PRELIMINARY – For Toro Distributor and Toro Company use only. Frame Assembly
100 to 110 ft--lb (136 to 149 N--m)
1
13 12
55 to 60 ft--lb (75 to 81 N--m)
11 9
2
14
4 5 55 to 60 ft--lb (75 to 81 N--m)
3
5
10
9
RIGHT
6
8
FRONT
7
9
9
Figure 24 1. 2. 3. 4. 5.
ROPS assembly Cap screw (4 used) RH side casting Lock nut (4 used) Flange head screw (8 used)
6. 7. 8. 9. 10.
LH side casting Step Step plate Washer head screw (9 used) Frame assembly
11. 12. 13. 14.
R--clamp (2 used) Manual tube Cap Plug
The Greensmaster TriFlex Hybrid frame assembly is illustrated in Figure 24. If the fasteners used to secure the front castings or ROPS assembly are loosened or removed, refer to Figure 24 for fastener tightening torque recommendations.
Chassis
Page 7 -- 28
Greensmaster 3320/3420