Prefab City

Page 222

Moduli 225 Kristian Gullichsen and Pallasmaa | Finland | 1971 | Single-family residential Prefab Score

on-site/off-site ratio

18

use infrastructure

(-)

use residential

degree of prefabrication

(+)

69

15 permanent temporary custom standard

Methodology: A single module that can be added to, arranged in any combination, as family grows.

5

Units of Prefabrication: Single modules arrive ready to be attached to the space frame. All materials used for the house (except for wooden

Detail of joint assembly

posts) prefabricated.

4

Structure: No foundation required, modules supported by wooden posts and stout metal pylons, hovering slightly above the ground.

3

Delivery: No foundation required, assembly could take as little as two days. All materials available within 200 miles.

Module configurations

1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Prefab City by Northeastern School of Architecture - Issuu