out of the 8.1 trillion earned from crude oil ( 01 to 01 ) withheld by PC .1 billion from Excess Crude Account unaccounted for billion allegedly looted by some ministers of the last administration 1 0 million barrels of crude worth 13.9 billion lost between 009 and 01 1 million from botched arms deal yet to be returned to igeria 30 billion rice waiver 183 billion unaccounted for at the C
Indonesian plane with 54 on board crashes, all feared dead
—P48
uhari deliberately stalling activities at I EC, as 11 states now without RECs. o provision for acting chairmanship of I EC in igeria s constitution. uhari using SS to unduly interfere in activities of election tribunals in Rivers, Akwa Ibom and other P P states. The uhari-led administration has been running without statutory components of a full cabinet as prescribed by the constitution. APC has clear agenda to undermine critical institutions of democracy, intimidate igerians and pave way for dictatorship.
What Buhari asked me to do in NNPC —Kachikwu —P13
ano-Lagos rail pro ect not funded by China-Exim ank China-Exim ank keeps and disburses funds for approved pro ects to contractors based on milestones; funds are not domiciled with Finance Ministry These are being funded from facilities obtained from the ChinaExim ank: 00m for the expansion of four International - 00m for the Abu a Light Rail pro ect - 98 m for the ungeru Hydroelectric power pro ect - 100m for the Galaxy ackbone pro ect
NDDC'S DEFENCE o money is missing AGF: Report premature, misleading, untrue Some of the claims do not hold water as at today. e no longer pay mobilisation for contract obs. Our contractorss are now expected to demonstrate their competence and capability before payments are made. e now insist on proper scoping for our obs as well as holding pre-award meetings to tie all loose ends.
Ibadan car dealer's death: Association, customs meet today —P6
The deceased and his wife