Ridgway Place

Page 1

All structural engineering drawings are to be read with the specification and with all relevant architect's and service engineer's drawings and specifications.

Do not scale from any structural engineer's drawing. All dimensions are in millimetres and levels in metres.

All water and damp proofing works to be to architect's details. Where drawings show waterproof or damp proof membranes, they are simply intended to indicate their position in relation to the structure. The membranes have been designed, specified and detailed by the architect or the manufacturers and are to be installed as shown on their drawings.

All fire protection and finishes are to the architect's details unless specifically noted otherwise.

All floor separation details and acoustic isolation are to the architect's details.

All external works, landscaping, paving etc. are to the architect's details. Typically, all non-loadbearing partitions are omitted for clarity. Refer to the architect's drawings for details.

Abbreviations:-

CA-Contract Administrator

CJ-Construction Joint

crs-centres

EGL-Existing Ground Level

FFL-Finished Floor Level

max-maximum min-minimum

MC-Mass Concrete

MJ-Movement Joint

MS-Mild Steel

NTS-Not To Scale

PC-Precast Concrete

RC-Reinforced Concrete

SOP-Setting Out Point

SSL-Structural Slab Level

TOC-Top of concrete

TOS-Top of steel

TOW-Top of wall

typ-typical

UNO-Unless Noted Otherwise

u/s-underside

Ø -diameter

The contractor is to ensure that all construction products used have the appropriate CE accreditation, including marking and/or paperwork confirming the same.

Checking -The engineer's comments on sub-contractors drawings will centre on compliance with the design intent and exclude dimensional checks.

TEMPORARY WORKS:

The contractor is responsible for the design, installation and maintenance of all necessary temporary works to ensure the strength and stability of the building throughout the course of the works.

The contractor should confirm details of the person responsible for all temporary works design (called the 'temporary works designer coordinator') when returning the tender.

Full design details (drawings and calculations) are required for comment by the Engineer for all temporary support systems. Three copies of all details for comment are to be issued allowing ten working days for preparation of comments by the Engineer.

EXISTING STRUCTURE:

The existing structural information shown on these drawings is based on visual inspection of the building and upon limited opening up works. All details of the existing construction are subject to confirmation by the Contractor during the works on site. No materials are to be ordered until the relevant details and conditions are confirmed by the Contractor on site.

CONTRACTOR DESIGN:

The contractor is responsible for the design and installation of the following elements (edit for each specific project):

• All temporary works (see above)

• All steel connections (see section 7 STEEL notes)

• Engineered timber, timber connections and secondary timber elements

• RC drawings and bending schedules

• All cladding design, including design of masonry façades, and all fixings and framework required to connect the cladding back to the primary structure

• Masonry support steelwork, both vertically (e.g. shelf angles, lintels) and laterally (e.g. windposts) and the fixings back to primary structure

• Architectural metalwork including handrails, balustrades and their associated fixings

• All staircase design including all structure required to support stair off primary structural frame

• Secondary steelwork/general metalwork, including all framing supports / connections/fixing design into substrates for all nonstructural secondary items including the following:

* Access ladders / walkways

* Builders work / supports to services

* Lift equipment, guiderails, lifting hooks

* Cleaning cradles

* Ceilings

• Glazing design including all associated framework/fixings back to primary structure, including full height glazing, windows, roof lights and balustrades

• Non-load bearing walls partitions

• Louvre design and fixings back to the primary structure

All existing foundations and underground obstructions within the foundation areas are to be removed to avoid hardspots developing under the new works. Live services are to be identified, protected, redirected or terminated as required.

All foundation drawings to be read in conjunction with the Site Investigation Report No. SAS 22/35602-1 Issued by Site Analytical services ltd September 2022

SPREAD FOUNDATIONS:

Pad and strip footings are to be founded in London Clay

wIth an assumed bearing capacity of 220kN/m²

Where specified, heave protection to be 225mm thick heave deck (cordek

HX S Grade 9/13 or similar approved) + 50mm blidning on underside of the slab UNO

Concrete to be in accordance with the specification, BS 8500: Part 2 and BS EN 206.

Cover not exposed to ground water or weather (mm)

New loadbearing masonry walls are to be fully toothed and bonded into existing masonry. Edges of all new openings are to be made good using fully bonded new brickwork.

• waterproofing Basement Waterproofing

• Dewatering

Before starting the work the contractor is to check for any services that could be damaged by the underpinning work, and shall be responsible for ensuring that his operations do not in any way impair the safety or condition of the building, both before and during theexecution of the work. He should immediately inform the Engineer if he considers that more stringent procedures than those specified are necessary.

Underpinning is to be carried out in short sections of about 1.0m in length to the widths shown unless otherwise directed by the engineer, and to the satisfaction of the engineer and the Building Inspector. Projecting portions of the existing footings are to be carefully cut off where directed and the underside of the footings are tobe cleaned and hacked free of dirt, soil or loose materials before underpinning. The sides of the previous underpinning bays are to be dowelled and / or roughened keyed to thesatisfaction of the Engineer.

The mass concrete is to be stopped offnominally 75mm below the underside of the existing wall / footing, and the final pinning over the whole width of the wall / footing is to be carried out with 1:3 mix cement to sharp sand dry-pack mortar, well-rammed in 24 hours after the massconcrete has been poured. Excavation to any section of underpinning shall not be started until at least 48 hours after completion of any adjacent sections, and excavation and concreting of any section of underpinning should ideally be carried out on the same day.

Sequence of underpinning to be as shown, or typically 1, 3, 5, 2, 4, 1, 3….

All sections marked 1 to be excavated,cast and dry-packed before starting excavation of sections marked 2, etc. The Contractor is to keep a record of the sequence and dimensions of the underpinning actually completed, including details of excavation, casting concrete and pinning up for each section.

Excavated material intended for backfilling is to be kept protected from drying-out or wetting, and is to be placed in maximum 150mm layers, carefully compacted with a pneumatic or electric percussion tool with compacting plate.

4. Loading

IMPOSED LOADING:

For superimposed dead and live loading assumptions, please refer to loading plans. In general:

• Structural floors have been designed to allow for Superimposed Dead Loads based off the floor build ups as proposed by the architect as well as suitable contingency allowance at this design stage for any changes

• Structural floors have been designed to carry uniformly distributed imposed loads in accordance with BS EN 1991-1-1

WIND LOADING:

The global wind load used for the design of the stability system has been calculated using BS EN 1991-1-4.

The fundamental value of basic wind velocity (vb0) for the site is 21.5ms¯¹

The following factors from BS EN 1991-1-4 and the UK National Annex have been utilised in the generating the basic wind velocity (vb):

cdir = 1

cseason = 1

Cladding and roofing designers are to utilise BS EN 1991-1-4 to determine pressure coefficients and localised wind pressures for sheeting/glazing façade/masonry supports fixing to structure.

SNOW LOADING:

General snow loading has been included in roof design loadings UNO additional allowance should be made for heaping in accordance with BS EN 1991-1-3.

Cement Replacement 70% 70% 50%

All timber members are to be grade C16 to BS EN 338 unless noted otherwise. Timber to be pressure-impregnated with preservative and cut ends brush treated.

Concrete finishes to be as follows:

• All formed surfaces to be Ordinary to BS EN 13670 and in accordance with the National Structural Concrete Specification (NSCS) unless noted otherwise.

• All unformed surfaces to be Basic to BS EN 13670 and in accordance with the NSCS unless noted otherwise

Average reinforcement rate (Kg/m³)

Concrete Elements Weight/Volume

RC slab (Extension) 225Kg/m³

RC Slab (Main house) 125Kg/m³

Where new brickwork is to be stitched into existing, cut out brickwork, to the depth shown, where cracked and as indicated on the drawings or specified by the engineer. Stitch in new brickwork to match existing set in 1:1:6 mortar. New brickwork is to be toothed into the existing providing as many fully bonded stretchers as possible. Ensure that the new brickwork is completed such that all voids within the depth of the wall are filled completely with mortar.

Brickwork below and within 150mm of ground level to be laid in mortar using sulphate-resisting cement.

Where directed on site or indicated on the drawings, buried timber set in the thickness of brick walls is to be cut out and the resulting voids infilled with solid brickwork set in 1:1:6 mortar.

Pockets for padstones etc. in party walls to be formed by carefully removing stretchers and snapping off headers where required.

Joists marked DJ are to be doubled joists, TJ are to be triple joists, bolted together using M12 grade 8.8 bolts at 600mm centres along span. Joists to be doubled-up under all partition walls parallel with span, or with solid blocking under where perpendicular.

All bolts into timber are to have 50sq x 3 thick MS washers below nut.

Solid blocking or herringbone strutting is to be provided between all timber joists or rafters as follows:

• 2.5m to 4.5m span: midspan and at each end support

• Spans longer than 4.5m: two rows equally spaced in span and at end supports

• Outer joists or rafters to be blocked solidly to perimeter walls.

Wall plates for roofs are to be tied down using 1200 long 30 x 2.5 galvanized MS straps at 1200 crs with 100 bob end. Straps are to be nailed to the top plate and plugged and screwed to the internal face of the wall. Refer to typical details.

Holes less than 300mm square are generally not shown on structural drawings. Refer to services engineer's / sub-contractor's drawings. All holes including those not shown on structural drawings must be agreed with the engineer.

Holes in slabs which have been cast:

All builderswork proposals to be submitted to the structural engineer for checking prior to works commencing on site. Generally reinforcement and embedded structural steelwork will not be permitted to be cut, and holes greater than 300mm wide will generally not be allowed. Contractor to allow for scanning and exposing all areas in the vicinity of proposed builderswork to identify, locate, and avoid cutting reinforcement.

Contractor to assume all openings are to be cored/saw cut.

No builder's work openings are to be cut without first obtaining agreement to proceed from the CA.

Openings in beams and load bearing walls will generally not be allowed, unless approved by the engineer.

Infilling of openings around services to architect's or services engineer's requirements. Where a load bearing infill is required this is to be designed by the contractor. Details to be submitted to the CA for comment.

+No allowance has been made in the figures for project contingency which could be required to cover issues including:

-Possible (unknown) Client, Architect or Contractor change –e.g., requests for thinner or more slender elements, which will increase the reinforcement rates.

-Contractor requirements –additional reinforcement to suit temporary works proposals, strengthened ground floor slabs (construction access), top-down construction, cladding fixings etc.

+In particular, the following have not been included within the figures:

-Chairs and lacers.

-Couplers, threaded bars, and pull-out bars.

-Reinforcement for temporary works (such as construction plant and storage loads, top-down construction, temporary platforms, screens, hoists etc.) and safety requirements.

-Reinforcement for sub-contractor design elements.

-Site stock, including site wastage.

-Sequencing requirements.

-Contractor reinforcement placement preferences.

-Additional requirements for construction joints and temporary openings.

-Reinforcement for non-structural upstands, such as plinths.

+ Allow an additional 8 kg/m rebar around door openings and trimming voids.

+ Weight of laps has been approximated within reinforcement allowances based on 9 m stock length for slabs and 6 m stock length for walls. Columns assume bar laps at each floor.

+The estimates are based on loads as per the loading plans.

+Variable load reductions have been used in the load factors in accordance with BS EN 1990-1.

+All reinforced concrete is in-situ.

+All slabs are designed on an assumed strike time of 14 days; no construction loading in the first 2 weeks after striking. Any changes to the assumed contract will impact the long term deflections and reinforcement estimates.

+The basement raft foundation and contiguous pile capping beam rates are an estimate awaiting final geotechnical consultant and piling contractor input.

All loadbearing blockwork is to have a minimum characteristic strength of 7.0N/mm2. All loadbearing brickwork is to have a minimum characteristic strength of 20N/mm2.

Refer to the architect's drawings and specification for setting out of masonry, mortar types, coursing and bonding requirements and jointing details.

Lintels, unless noted otherwise, to internal walls and internal skins to be:

• Up to 1500 span: 100 deep prestressed lintel.

• 1501 to 2500 span: 140 deep prestressed lintel.

• 2501 to 3500 span: 215 deep prestressed lintel.

Lintels to be typically 100 wide with multiple lintels supplied to suit width of wall. All lintels to have minimum 150mm bearing at supports, unless noted otherwise. Lintels to be supplied by Supreme or a similar approved manufacturer.

All new non-loadbearing masonry walls are to be fixed to adjoining new or existing masonry using ‘Furfix’wall starters or similar approved. Head restraint to be provided by sleeved ties or galvanised MS angles fixed to the soffit.

All steelwork to be grade S355 UNO to BS EN 10025-2 and in accordance with the current edition of the National Structural Steelwork Specification (NSSS) CE Marking Version and structural engineer's specification and BS EN 1993. All Open sections and plates are to be to BS EN 10025-1. All Hollow sections (RHS SHS CHS / OHS) are to be “Celsius 355”sections by TATA or equivalently graded to BS EN 10210-1.

EXC2 uno

The Execution Class of the Steel Structure is Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

The steelwork fabricator shall produce and submit two copies of dimensioned fabrication drawings to the engineer. The engineer requires ten working days to comment. The engineer's comments on drawings will centre on compliance with the design intent and exclude dimensional checks.

The fabricator is to complete the design, drawings and calculations of all connections, using design connection forces given by the engineer. All steelwork connections to existing or new, steel or concrete are to be contractor designed.

All bolted connections are to include a minimum of 2No M16 bolts per member unless specifically indicated otherwise

All bolts are to be grade 8.8 sheradized to BS 7371-8, class 30. All bolts, nuts and washers are to be to in line with the requirements of the NSSS CE Marking version. Washers are to be placed beneath the rotated item.

All welds to be minimum 6mm leg length continuous fillet welds unless specifically noted otherwise. All full and partial penetration welds to be ground down smooth.

All splices are to be designed for full strength and such that the connection does not increase the overall depth of the section unless otherwise noted on the drawings or agreed with the engineer.

For steel sheet roofs the contractor is to detail all trimmer purlins required at penetrations, hips and valleys.

For paint finishes refer to table below (Sherwin-Williams Paints or similar approved):

Steel elements / exposure / locations Paint system

Within Cavity Macropoxy® C400V3 Zinc Phosphate primer to 175 microns

Internal Macropoxy® C400V3 Zinc Phosphate primer to 75 microns

External Hot dip galvanised to 85 microns

Exposed steel in pool area Macropoxy® C425 to 250 microns

Within unheated spaces + internal plantrooms Macropoxy® C400V3 Zinc Phosphate primer to 125 microns

Lateral restraint straps for floors are to be minimum 1200 long 30 x 5 galvanized MS straps at 1200 crs with 150 bob end. Straps perpendicular to joists to be nailed to tops of three joists + solid blocking infill using 5 No. 75 long, 3.8Ø nails. Straps parallel to joists are to be let-in to the top of the joists and nailed in place using 6 No. 50 long, 3.4Ø nails. Refer to typical details.

Composite ply layers to timber floors to be glued and screwed in accordance with BS EN 315 using min 50mm long galvanised screws @ 400crs. Laps in plywood to be staggered across floor area. Where joists supporting ply decking sit within the depth of steel beams the level of the top of the joists should be a minimum of 10mm above the level of the top of the steel to allow for shrinkage of the timber.

NOTCHES/HOLES IN TIMBER:

Notches / holes in timber should be avoided if possible. The contractor is to submit proposals for any holes and notches to the structural engineer for confirmation prior to works commencing on site, and allow for visual inspection by the engineer of any existing joists.

The following provides guidance on typical preferred locations of proposed holes/notches in new joists. These will be subject to review and confirmation by the structural engineer that they are applicable for each specific location:

Notches:

• Minimum 100mm spacing:

• Depth (maximum): 0.125 x joist depth.

• Distance from supports: Between 0.07 and 0.25 x span Holes (Locate at centre of joist):

• Diameter (maximum): 0.25 x joist depth.

• Centres (minimum): 3 x diameter of largest hole.

Distance from supports: Between 0.25 and 0.4 of span.

Sustainability

All timber and wood based products for either temporary or permanent inclusion in the works must be from legal and sustainable sources, as defined by the UK government Central Point of Expertise on Timber (CPET), and delivered to site with full chain of custody.

Chain of custody schemes recognised as meeting the above include:

• Program for the Endorsement of Forest Certification (PEFC)

• Forest Stewardship Council (FSC)

• Grown in Britain (GiB)

Concrete plinths are to be provided to act as bases for mechanical plant where required by services engineer. Dimensions of plinths are to suit the mechanical plant used. Drawings are to be submitted to the structural engineer for checking of plant weights on floors.

10. Health And Safety

The key construction stage health and safety hazards on this project which are considered to be unusual, abnormal or unexpected to a competent contractor carrying out work of this nature are:

Activity Hazard

Deep excavation ground water

Sequencing

Ensure that all sequence of works are agreed prior to commencement of works and that the agreed sequence is followed to ensure stability of all elements

Contractor to take necesary precautions prior to demolition of existing structure to ensure existing load paths are not broken without introduction of temproary support. Any concerns relating to the condition of the existing structure should be highlighted to HTS

Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 1 General Notes Preliminary 2856-HTS-XX-ZZ-DR-S-0001 S1 2856 Ridgway Place, 50 http://hts.uk.com/ London SW19 4SW Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

1. General Notes 2. Foundations
IN SITU
3. Underpinning 5. Concrete 6. Masonry
8.
9. Builders Work
7. Steel
Timber
Notes
Concrete Elements Grade Cover exposed to ground water or weather (mm) Blinding GEN1 N/A N/A MC GEN3 (C16/20) N/A N/A RC RC28/35 50 (TBC) 30 (TBC)
Ensure all temporary measures are in place before the excavation works are performed at each level. The level of ground water is to be estabilished with a trial pit prior to commencement of the works
Unknown existing structure or knknown defects in existing structure
+Reinforcement allowances are based on a Stage 5 level of design. suitable contingencies appropriate to the design stage must be allowed for.
RC retaining wall 150Kg/m³

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs. Proposed

London SW19 4SW

FIT POINT T5 T4 T31 T30 T6 T3 T2 T1 T32 T34 T35 T33 T56 T36 T37 T39 T42 T40 T43 T38 T44 T45 T47 T48 CAR PARK PUBLICALLEY FLAT ROOF FLAT SEDUM ROOF SVP GY GY RIDGWAY PLACE 52a RIDGEWAY PLACE G A R A G E S RS IC IC RS LP LP D 3203 A 3200 B 3201 C 3202 7 6 5 4 3 2 1 A B C D E F G EXTERNAL LANDSCAPING AND OUTHOUSES / POOL HOUSES PART OF PHASE 2 TENDER RIDGEWAY PLACE PULBICALLEY 52 RIDGEWAY PLACE Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 : 100 Proposed Site Plan Preliminary 2856-HTS-ZZ-00-DR-S-3080 2856
Place, 50 http://hts.uk.com/
Ridgway
Steel
RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16
Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete N Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender
Beams
Proposed

-

General Floor Structure Notes:

Top of timber joists are to be 10mm above the top of any supporting steelwork to allow for tolerances.

-

-

-

-

N 1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

Windposts are a CDP by the contractor.

*Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry

Axial +Ve Compression

tension

shear

shear

Existing joists note:

• Sizes are shown based on localised opening up works.

• A full assessment on the condition of the existing joists will be required by HTS.

• A new 18mm ply deck should be screwed down to the existing joists where no decking exists to stiffen the existing joists.

Proposed

overWP3

overWP3 = Major axis

5. Connection detailing to comply with the Engineer's specification and the National Steelwork specification.

6. Where existing beams are to be strengthened, the contractor is to design the existing beam end connections for the increase in loads.

7. All forces are factored ULS loads UNO.

8. All connections to be designed to a minimum Fx = 75kN and Fz = 50kN uno.

9. All connections to comply with the disproportionate collapse requirements specified in BS5950 and Part A of the Building Regulations

10. All connections drawn are indicative.

11. For definitions of loads and axes refer to XXX Typical Steel frame Load Definitions.

load

Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness

Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed

All new steel beams supported on existing masonry walls to sit on mass concrete padstones Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3

HEYNE

TILLETT

http://hts.uk.com/ London SW19 4SW

Job Name

Drawing Title Purpose of Issue Drg No

Preliminary

Rev Scale at A1

Ex. Ex. Ex. Ex. Ex. Ex. Ex. A 3200 L1 Slab infill C6under Allow for local demolition of existing slab and installation of new beams to support new staircase New slab infill Refer to extension set of drawings Refer to extension set of drawings Brickwork infill PS1 1 SSL 49.100 B 3201 C 3202 Chimney breast to be supported on new steel beam spanning between floors 1 3091 2 3091 overC1 3 4130 overC1 overC3 6 5 4 3 2 A B C D E New 250 x 50 C24 timber wall plate fixed to blockwork to support existing cut joists Beam with 10mm bottom plate to re-support existing joists. Existing joists to be cut and new steel beam to sit within depth of joists PS1 PS1 C6under PS1 C6under PS2 3 Beam with 10mm bottom plate to resupport existing joists. Existing joists to be cut and new steel beam to sit within depth of joists PS1 B3 TOS 49.470 TOS 49.470 B3 TOS 49.470 B5 TOS 49.475 B3 TOS 49.374 B5 TOS 49.480 B5 TOS 49.475 B3 TOS 49.374 215thk block wall 215thk block wall PS1 Stair void Stair void 3 3091 3 SSL 49.480 SSL 49.480 C4under C4under B3 TOS 49.470 B5 TOS 49.480 B5 TOS 49.374 B7 TOS 49.480 B5 TOS 49.470 B3 TOS 49.470 C6under PS3 overC3 B3 250 thk RC retaining wall TOC 48.568 New
WP3
Masonry walls tied together with furfix wall starter or similar agreed T1 T1 T1 * * * * * * * * * overC8 RHS to start at this level. Proposed blockwork to be installed next to RHS New blockwork tied to existing masonry with Furfix wall starter or similar agreed Existing rear facade wall demolished. Refer to architects proposals New blockwork tied to existing masonry with Furfix wall starter or similar agreed New blockwork tied to existing masonry with Furfix wall starter or similar agreed Outer leaf of Brickwork to be toothed into existing. Steel column to be tied into existing brickwork. refer to details. F F A E overC3 1 3101 2 3101 3 3101 4 3101 New 254UC to be resin fixed to existing masonry wall with M12's @ 500mm C/C (2 No). Steel to be pre drilled. Local opening to be formed in existing masonry. Minimum 25mm dry pack between steel & masonry. 440 100 New 203UC to be resin fixed to existing masonry wall with M12's @ 500mm C/C (2 No). Steel to be pre drilled. Minimum 25mm dry pack between steel & masonry. B3 DJ Double joists to trim new 1500x150 service riser B3 B3 L1 L1 C7 Fx (kN) Beam connection
table Ref 75 - 50 - -Fy (kN) Fz (kN) Mx (kNm) My (kNm) Mz (kNm) B 75 - 50 2.5 -C 75 - 50 2.5 +/-25D 75 - 50 - +/-25E 75 - 150 - -F - - 75 - +/-100A 75 - 75 - -Typical New Or Existing Steel Beam mz Fz Fy my mx Fx New or Existing Steel Column mz Fz Fy my mx Fx =
-Ve
load bearing cavity wall. 140mm blcok, 100 cavity, 100 brick (brickwork to architects details) overWP3 over Fz Fy = Major axis
overWP3 = Minor axis
overWP3 Fx mx mz my
overWP3 = Torsion = Minor axis
bending
bending
1. Refer to drawing reference for general notes
2. These drawings are to be read in conjunction with all other consultant'sinformation, the engineer's specifications and the employer's requirement document.
3. Do not scale from this drawing in either paper or digitalform.
Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm long @A1 or 50mm long @ A3.
4. The contractor is responsible for the design of all steelwork connections, including connections involving existing steelwork; column baseplate and capping plate connections.
100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 As indicated
STRUCTURAL & CIVIL ENGINEERS STEEL
Proposed
Ground Floor Plan
2856-HTS-ZZ-00-DR-S-3100 S1 2856
Ridgway Place, 50
2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.
and
Timber Floors
Windpost note:
Design intent shown.
WP = Ancon windpost
WP3 = 95 x 60 x 5
Timber joists under proposed internal non load-bearing stud walls are to be doubled up. refer to architects plans for partition locations.
Beams with symbol are to have 10mm bottom plates pre-welded to the bottom flange to support either existing timber floors or new RC slabs.
Steel beams supporting new timber floors are to have 12mm diameter pre-drilled holes to enable to fixity of the timber blocking to the steelwork on site.
*
• For size and spacing of existing joists please refer to HTS's existing drawings.
• Sufficient allowances should be made for the strengthening of existing joists on site following the full site strip out.

length Steel to be set so that joists are 10mm above

Joists as per plan with 18mm plywood glued and screwed over, supported on expament joist hangers

of joists

Joist Hanger or similar

blocking with M10 bolts @ 800crs along full length

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

RefType C1 RHS120x80x10

C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10

RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6

B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16

Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender DWG 1 10 3100 Section 1 -1 DWG 1 10 3100 Section 2 -2 DWG 1 10 3100 Section 3 -3 DWG 1 : 10 3090 Section 4 -4

London SW19 4SW

Timber blocking with M10 bolts @ 800crs along full length Existing timber joists 10mm plate welded to bottom of plate Temporary prop B5 Top of joists set 10mm above top of steel Existing joists to be propped and cut, skew nailed into timber blocking 175thk RC slab 10mm plate
to bottom of plate Timber
Existing
. Temporary prop B7 175thk RC slab 215thk block wall B5 Timber
Top
Expamet
welded approved SSL 49.480 TOS 49.480 4 Cordek heave protection HXS 225mm deep grade 7/10 50mm grout 225thk RC slab Slab depth to be reduced locally Existing floor joists 10mm plate welded to bottom of flange Existing brickwork Existing brickwork Temporarily to be back propped 10mm plate welded to top of flange Levels TBC by architect B3 B3 TOS 49.064 Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 10 Proposed Ground Floor Details Preliminary 2856-HTS-ZZ-00-DR-S-3101 2856 Ridgway Place, 50 http://hts.uk.com/
blocking with M10 bolts @ 800crs along full
joists to be propped and cut, skew nailed into timber blocking
set 10mm above top of steel
Proposed Steel Beams
TUC152x76x19
Proposed Steel Cols
Proposed

Foundation Notes:

• Mass concrete strip foundations to be minimum 1.0m deep. Final depth of foundations to be confirmed on site following excavations. Foundations are to bear onto a consistent bearing strata in the clay soils.

• Depth of foundations is to be determined by proximity to any new and existing trees.

• Edge strip foundations are to have 75mm clayboard to the inside face of the strip in accordance with NHBC rules.

Windpost note:

Windposts are a CDP by the contractor. Design intent shown.

WP = Ancon windpost

WP3 = 95 x 60 x 5

*Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

MC padstone

1 4130 D 3203 overC8 overC8 overC8 overC1 overC1 overC1 overC1 overC1 1 Existing slab to be demolished where indicated and new slab cast over B 3201 C 3202 2 4130 3 4130 7 6 5 4 A B C D E F G overC1 1 1 1 1 overC3 M2172 M2171 1.5m dp Foundation slab F2 SSL 49.100 overC3 2m deep strip foundation 2m deep strip foundation 600 600 600 600 600 overWP overWP overWP overC6 overWP overWP overC7 overC7 SSL 49.100 SSL 49.100 100, 100, 140 blockwork cavity wall as indicated. Additional piers required structurally for wall stability 600 600 600 600 All new RC suspended slabs on Cordek heave protection. HXS, 225mm deep grade 7/10 750 1000 4 3101 1 4101 2 4101 B3 B3 1 3100 L1 L1 Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
& CIVIL ENGINEERS
TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 50 Proposed Extension Ground Floor Plan Preliminary 2856-HTS-ZZ-00-DR-S-4100 2856 Ridgway Place, 50 http://hts.uk.com/
STRUCTURAL
STEEL
London SW19 4SW
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at
R144 x 200 at 600crs18mm
R3TUC152x76x19
500crs 18mm
T150 x 225 at 300crs18mm
T150x200 at 400crs18mm
T250 x 225 at 300crs18mm
T350x100 at 400crs18mm
Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp
PS3
PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete
300crs18mm thk plywood
thk plywood
at
thk plywood
thk plywood
thk plywood
thk plywood
thk plywood
- 830lg x 140wd x 330dp MC padstone
Red assumed Site
Pre-cast
Assumed
203x130x30UB
Boundary Line
lintel above, refer to notes
catnic lintels, to architects detail
with 10mm plate L1 L2 L3
Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

Foundation Notes:

• Mass concrete strip foundations to be minimum 1.0m deep. Final depth of foundations to be confirmed on site following excavations. Foundations are to bear onto a consistent bearing strata in the clay soils.

• Depth of foundations is to be determined by proximity to any new and existing trees.

• Edge strip foundations are to have 75mm clayboard to the inside face of the strip in accordance with NHBC rules.

is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

1000 Cordek heave protection HXS 225mm deep grade 7/10 225mm thk RC slab 50mm blinding Cordek heave protection HXS 225mm deep grade 7/10 1m deep strip foundation SSL 49.100 G 2000 225mm thk RC slab Assumed SSL 49.102 SSL 49.100 340thk cavity wall (140block/100cavity/102brick) 2m deep strip foundation 75 mm thk clayboard 500 Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 10 Proposed Extension Ground Floor Plan Details 2856-HTS-ZZ-00-DR-S-4101 2856 Ridgway Place, 50 http://hts.uk.com/ London SW19 4SW 1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications. 2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm. 3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists
R1<varies>
thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 DWG 1 10 4100
DWG 1 : 10 4100
Boarding
at 300crs18mm
Section 1-1
Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender
Section 2-2

Top of timber joists are to be 10mm above the top of any supporting steelwork to allow for tolerances.

Timber joists under proposed internal non load-bearing stud walls are to be doubled up. refer to architects plans for partition locations.

*

Beams with symbol are to have 10mm bottom plates pre-welded to the bottom flange to support either existing timber floors or new RC slabs.

Steel beams supporting new timber floors are to have 12mm diameter pre-drilled holes to enable to fixity of the timber blocking to the steelwork on site.

All new steel beams supported on existing masonry walls to sit on mass concrete padstones

Existing joists note:

• For size and spacing of existing joists please refer to HTS's existing drawings.

• Sizes are shown based on localised opening up works.

• Sufficient allowances should be made for the strengthening of existing joists on site following the full site strip out.

• A full assessment on the condition of the existing joists will be required by HTS.

• A new 18mm ply deck should be screwed down to the existing joists where no decking exists to stiffen the existing joists.

Windpost note:

Windposts are a CDP by the contractor. Design intent shown.

WP = Ancon windpost

WP3 = 95 x 60 x 5

*Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs. Proposed

Proposed Steel Cols

RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10

EJ EJ EJ EJ A 3200 Void T1 T1 T1 New slab infill Slab in this area to be demolished to allow construction of new staircase SSL 52.998 SSL 52.998 Existing lower level area to be demolished. New timber joists floor to be built B 3201 C 3202 Refer to extension set of drawings Refer to extension set of drawings 1 3131 DJ DJ 3 4130 6 5 4 3 2 A B C D E PS1 Steel beam as lintel to new opening below New slab infill TOS 52.883 B5 TOS 52.970 B5 TOS 52.970 B3 TOS 52.476 B14 TOS 52.633 B4 TOS 52.476 B3 TOS 52.476 B3 TOS 52.476 B4 TOS52429 B5 TOS 52.970 B3 TOS 52.476 B3 TOS 52.476 B3 TOS 52.476 B3 TOS 52.476 7 4112 B5 TOS 52.883 T1 Beam with 10mm bottom plate to resupport existing joists. Existing joists to be cut and new steel beam to sit within depth of joists Outer leaf of Brickwork to be toothed into existing. Steel column to be tied into existing brickwork. refer to details C8 B5 B13 C3 C2under B3 TOS 54.339 sloped B3 sloped B3 DJ DJ DJ DJ Void Void Void PS1 PS1 L1 PS1 PS1 C3under New blockwork tied to existing masonry with Furfix wall starter or similar agreed DJ DJ 215thk block wall 215thk block wall 5 4112 1 4112 C7 C1 C6 B3 DJ Double joists to trim new 1500x150 service riser DJ DJ L3 L2 L2 L2 L1 DJ DJ DJ DJ DJ DJ R1 R1 R1 R1 R1 B3 TOS 53.202 C Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT
100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 50 Proposed First
Plan Preliminary 2856-HTS-ZZ-01-DR-S-3110 2856
Place, 50 http://hts.uk.com/
HEYNE
Floor
Ridgway
London SW19 4SW
RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46
Steel Beams
B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16
Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete N Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm
L1 L2 L3 General Floor Structure
-
plate
Notes:
-
-
-
-
Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

Top of timber joists are to be 10mm above the top of any supporting steelwork to allow for tolerances.

Timber joists under proposed internal non load-bearing stud walls are to be doubled up. refer to architects plans for partition locations.

*

Beams with symbol are to have 10mm bottom plates pre-welded to the bottom flange to support either existing timber floors or new RC slabs.

Steel beams supporting new timber floors are to have 12mm diameter pre-drilled holes to enable to fixity of the timber blocking to the steelwork on site.

All new steel beams supported on existing masonry walls to sit on mass concrete padstones

Existing joists note:

• For size and spacing of existing joists please refer to HTS's existing drawings.

• Sizes are shown based on localised opening up works.

• Sufficient allowances should be made for the strengthening of existing joists on site following the full site strip out.

• A full assessment on the condition of the existing joists will be required by HTS.

• A new 18mm ply deck should be screwed down to the existing joists where no decking exists to stiffen the existing joists.

Windpost note:

Windposts are a CDP by the contractor.

Design intent shown.

WP = Ancon windpost

WP3 = 95 x 60 x 5

*Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry

1. This drawing is to be read in conjunction with all relevant

of PFCs and RSAs.

Ridgway Place, 50

London SW19 4SW

T2 T2 T2 A 3200 New timber floor infill B3 B3 B5 Void Existing wall to support new ridge roof structure above Existing floor to be locally demolished to allow installation of new stairs B5 B 3201 C 3202 B3 Existing corbel to be removed to second floor level and new dwarf brickwork built to support new roof B3 1 3131 overC3 overC3 4 3 2 A B C D E B7 B7 TOS 56.104 4 3121 B3 TOS 56.104 B3 B3 SECOND FLOOR DEMO NOTE: All existing structure from second floor above, including the existing timber joists at second are to be demolished. Sufficent temporary works allowances are to be made for the temporary restraint of the existing masonry walls prior to full demo. PS1 PS1 Load bearing timber stud Load bearing timber stud T2 T2 T2 T2 T2 T2 T2 T2 Doubled up timber stud to support hip beam Doubled up timber stud to support hip beam Doubled up timber stud to support hip beam New timber stud wall line to support line of rafters above. 100 x 50s @600mm c/c New timber wall line above blockwork 150 x 50 @ 600 c/c New timber stud wall line to support line of rafters above. 100 x 50s @600mm c/c PS1 PS1 PS1 PS1 1 3121 PS1 PS1 PS1 PS2 PS1 PS1 DJ New service riser to change size at this location. New size and position to be agreed by ME and Architect DJ DJ Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 50
STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE
Preliminary 2856-HTS-ZZ-02-DR-S-3120 2856
Proposed Second Floor Plan
http://hts.uk.com/
architects,
specifications. 2.
above
100mm. 3.
setting
dimensions
in red
to
confirmed
architect.
dimensions are
checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete N Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 General Floor Structure Notes: -
engineers and specialists drawings and
Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the
bar should be
Any
out
shown
are
be
by the
All
to be
-
-
-
-
Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs. Proposed

Proposed Steel Cols

RefType

C1 RHS120x80x10

C2 SHS100x100x10

C3 UC203x203x46

C4 UC254x254x73

C6 UC152x152x30

C7 RHS250x100x10

C8 RHS200x100x10

Proposed

B14UB406x140x39

B15RHS300x100x16

Proposed Floors

RefThickness and Type

1 225 thk RC slab

2 200 thk RC slab

3 175 thk RC slab 4 150 thk RC slab

2 Skew nailed Birdsmouth cut 50 x 100 Timber Stud wall Timber header plate 44x200 C24 timber joists at 600mm crs with 18mm thick PLY on top Stainless steel angle plate Timber wall plate, resin fixed down to masonry Timber sole plate D Skew nailed Timber header plate Birdsmouth cut 50 x 100 Timber Stud wall 50 x 225 C24 timber joists at 300mm crs with 18mm thick PLY on top B3 L'Bob end restraint strap fixed to new masonry 340thk cavity wall (140block/100cavity/102brick) Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 10 Proposed Second Floor Plan Details 2856-HTS-ZZ-02-DR-S-3121 2856 Ridgway Place, 50 http://hts.uk.com/ London SW19 4SW 1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications. 2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm. 3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement
Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40
Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete N Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 DWG 1 10 3120 Section 1 -1 DWG 1 10 3120 Section 4 -4 Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

Top of timber joists are to be 10mm above the top of any supporting steelwork to allow for tolerances.

Timber joists under proposed internal non load-bearing stud walls are to be doubled up. refer to architects plans for partition locations.

*

Beams with symbol are to have 10mm bottom plates pre-welded to the bottom flange to support either existing timber floors or new RC slabs.

Steel beams supporting new timber floors are to have 12mm diameter pre-drilled holes to enable to fixity of the timber blocking to the steelwork on site.

All new steel beams supported on existing masonry walls to sit on mass concrete padstones

Existing joists note:

• For size and spacing of existing joists please refer to HTS's existing drawings.

• Sizes are shown based on localised opening up works.

• Sufficient allowances should be made for the strengthening of existing joists on site following the full site strip out.

• A full assessment on the condition of the existing joists will be required by HTS.

• A new 18mm ply deck should be screwed down to the existing joists where no decking exists to stiffen the existing joists.

Windpost note:

Windposts are a CDP by the contractor. Design intent shown.

WP = Ancon windpost

WP3 = 95 x 60 x 5

*Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

A 3200 R1 R1 R1 R1 SSL 58.558 SSL 58.558 SSL 58.558 SSL 58.558 B 3201 B8 TOS 59.603 C3under C3under DJ DJ DJ DJ DJ DJ DJ DJ SSL 58.558 DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ Typical dormer construction: Dormers to be supported on double joists "DJ" as shown. Dormer construction: Vertical studs: 50x100 C16 at 400crs Rafter: 50x100 C16 at 400crs 1 3131 T3 T3 T3 T3 T3 DJ DJ DJ DJ 6 5 4 3 2 A B C D E All Hip beams to main roof to be 2No. 250 x 75s C24 sections All Hip beams to main roof to be 2No. 250 x 75s C24 sections All Hip beams to main roof to be 2No. 250 x 75s C24 sections All Hip beams to main roof to be 2No. 250 x 75s C24 sections Assumed rafter sit on top of beam flange Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 50 Proposed Roof Plan Preliminary 2856-HTS-ZZ-03-DR-S-3130 2856 Ridgway Place, 50 http://hts.uk.com/
London SW19 4SW
2.
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete N Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 General Floor Structure Notes: -
-
-
-
-
Rev Date ByEngAmendment
T107.12.22SB JNIssue For Tender
T215.12.11NN NFIssue For Tender

-

-

General Floor Structure Notes: -

Timber joists under proposed internal non load-bearing stud walls are to be doubled up. refer to architects plans for partition locations.

Steel beams supporting new timber floors are to have 12mm diameter pre-drilled holes to enable to fixity of the timber blocking to the steelwork on site.

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

Existing joists note:

• For size and spacing of existing joists please refer to HTS's existing drawings.

• Sizes are shown based on localised opening up works.

• Sufficient allowances should be made for the strengthening of existing joists on site following the full site strip out.

• A full assessment on the condition of the existing joists will be required by HTS.

• A new 18mm ply deck should be screwed down to the existing joists where no decking exists to stiffen the existing joists.

Sump RC box note:

Proposed Foundations

This line of underpinning is to be reinforced concrete underpinning. The extent is dictated by the extent of the existing steps. The foundation is assumed to step up with the existing steps. Refer to Detail.

New opening

600mm wide x 750mm deep MC strip

In this area allow for HX S cordek heave protection under bottom of slab. 225mm deep, grade 7/10 on 50mm blinding.

50mm blinding over 150mm hardcore elsewhere

Pre-cast lintels above, refer to notes New opening

refer to details

Embed this maximum 100mm into the existing wall.

Open excavation assumed for construction of basement. Retaining wall to be back filled with free drainage granular material. Drainage strategy TBC

PSx

x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone

assumed Site Boundary

This area of existing masonry is retained. Only a local chase out in the wall line

New mass concrete underpinning to enable the lowering of the slabs. Mass COncrete underpinning to be carried out in max 1.0m wide sections in a sequence agreed with the contractor

The extent of underpinning shown is to enable the lowering of the existing slab to achieve a new FFL of ?. Mass concrete underpinning is to be formed in max 1.0m sections in a 1,4,2,5,3 sequence to be determined by the contractor. Sufficient curing time between pours is to be allowed for in the construction programme.

The underpinning shown is also based on the trial pit investigations which are limited to local areas. Sufficient allowances should be made to account for any deviations on site when comparing to the SI.

Underpin details drawn based on existing footing assumptions. Existing condition / size of footings to be determined on site.

Ground Water:

Intrusive borehole investigations on site have found the water level in the ground to be circa 3m below ground level. Further ground water monitoring is to be undertaken on site to establish the long term ground water level. The contractor is to determine the level of the ground water for their own temporary works design and sequencing proposals for the formation of the basement and the underpinning to the main house.

Suitable allowances should be made for a dewatering strategy if required, with specialists being engaged early to advise on dewatering implications on the permanent works design.

The retaining wall type shown assumes that an open excavation could be formed to cast the retaining wall. This assumes the water found in the investigation is perched or that a dewatering strategy could be achieved. The contractor is to make HTS aware if this is not the case and propose a new method of forming the retaining walls (embedded contig piled wall for example).

L1 L2 L3

All new steel beams supported on existing masonry walls to sit on mass concrete padstones Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate

A 3200 New opening New masonry infill. Minimum 7N/mm2 blockwork to match existing widths L1 overC6 F1 Staircase details TBC B 3201 C 3202 L1 L1 L1 1 3091 2 3091 4 3 2 A B C D E F3 overC6 0.75m wide MC strip footing. 0.45m deep F3 3 3091 250 thk
wall 2 2 2 SSL 46.387 SSL 46.387 SSL 46.387 overC6 overC6 F2 F3 overC4 overC4
RC slab
foundation New opening New opening
RC retaining
foundation.
to sit on top of
New mass concrete underpinning to enable the lowering of the slabs. Mass COncrete underpinning to be carried out in max 1.0m wide sections in a sequence agreed with the contractor New mass concrete underpinning to enable the lowering of the slabs. Mass concrete underpinning to be carried out in max 1.0m wide sections in a seqence agreed with the contractor 1 3095 3 3095
Precast lintels above, refer to notes
L1
2 3095 4 2 215thk block wall 4 3101 Assumed location of RC box to house foul sump. 1.0m
1.0m
1.5m deep internal dimension. Walls and slab 200mm Lintel to accommodate lowered window height Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 50
Basement Plan Preliminary 2856-HTS-ZZ-B1-DR-S-3090 2856
Place, 50
x
x
STRUCTURAL & CIVIL ENGINEERS
Proposed
Ridgway
http://hts.uk.com/ London SW19 4SW
Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16
Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10
Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab
Timber
RefJoists
R1<varies>
R144 x 200 at
R3TUC152x76x19
500crs 18mm
T150 x 225 at 300crs18mm
T150x200 at 400crs18mm thk
T250 x 225 at 300crs18mm thk
T350x100 at 400crs18mm
Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd
Proposed
Proposed
Proposed
Proposed
Floors
Boarding
at 300crs18mm thk plywood
600crs18mm thk plywood
at
thk plywood
thk plywood
plywood
plywood
thk plywood
RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete N Red
Red dimension TBC by architect Dim Line
Underpinning Notes:
Allowances to be made for RC boxes below basement level to house sump chambers and manholes, further co-ordination required
-
Top of timber joists are to be 10mm above the top of any supporting steelwork to allow for tolerances.
-
Beams with symbol are to have 10mm bottom plates pre-welded to the bottom flange to support either existing timber floors or new RC slabs.
*

1. This drawing is to be read in conjunction with all relevant architects,

Section 2-2 -Typical Section Through External Wall Underpins Showing Key Detail Between RC & Existing Masonry

Underpinning Notes:

The extent of underpinning shown is to enable the lowering of the existing slab to achieve a new FFL of ?. Mass concrete underpinning is to be formed in max 1.0m sections in a 1,4,2,5,3 sequence to be determined by the contractor. Sufficient curing time between pours is to be allowed for in the construction programme.

The underpinning shown is also based on the trial pit investigations which are limited to local areas. Sufficient allowances should be made to account for any deviations on site when comparing to the SI.

Underpin details drawn based on existing footing assumptions. Existing condition / size of footings to be determined on site.

Ground Water:

Intrusive borehole investigations on site have found the water level in the ground to be circa 3m below ground level. Further ground water monitoring is to be undertaken on site to establish the long term ground water level. The contractor is to determine the level of the ground water for their own temporary works design and sequencing proposals for the formation of the basement and the underpinning to the main house.

Suitable allowances should be made for a dewatering strategy if required, with specialists being engaged early to advise on dewatering implications on the permanent works design.

The retaining wall type shown assumes that an open excavation could be formed to cast the retaining wall. This assumes the water found in the investigation is perched or that a dewatering strategy could be achieved. The contractor is to make HTS aware if this is not the case and propose a new method of forming the retaining walls (embedded contig piled wall for example).

RSAs.

Proposed Basement Underpinning Details

2 Extg. FFL 46.850 SSL 46.387 200 thk RC slab 50 thk blinding on 150 thk well compacted hardcore New RC slab to be dowelled to mass concrete underpins with H16 dowell bars @ 400mm c/c, minimum embeddment 150mm Minimum 50mm dry pack, well rammed in 3:1 sand :cement 60x100 recess in slab for cavity drain channel Contractor to allow for RC pocket detail at the top of the mass concrete underpins to the perimeter if the existing foundations deviate significantly to that found on site. 4 200 thk RC slab SSL 46.387 Extg. FFL 46.850 60x100 recess in slab for cavity drain channel 50 thk blinding on 150 thk well compacted hardcore New RC slab to be dowelled to mass concrete underpins with H16 dowell bars @ 400mm c/c, minimum embeddment 150mm Minimum 50mm dry pack, well rammed in 3:1 sand :cement Min. 500 Min. 600 SSL 46.387 RC underpins in 1m lengths Proposed RC slab Rebar indicative only External ground level Existing masonry wall Existing corbels to be retained Dry pack Existing corbels removed 440x215high x 100dp RC pocket every second pin. Condition and level of existing wall on site TBC PROP Finishes to Arch detail 300mm long H16 dowel bars @ 400mm c/c 50mm blinding on 150 well compacted hardcore 1000 SSL 100.00 Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 10
STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE
2856-HTS-ZZ-B1-DR-S-3095 2856
http://hts.uk.com/ London
1 10 Section 1 -1 1 10 Section 3 -3
Ridgway Place, 50
SW19 4SW
engineers and specialists drawings and specifications. 2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm. 3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

1. Refer to drawing 0001 for general notes

2. These drawings are to be read in conjunction with all other consultant's information, the engineer's specifications and the employer's requirement document.

3. Do not scale from this drawing in either paper or digitalform. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm long @A1 or 50mm long @ A3.

4. The contractor is responsible for the design of all steelwork connections, including connections involving existing steelwork column baseplate and capping plate connections.

5. Connection detailing to comply with the Engineer's specification and the National Steelwork specification.

6. Where existing beams are to be strengthened, the contractor is to design the existing beam end connections for the increase in loads.

7. All forces are factored ULS loads UNO.

8. All connections to be designed to a minimum Fx = 75kN and Fz = 50kN uno.

9. All connections to comply with the disproportionate collapse requirements specified in BS5950 and Part A of the Building Regulations

10. All connections drawn are indicative.

11. For definitions of loads and axes refer to XXX Typical Steel frame Load Definitions.

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs. Proposed

STRUCTURAL &

CIVIL

ENGINEERS STEEL TILLETT HEYNE

http://hts.uk.com/ London SW19 4SW

Ridgway Place, 50

Proposed Extension Lower Roof Plan Preliminary

As indicated

1 4130 D 3203 C8under C1under C1under C1under C1under C1under C8under T1 T1 T1 T1 T1 T1 T1 C8under Void B4 B 3201 C 3202 1 3105 2 4130 3 4130 7 6 5 4 A B C D E F G B3 TOS 52.476 B14 TOS 52.633 B4 TOS 52.476 B4 TOS 52.429 TOS 52.429 B11 TOS 52.476 B11 TOS 52.429 B3 TOS 52.353 B14 TOS 52.633 B3 TOS 52.476 B3 TOS 52.476 B4 TOS52429 B4 TOS52429 B5 TOS 52.476 B5 TOS 52.476 B3 TOS 52.476 B3 TOS 52.476 B4 TOS 52.429 B4 TOS 52.429 B3 TOS 52.476 B3 TOS 52.476 B3 TOS 52.476 B3 TOS 52.476 B3 TOS 52.476 B13 TOS 51.542 B4 TOS 51.542 B4 TOS52430 B3 TOS 52.476 DJ DJ B3 TOS 52.476 T1 B3 TOS 52.476 B3 TOS 52.476 B3 TOS 51.542 C3under B3(Low Lev) TOS 51.542 B13(High Lev) TOS 52.260 overC2 PS1 PS1 PS1 B4 TOS 52.429 B4 TOS 52.429 C1under C3under B15 TOS 52.633 7 4112 C7under C7under Secondary cantilevering steelwork by others. Refer to detail for design intent All edge steels to extension to have top 10mm top plate to support masonry parapet above. Refer to detail T1 T1 T1 T1 T1 Steel plate welded to underside of steel beams to provide support to glazing under B3 TOS 52.476 PS2 D D C B B D D D C B C C C C B B B A B B B B B D D 3 4112 4 4112 5 4112 Fix arrangement of beams into columns at this lcoation TBC B4 TOS 52.430 PS1 PS1 Fx (kN) Beam connection load table Ref 75 - 50 - -Fy (kN) Fz (kN) Mx (kNm) My (kNm) Mz (kNm) B 75 - 50 2.5 -C 75 - 50 2.5 +/-25D 75 - 50 - +/-25E 75 - 150 - -F - - 75 - +/-100A 75 - 75 - -Typical New Or Existing Steel Beam mz Fz Fy my mx Fx New or Existing Steel Column mz Fz Fy my mx Fx = Axial +Ve Compression -Ve tension Fz Fy Major axis shear Minor axis shear Fx mx mz my = Torsion Minor axis bending Major axis bending
Rev Scale at A1
Purpose
Issue Drg No
Job Name Drawing Title
of
100mm @ A1 (50mm @ A3) Suitability HTS Job No T2
2856-HTS-ZZ-RF-DR-S-4110 2856
RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16
Steel Beams
RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Windpost note: Windposts are a CDP by the contractor. Design intent shown. WP = Ancon windpost WP3 = 95 x 60 x 5 *Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender
Proposed Steel Cols

as per plan with 18mm plywood glued and screwed over, supported on expament joist hangers

stel plate welded to top of RHS

wall plate, resin fixed to masonry

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

steelwork for cantilevering canopy will need to be fixed directly back to our main steel. Detail to be developed with contractor (secondary steelwork CDP)

plate fixed to steel with staggered M12's, steel to be pre drilled

Joists as per plan with 18mm plywood glued and screwed over, supported on expament joist hangers

6 B3 Joists 50 x 200 B14 C1 Timber sole plate bolted down to the top of the rafters TOS 52.633 7
100mm thk blockwork 100mm thk
10mm
Wall
Secondary
5 TOS 51.542 18 thk plywood 50 x 200 at 400 C/C 18mm plywood Expamet Joist Hanger or similar approved 140mm blockwork 100mm cavity 140mm blockwork B13 Timber blocking with M10 bolts @ 800crs along full length TOJ 52.487
Timber
Stainless steel angle cleat TOB 53.374 10mm steel plate welded to
flange B2 TOS 54.562 Timber blocking with M10 bolts @ 800crs along full length Rafters to be nailed to blocking B2 10mm thk plate welded to web of beam 4 B15 TOS 52.633 18mm plywood roof Stainless steel angle cleat Birdsmouth cut Sole plate to be fixed to steel using hollow steel fixing bolts at 500mm C/C. Steel to be pre drilled. Timber sole plate Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
& CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 As indicated
roof detail plan Preliminary 2856-HTS-ZZ-RF-DR-S-4112 2856
Place, 50 http://hts.uk.com/ London SW19 4SW
Joists
blockwork
thk
top
STRUCTURAL
Proposed Extension
Ridgway
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 DWG 1 10 3203 Section 3 -3 DWG 1 10 4110 Section 4 -4 Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender DWG 1 20 3105 Section 5 -5 DWG 1 : 10 3110 Section 1 -1 DWG 1 : 10 3110 Section 7 -7

Proposed Steel Cols

dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs. Proposed Steel Beams

RHS250x100x10

RHS200x100x10

Proposed Floors RefThickness

1 4130 D 3203 Outline of lower flat roof B2 TOS 54.562 18mm Plywood roofing B 3201 C 3202 2 4130 3 4130 7 6 5 4 A B C D E F G PS2 B3 TOS 54.339 C2under B3 DJ DJ 7 4112 sloped B3 sloped B3 DJ DJ DJ DJ DJ DJ 3 4112 5 4112 1 4112 Refer to drg. 4110 for rafters support points Refer to drg. 4110 for rafters support points B3 TOS 53.202 R1 R1 R1 R1 R1 C DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ DJ R1 R1 DJ DJ DJ DJ Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 50 Proposed Extension Upper Roof Plan Preliminary 2856-HTS-ZZ-RF-DR-S-4120 2856 Ridgway Place, 50 http://hts.uk.com/ London SW19 4SW 1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications. 2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm. 3. Any setting out
RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7
B8
B14UB406x140x39 B15RHS300x100x16
UC203x203x86
UB254x146x31 B11UC203x203x52 B13UB305x165x40
C1
C2
C3
C6
C7
C8
RefType
RHS120x80x10
SHS100x100x10
UC203x203x46 C4 UC254x254x73
UC152x152x30
and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone Red dimension TBC by architect Legend PSx Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Windpost note: Windposts are a CDP by the contractor. Design intent shown. WP = Ancon windpost WP3 = 95 x 60 x 5 *Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73

C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10

Proposed Steel Beams

Section 1 -1

Proposed Floors RefThickness and Type 1 225 thk RC slab 2

Section 2 -2

B8 UB254x146x31 B11UC203x203x52

Underpinning Notes:

The extent of underpinning shown is to enable the lowering of the existing slab to achieve a new FFL of ?. Mass concrete underpinning is to be formed in max 1.0m sections in a 1,4,2,5,3 sequence to be determined by the contractor. Sufficient curing time between pours is to be allowed for in the construction programme.

The underpinning shown is also based on the trial pit investigations which are limited to local areas. Sufficient allowances should be made to account for any deviations on site when comparing to the SI.

Underpin details drawn based on existing footing assumptions. Existing condition / size of footings to be determined on site.

Ground Water:

Intrusive borehole investigations on site have found the water level in the ground to be circa 3m below ground level. Further ground water monitoring is to be undertaken on site to establish the long term ground water level. The contractor is to determine the level of the ground water for their own temporary works design and sequencing proposals for the formation of the basement and the underpinning to the main house.

Suitable allowances should be made for a dewatering strategy if required, with specialists being engaged early to advise on dewatering implications on the permanent works design.

The retaining wall type shown assumes that an open excavation could be formed to cast the retaining wall. This assumes the water found in the investigation is perched or that a dewatering strategy could be achieved. The contractor is to make HTS aware if this is not the case and propose a new method of forming the retaining walls (embedded contig piled wall for example).

Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate

L1 L2 L3 Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

Ridgway

B SSL 46.387 FFL 48.568 Existing foundation to be locally demolished to allow construciton of new door opening TOC 48.568 L1 Lintel over door L1 Existing windows cill to be lowered down Existing window to be partially infill D 600thk RC base SSL 49.480 250 thk RC retaining wall 340thk cavity wall (140block/100cavity/102brick) 450 600 450 HX S Cordek Heave Proection. 225mm deep, Grade 7/10. On 50mm blinding 800 600 600mm wide x 750mm deep MC strip foundation. RC slab to sit on top of foundation Existing wall to be removed B5 TOS 49.480 SSL 46.387 200 thk RC slab 175thk RC slab 215thk block wall Slab tied down to foundation with H16 BARS @ 300mm c/c Bottom steel plate to support new RC slab Retaining wall to backfilled with free draining granular material 2 SSL 46.387 SSL 46.387 50 thk blinding on 150 thk well compacted hardcore 200 thk RC slab 250 thk RC retaining wall SSL 48.568 MC underpins Retaining wall to backfilled with free draining granular material Assumed 150mm high RC upstand between external and internal Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
& CIVIL ENGINEERS
TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 25
Basement Detail 2856-HTS-ZZ-ZZ-DR-S-3091 2856
STRUCTURAL
STEEL
Proposed
Place, 50
http://hts.uk.com/ London SW19 4SW
RefType B2 UB457x152x74 B3 UB203x133x30 B4
B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86
RHS200x120x10
B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16
200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at
thk
Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete 1 25
1 25
3
1 25
400crs18mm
plywood
Section
-3

Top of timber joists are to be 10mm above the top of any supporting steelwork to allow for tolerances. - Timber joists under proposed internal non load-bearing stud walls are to be doubled up. refer to architects plans for partition locations.

*

Beams with symbol are to have 10mm bottom plates pre-welded to the bottom flange to support either existing timber floors or new RC slabs.

Steel beams supporting new timber floors are to have 12mm diameter pre-drilled holes to enable to fixity of the timber blocking to the steelwork on site.

All new steel beams supported on existing masonry walls to sit on mass concrete padstones

Existing joists note:

• For size and spacing of existing joists please refer to HTS's existing drawings.

• Sizes are shown based on localised opening up works.

• Sufficient allowances should be made for the strengthening of existing joists on site following the full site strip out.

• A full assessment on the condition of the existing joists will be required by HTS.

• A new 18mm ply deck should be screwed down to the existing joists where no decking exists to stiffen the existing joists.

Windpost note:

Windposts are a CDP by the contractor. Design intent shown.

WP = Ancon windpost

WP3 = 95 x 60 x 5

*Windposts shown indicatively for load bearing masonry elements only. Contractor is to allow for windposts required in non load bearing masonry

N 1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

Proposed Steel Beams

A 3200 B 3201 C 3202 New opening in the wall to give access to proposed mezzanine level Void Existing ground floor Existing ground floor Stair void Proposed landing to access mezzanine floor T1 B13 TOS 51.542 B4 TOS 51.542 C1under C1under C3under 6 5 4 A B C Stair void 3 3091 C3under T1 SSL 51.570 SSL 51.570 B3 TOS 51.542 B3 TOS 51.542 5 4112 New 254UC to be resign fixed to existing masonry wall with M12's @ 500mm C/C (2 No). Steel to be pre drilled. Local opening to be formed in existing masonry. Minimum 25mm dry pack between steel & masonry. 3 SSL 49.480 L1 Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
& CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T2 1 50 Proposed Mezzanine Level 2856-HTS-ZZ-ZZ-DR-S-3105 2856
Place, 50 http://hts.uk.com/
STRUCTURAL
Ridgway
London SW19 4SW
RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16
RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 General Floor Structure
-
Proposed Steel Cols
Notes:
-
-
-
Rev Date ByEngAmendment T107.12.22SB JNIssue For Tender T215.12.11NN NFIssue For Tender

the centre of symmetric sections and to the back face of PFCs and RSAs.

B5 B3 B3 B5 B3 B C D B5 B5 B7 C6 C6 C6 SSL 49.498 B3 B3 B3 B5 B3 SSL 52.998 SSL 56.132 50mm blinding on 150 well compacted hardcore mass concrete underpinning, refer to details 3 340thk cavity wall (140block/100cavity/102brick) 50 thk Blinding 800dp Foundation Footing Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T1 1 50 Proposed Section A-A Preliminary 2856-HTS-ZZ-ZZ-DR-S-3200 2856 Ridgway Place, 50 http://hts.uk.com/ London SW19 4SW 1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications. 2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm. 3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at
plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment T115.12.11NN NFIssue For Tender
300crs18mm thk

unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

Proposed

B5 SSL 51.570 B13 B4 C1 TOS 52.476 2211 6 5 4 3 2 C3 B3 B13 C2 B3 5 4112 B5 C6 C6 B3 B3 B8 1m deep strip foundation 800dp Foundation Footing SSL 49.498 B3 B3 SSL 53.005 SSL 56.132 mass concrete underpinning, refer to details mass concrete underpinning, refer to details mass concrete underpinning, refer to details B3 B3 B4 B3 Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T1 1 50
Section
2856-HTS-ZZ-ZZ-DR-S-3201 2856 Ridgway Place, 50 http://hts.uk.com/ London SW19 4SW 1.
specifications. 2.
drawing
printed
scale
above bar should be 100mm. 3.
dimensions
red
confirmed
architect.
dimensions
checked
contractor
site dimensions prior to fabrication /commencement of work
site. Beams and columns are to be centred on grid
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment T115.12.11NN NFIssue For Tender
B-B
This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and
Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check
has been
to the intended
the
Any setting out
shown in
are to be
by the
All
are to be
by the
against
on

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications. 2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm. 3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

B C D F G B3 B4 B3 B3 B13 B3 B3 B3 B3 B4 1m deep strip foundation 2m deep strip foundation 2m deep strip foundation 2m deep strip foundation 1m deep strip foundation C2 B3 225mm thk RC on HXS 225mm Grade 9/13 302 thk (100/100/102) cavity wall Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
& CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No T1 1 50
Section C-C 2856-HTS-ZZ-ZZ-DR-S-3202 2856
Place, 50 http://hts.uk.com/ London SW19 4SW
STRUCTURAL
Proposed
Ridgway
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel Cols RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness and Type 1 225 thk RC slab 2 200 thk RC slab 3 175 thk RC slab 4 150 thk RC slab Proposed Timber Cols Ref Size Proposed Timber Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment T115.12.11NN NFIssue For Tender

1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications.

2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm.

3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

http://hts.uk.com/ London SW19 4SW

C1 B5 B5 44x170mm timer joist at 600ctrs with 18 thk plywood on top 225mm thk RC on HXS 225mm Grade 9/13 B2 B15 18mm plywood roof SSL 49.100 TOS 52.476 TOS 52.476 B14 TOS 52.633 TOS 54.562 Wall beyond 50 thk blinding on 150 thk well compacted hardcore 7 6 5 4 3 4112 TOS 52.633 1m deep strip foundation 1m deep strip foundation Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No
100mm @ A1 (50mm @ A3) Suitability HTS Job No T1 1 50
Section
2856-HTS-ZZ-ZZ-DR-S-3203 2856
Place, 50
STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE
Proposed
D-D
Ridgway
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16
Steel
RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10
Floors RefThickness
1 225 thk RC
2 200 thk RC
3 175 thk RC slab 4 150 thk
Proposed Timber Cols Ref Size Proposed
RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Legend Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone PSx Red dimension TBC by architect Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment T115.12.11NN NFIssue For Tender
Proposed
Cols
Proposed
and Type
slab
slab
RC slab
Timber Floors

Proposed Extension Section 2-2

Proposed Extension Section 1-1

Proposed Extension Section 3-3

and columns are to be centred on grid unless noted otherwise. Setting out of steelwork is shown to the centre of symmetric sections and to the back face of PFCs and RSAs.

B4 18mm plywood roof SSL 49.100 44x170mm timer joist at 400ctrs with 18 thk plywood on top 600 thk foundation slab 225mm thk RC on HXS 225mm Grade 9/13 TOS 52.429 TOS 54.562 B3 B3 TOS 52.476 Foundation details TBC on site 50 thk blinding on 150 thk well compacted hardcore C D F G B13 B3 B2 B3 B3 B6 TOS 52.311 TOS 52.476 44x170mm timer joist at 600ctrs with 18 thk plywood on top 1 4112 225mm thk RC on HXS 225mm Grade 9/13 B4 B3 B3 B3 B11 C8 B4 B6 B6 TOS 52.311 TOS 52.310 50 thk blinding on 150 thk well compacted hardcore 7 6 5 4 C1 B2 B14 225mm thk RC on HXS 225mm Grade 9/13 TOS 52.476 TOS 54.562 B3 SSL 49.100 B6 6 5 4 SSL 46.387 SSL 49.480 Rev Scale at A1 Job Name Drawing Title Purpose of Issue Drg No STRUCTURAL & CIVIL ENGINEERS STEEL TILLETT HEYNE 100mm @ A1 (50mm @ A3) Suitability HTS Job No 1 50 Proposed Extension Sections Preliminary 2856-HTS-ZZ-ZZ-DR-S-4130 2856 Ridgway Place, 50 http://hts.uk.com/ London SW19 4SW 1. This drawing is to be read in conjunction with all relevant architects, engineers and specialists drawings and specifications. 2. Do not scale from this drawing in either paper or digital form. Use written dimensions only. To check drawing has been printed to the intended scale the above bar should be 100mm. 3. Any setting out dimensions shown in red are to be confirmed by the architect. All dimensions are to be checked by the contractor against site dimensions prior to fabrication /commencement of work on site. Beams
Proposed Steel Beams RefType B2 UB457x152x74 B3 UB203x133x30 B4 RHS200x120x10 B5 UC203x203x46 B6 TUC152x76x19 B7 UC203x203x86 B8 UB254x146x31 B11UC203x203x52 B13UB305x165x40 B14UB406x140x39 B15RHS300x100x16 Proposed Steel
RefType C1 RHS120x80x10 C2 SHS100x100x10 C3 UC203x203x46 C4 UC254x254x73 C6 UC152x152x30 C7 RHS250x100x10 C8 RHS200x100x10 Proposed Floors RefThickness
1 225
2 200
3 175
4 150
Proposed Timber Cols Ref Size Proposed
Floors RefJoists Boarding R1<varies> at 300crs18mm thk plywood R144 x 200 at 600crs18mm thk plywood R3TUC152x76x19 at 500crs 18mm thk plywood T150 x 225 at 300crs18mm thk plywood T150x200 at 400crs18mm thk plywood T250 x 225 at 300crs18mm thk plywood T350x100 at 400crs18mm thk plywood Proposed RC structure Proposed timber structure Proposed Steel Framing PS1 - 440lg x 100wd x 215dp MC padstone PS2 - 600lg x 215wd x 215dp MC padstone PS3 - 830lg x 140wd x 330dp MC padstone Red dimension TBC by architect Legend PSx Dim Proposed Foundations RefWidthLengthDepthDescription F1 600 600 600 Mass concrete F2 1000 1000 800 Mass concrete F3 500 500 600 Mass concrete
Cols
and Type
thk RC slab
thk RC slab
thk RC slab
thk RC slab
Timber
Red assumed Site Boundary Line Pre-cast lintel above, refer to notes Assumed catnic lintels, to architects detail 203x130x30UB with 10mm plate L1 L2 L3 Rev Date ByEngAmendment