February 10, 2017 Neepawa Banner

Page 1

Friday, February 10, 2017 • Vol.28 No.16 • Neepawa, Manitoba

C

S

ourt eeds CDC Austenson Barley A high-yielding, 2-row variety with short strong straw, Austenson has improved disease resistance and plump kernels.

Plumas, MB courtseeds.ca

New Canola Product

Planning to Build?

• Maximum yield and harvest flexibility in one package • Exceptional yield potential • Very good standability • Excellent early growth

chris.kulbacki@plantpioneer.com 204-966-3245 or 204-476-6449

HOMES

Neepawa 204-476-2333 www.beaverhomesandcottages.ca

courtseeds@gmail.com

204 386-2354

Banner neepawa

Locally owned and operated

FREE

within coverage area

.com

CENSUS 2016:

Area populations rise, fall Page 2

Drawings for Neepawa’s new fire hall unveiled

PHOTO COURTESY OF THE TOWN OF NEEPAWA

Neepawa received its first look at the exterior design of the new fire hall on Tuesday, Feb. 7. The drawings were a collaborative effort between the Town of Neepawa, the Neepawa Fire Department and Calnitsky Associates Architects Inc., the Winnipeg firm selected to aid in the design process. By Eoin Devereux The Neepawa Banner Neepawa is one step closer to starting construction on its new fire hall. On Tuesday, Feb. 7, Town Council presented the completed drawings for the proposed 10,000-square-foot structure, which will be built on the former C.N. property, near Mill Street. The design work was a collaborative effort between the Town, members of the Neepawa Fire Department and Calnitsky Associates Architects Inc, a Winnipeg based company selected to come up with the design. Mayor Adrian de Groot said that it’s very satisfying to see momentum building around

this extremely important project. “This process started a long time ago, it’s been on the agenda for years and years. Now it’s starting to take shape and we’re seeing some physical evidence of all of that work and planning,” said de Groot. “Quite a bit of detail has gone into the design. Making sure that the new building isn’t all glitz. What’s most important is that it’s a functional building that’ll suit the needs of the community and the region.” Ed Calnitsky of Calnitsky Associates Architects Inc., noted that the style of the structure is contemporary. He added that Town officials made the process very easy as they knew what they required in the building and were able to assist greatly during in the development stage of the drawings.

Fire Chief Scott Gibson noted that one of the best features of the design is that it is adaptable. He feels this facility will be able to grow and evolve as the years progress. “What’s important about the design is that it not only suits the needs of the fire department now, but that it’ll be able to do so for years to come. As we, as a department evolve, so will the building, whether it’s additional space for equipment or the ability to upgrade the facility itself.” said Gibson. De Groot added to Gibson’s comment, noting that the balance between form and function was important to the planning process. In that sense, he feels that they’ve struck the perfect balance. Continued on Page 6


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.