Friday, November 1, 2024 • Vol.129 No. 14 • Neepawa, Manitoba
We have a bean for every farm
Check out our selection of NorthStar soybeans pNSC DauphinpNSC Arden pNSC HollandpNSC Winkler Early booking discounts end November 30th
CourtSeeds
Plumas, MB courtseeds@gmail.com courtseeds.ca 204-386-2354
DOWNTOWN Kelwood Open This Sunday, November 3rd & Sunday, November 17th
Call us at
204-967-2007
For reservations and menu options.
Regular hours: Friday & Saturday 9-2pm & 4-7 pm - Breakfast Till 2pm 1st & 3rd Sundays 12-2pm
neepawa
Banner & Press
Pioneer® brand soybeans are the #1 choice Canadian soybean growers.
• New Z-Series soybeans that offer superior yield potential and industry-leading agronomic performance. • The Enlist™ weed control system provides powerful herbicide solutions for hard-to-control and resistant weeds like kochia and volunteer canola. chris.kulbacki@plantpioneer.com 204-966-3245 or 204-476-6449
CHECK US OUT ON INSTAGRAM
Locally owned and operated
Inside this week Franklin, MB 204-212-5032
Gerald & Rosemary Parrott
thewarmwoodsman@gmail.com
Remembrance Day B section
We stock outdoor wood and wood pellet/biomass furnaces, replacement parts, ThermoPex underground piping, heat exchangers, installation parts and more.
New hospital may see first patient in 2026
By Casper Wehrhahn Neepawa Banner & Press A healthy attendance was seen on the evening of Oct. 24 for a presentation regarding an ongoing, long-term project in Neepawa. Prairie Mountain Health (PMH) representative Debbie Poole (regional lead) and LM Architectural’s Matthew Bowering (architect) were at the Roxy Theatre that evening from 5:00 p.m to 6:00 p.m., providing an update on the construction and planning surrounding the new ‘Neepawa Health Centre’. This hospital project was first announced on Dec. 10, 2021 and the location officially designated in 2022. Since then, construction at the nearly 40 acres on Neepawa’s east side, near Highway 16 and Broadway Street, has been ongoing. As of the Oct. 21, 2022 edition of the Neepawa Banner & Press, the completion of construction was targeted for 2025. Below are some of the many details from the Oct. 24, 2024 presentation and Q&A session. This summary focuses on new information, or details that may otherwise be of interest to our readers. •Facility acquisition– The handover of the facility is anticipated to occur in 2026, with the first patient being accepted in late 2026 or early 2027. After facility acquisition, there is an orientation and training plan which must be executed before the facility can open. This is currently expected to take three to six months, which is the reasoning for the late 2026 to early 2027 timeline. Continued on Page A9
We’re here to support your small business. Get started at stridecu.ca
PRAIRIE MOUNTAIN HEALTH AND LM ARCHITECTURAL PRESENTATION
Prairie Mountain Health and LM Architectural provided an update on the construction of the new Neepawa Health Centre (hospital) on Oct. 24. Pictured: A recent photo showing the progress made in this massive project’s construction. This photo was shared on the evening of the presentation. There is much yet to be done, but things are taking shape. Some features that stand out at a glance are the large windows for the atrium (seen toward the centre, facing the camera) and the round cement pad at the back right of the photo. That cement pad will serve as a landing pad for helicopters.