North Coast Journal 04-24-14 Edition

Page 6

PublIsheR

April 24, 2014 Volume XXV No. 17

North Coast Journal Inc. www.northcoastjournal.com ISSN 1099-7571 © Copyright 2014 CIRCULATION VERIFICATION C O U N C I L

The North Coast Journal is a weekly newspaper serving Humboldt County. Circulation: 21,000 copies distributed FREE at more than 350 locations. Mail subscriptions: $39 / 52 issues. Single back issues mailed / $2.50. Entire contents of the North Coast Journal are copyrighted. No article may be reprinted without publisher’s written permission. Printed on recycled paper with soy-based ink.

publisher Judy Hodgson judy@northcoastjournal.com news editor Thadeus Greenson thad@northcoastjournal.com arts & features editor Jennifer Fumiko Cahill jennifer@northcoastjournal.com staff writer/assistant editor Grant Scott-Goforth grant@northcoastjournal.com staff writer Heidi Walters heidi@northcoastjournal.com calendar editor Dev Richards calendar@northcoastjournal.com contributing writers John J. Bennett, Simona Carini, Barry Evans, William S. Kowinski, Jennifer Savage, Ken Weiderman, Jessica McGuinty, Genevieve Schmidt contributing photographer Bob Doran bob@northcoastjournal.com art director/production manager Holly Harvey holly@northcoastjournal.com graphic design/production Miles Eggleston, Carolyn Fernandez, Christian Pennington general manager Chuck Leishman chuck@northcoastjournal.com advertising manager Melissa Sanderson melissa@northcoastjournal.com advertising Mike Herring mike@northcoastjournal.com Shane Mizer shane@northcoastjournal.com Terrence McNally terrence@northcoastjournal.com marketing & promotions manager Drew Hyland office manager/bookkeeper Carmen England receptionist/classified assistant Michelle Wolff

MAIL/OFFICE:

310 F St., Eureka, CA 95501 PHONE: 707 442-1400 FAX: 707 442-1401

ncjournal@northcoastjournal.com press releases newsroom@northcoastjournal.com letters to the editor letters@northcoastjournal.com events/a&e calendar@northcoastjournal.com music thesetlist@northcoastjournal.com production ncjournal@northcoastjournal.com classified/workshops classified@northcoastjournal.com

Bay [T]rail Update No. 9 + CCT

I

have a new favorite book. Well, it’s not that new and it’s not a real book. I just discovered online the 170-page report called “Humboldt County Coastal Trail Implementation Strategy,” published in January 2011. It’s about the dream of being able to transport yourself, sans car, along the California Coastal Trail in Humboldt County on your way from Oregon to Mexico. (A riveting read. Great photos and maps.) Since 2007, I’ve been writing about a specific 6.5-mile strip of that journey, the Bay Trail — you know, the one that should run along the bay between two of our main population centers in Humboldt County, Arcata to the north and Eureka to the south? Seven years ago I wrote an outdoors column about an attempt by Fieldbrook neighbors to walk the rail line from Arcata to Eureka. We stupidly took along hand clippers for the vegetation overgrowing the tracks when we really needed weed-whackers and chainsaws. We had to give up twice from the Arcata side, so we jumped ahead to Bracut and worked our way south along the eucalyptus trees and into Eureka by Target. Our effort got some attention on the radio, and motorists driving by honked in support. It was a small victory. We’ve tried several more times to raise awareness, including a hike in 2011 with members of the Humboldt Trails Council. Then I started getting cranky and impatient. I wondered aloud (in this publisher’s column) why we — walkers, bicyclists, hikers, bird-watchers, families with strollers, people in wheelchairs — can’t have a trail on that publicly-owned railroad rightof-way while the North Coast Railroad Authority and its operator figure out how to bring train service back. We needed to stop fantasizing and start asking harder questions. Hundreds of other people were of a similar mind. I joined up with a few of them in early 2012 to form the Bay Trail Advocates and we made a plan. That year was consumed by hundreds of hours of meetings, lobbying individuals, groups, government agencies, business leaders and elected officials. We prepped for and attended all of those nine public hearings culminating in victory that December: The NCRA Board of Directors unanimously gave permission for the trail to be built under certain conditions. When the Bay Trail story is finally written, I will remember the efforts of many, but one guy in particu-

6 NORTH COAST JOURNAL • THURSDAY, APRIL 24, 2014 • northcoastjournal.com

lar — former NCRA Director Bill Kier, himself a trail nut and a very smart political strategist. Bill had been working for years on another should-bebuilt trail, along the old Annie & Mary railroad line from Arcata to Blue Lake. He set aside his own dream to help us plot and scheme how to wrangle that right-of-way vote from his fellow NCRA directors. Bill, with the help of former Supervisor Clif Clendenen, orchestrated those final three public hearings in Eureka that made it so obvious the NCRA board had to take action or the right-of-way would be lost into the bay forever. (The trail and a RECOMMENDED ALIGNMENTS maintained rail prism will help protect FOR THE CALIFORNIA COASTAL that stretch of Highway 101.) TRAIL THROUGH HUMBOLDT COUNTY. MAP COURTESY OF THE In 2013 the Bay Trail wagon was HUMBOLDT COUNTY COASTAL permanently hitched to the Caltrans TRAIL IMPLEMENTATION STRATEGY Highway 101 Improvement Project (2011) BY THE STATE COASTAL when the California Coastal CommisCONSERVANCY AND REDWOOD sion voted to approve the highway COMMUNITY ACTION AGENCY WITH MAPPING BY ALTA upgrade. PLANNING + DESIGN. Of course the Bay Trail is just one link in the California Coastal Trail, but it’s a critical link. Lately, there has been a flood of CCT/Humboldt news — all of it good. Last month, the California Transportation Commission awarded $2 million to the Bay Trail for design and permitting work from Bracut to Eureka. The commission also gave $800,000 to the Bay Trail section in Arcata for construction. A preliminary study is now complete on how best to cross Little River up north. (Currently bicyclists have to get on the freeway north of Clam Beach and off at Moonstone to reach Trinidad.) Finally, we are learning a lot more about the Eureka sections of the CCT, called the Eureka Waterfront Trail. Phase A will extend from the existing Hikshari’ Trail to Del Norte Street, and Phase B will extend from Del Norte Street mean that tourists with bicycles will be to C Street. Phase C will connect the existable to stay in Eureka, jump on their bikes ing Adorni Trail at Halvorsen Park to the some day and ride to Trinidad for lunch. (I existing Target Trail, then continue under recommend the open-faced oyster sandthe Highway 101 bridge at Eureka Slough to wich at Seascape.) Tydd Street near Myrtletown. Phase C will This Sunday, April 27, will be an opconnect with the Bay Trail South segment portunity to high-five progress so far on all near the Target Trail and Eureka Slough. trails throughout Humboldt, and the Bay This means Eureka will soon have a Trail in particular, as the Humboldt Trails contiguous trail, along the beautiful waCouncil puts on its Jammie Jog in Arcata. terfront, throughout the city limits — all See this week’s Calendar for details. l without street crossings. It will have the – Judy Hodgson only non-motorized trail crossing of Highhodgson@northcoastjournal.com way 101 (connecting to Tydd Street). It will


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.