ARCHITECTURE PORTFOLIO
HUYNH THI Y NHI – Since 2015

HUYNH THI Y NHI – Since 2015
with demonstrated history of working in the
Architecture is my passion. I am trying every single day to hone my knowledge in this department. With strong Revit skills and a technical base but endless creativity, I would like to be a multi-task & activity architect. I am proud of my high responsibility in any kind of task assigned.
My career direction in the upcoming 5 years is to focus on improving more and more about project management skills. The successful operation of an architectural project depends on the capacity of the architect not only in design skills but also in professional management skills.
This Luxurious Residential project offers 2 towers of 70 floors separated into 7 acres of land. The main feature of this project is that 75% of the residences enjoy the views of The Botanical Garden. Due to its cruciform design scheme, around 50% of the apartments boat breathtaking dual–aspect views of both the Harbour and Botanical Garden.
This project is a concept of Make Architect. Atlas team took an important role in supporting them from concept design stage to construction stage. They gave theirs hand sketchs and we gave them the graphic drawing as they expected. I participated in the middle of period. My role was supporting team for apartment layout plant, remodelling and set out the drawings; modelling façade massing of podium…
1500 BEDS GENERAL HOSPITAL at Thu
Dau Mot City, Binh
Duong, Vietnam
SIZE AREA: 14.50 ha
NUMBER OF BED: 1500 beds
STOREY: 18 storeys
GFA: 167,705 sqm
. STATUS: UNDER CONSTRUCTION
My work scope was the last part of the project period –authorship. My role was to support replying RFI sent from the constructor to clarify all technical stuck issues in drawings.
SIZE AREA: 5.50 ha
NUMBER OF BED: 1000 beds
STOREY: 09 storeys
GFA: 114,544 sqm
STATUS: FINISHED
My scope of work was the lasted stage of the project – authorship. My role was to support replying RFI which were sent from the constructor to clarify all technical stuck issues in drawings and prepare additional detailed drawings that were required from the constructor.
PROJECT LOCATION:
46 LE VAN CHI STREET, LINH TRUNG
WARD, THU DUC DISTRICT, HO CHI
MINH CITY, VIETNAM
TECHNICAL DATA
SIZE AREA: 5.4 ha
NUMBER OF BED: 1000 beds
STOREY: 09 storeys
GFA: 133,064 sqm
STATUS: UNDER CONSTRUCTION
I had a chance to participate long-term in this project from the Basic design stage to Technical Design Stage also Landscape Concept Design.
PROJECT LOCATION:
BAC LIEU CITY, BAC LIEU
PROVINCE, VIETNAM
TECHNICAL DATA
SIZE AREA: 3.60 ha
NUMBER OF BED:
500 BEDS (STAGE 1&2)
STOREY: 10 storeys
GFA: 49,104 sqm
STATUS: UNDER TECHNICAL DESIGN
My scope of work was preparing drawing documentation to submit the basic design.
Coordinate with MEP, CS
STOREY: 05 storeys (including mezzanine level)
GFA: 215,302.90 sqm
From the Concept Design document, CPG team took under with Basic Design and Technical Design Documentations.
During the implementation process, many problems arise that need to be adjusted to match the technical requirements. Team CPG has worked together across disciplines to come up with reasonable and quickly solutions.
This project is being a part of “Airport essential facilities” under project Long Thanh airport construction. CPB was organized around three main areas, strategically allocated to facilitate traffic while optimizing the functionality of the building. The commercial area (including the transit hotel) is located at the center on the PTB main axis to ensure short and easy walking distance from the PTB to the CPB for passengers to access all the different services. On either side of this central axis, two interconnected parking building blocks at level 2(P1 to the east and P2 to the west) are located. These two building blocks are connected at three different levels to assure good vehicle circulation
My scope of work was modelling the building also setting up project template by using Revit architecture which was the fist step of Basic design documentation. In addition, we had to find solution of making for approach and exit traffic flow getting more smooth than initial concept.
TECHNICAL DATA
SIZE AREA: 6.8 ha
NUMBER OF BED: 300 beds
STOREY: 08 storeys
GFA: 96,000 sqm
I had a chance to participate in the Concept Design Stage of this project. Using Revit Architecture to do medical planning for the hospital.
TECHNICAL DATA
SIZE AREA: 3.5 ha
NUMBER OF BED: 130 beds
STOREY: 05 storeys + 18 villas 2 storeys
GFA: 26.777 sqm
I had a chance to participate in the Concept Design Stage of this project.
Collaborating with parties like Design Managers, MEP, and Subcons to exchange information on the project. This is a new form of Healthcare building. Vin Group would like to create a high-end class hospital dedicated to improving patients' quality of rest so as to faster recovery.
PROJECT LOCATION:
BINH CHANH
DISTRICT, HO CHI
MINH CITY, VIETNAM
TECHNICAL DATA
SIZE AREA: 6.74
HECTARES
NUMBER OF BED: N/A
STOREY: 10 STOREYS
GFA: 128,120 SQM
STATUS: UNDER TECHNICAL DESIGN
My scope of work: Participated in apart of Basic Design stage, Technical Design Stage and Interior Design.
Total Site Area: 8043.79 m2
No of Floors: 3 FL
Max. Building Height: 20m
Total Sales Gallery GFA: 4,500 m2 Gallery GFA: 2,500 m2
Office GFA: 2,000 m2
My scope of work: Participated in part of Basic Design, Fire Fighting Permission, Construction Permission, and Construction Design.
Developed Interior Detail Design
Document for the main lobby of Van Phuc Hospital.