Skip to main content

Prefab City

Page 186

Housing + Commercial Block Keim + Sill | Rathenow, Germany | 1997 | Housing + Commercial Prefab Score

use infrastructure

(-)

(+) degree of prefabrication

use residential

on-site/off-site ratio

80

permanent temporary custom standard

Methodology: Preassembled units were constructed with all mechanical systems and

Building Section

finishes in place and ready to be plugged into existing system Units of Prefabrication: Twelve 3.5m x 2.3m container units Structure: 4� concrete column and beam frame for units to plug into. Delivery: Units were shipped in one day on standard flatbed trucks. Units were craned into the structural frame on the second day.

Typical Unit Plan


Turn static files into dynamic content formats.

Create a flipbook
Prefab City by Northeastern School of Architecture - Issuu