Resume
Education
Arab Academy for Science, Technology and Maritime Transportation (AAST) 2019-2022
Bachelor of of architecture engineering: Architecture engineering & environmental design
Programs
Grade: Ranked Fourth Place With GPA:3.5 “Very Good With Honor”
Profile Info
I am a fresh graduate architect. Obtained my Architectural bachelor’s degree from AAST university. I was ranked the fourth with grade very good with honors . A passionate, hard worker & self-learner junior architect who believes in the ability of architecture & research in changing users’ experience in the space. Skilled multitasker with superior work ethic and good teamwork, problem-solving and organizational skills. I seek challenging opportunities where I can fully use my skills.
Language
English: Fluent
Arabic: Mother tongue
French: Basic
Experience
Soft Skills
Hard Skills
Significant courses
Related courses
COLORFRICA
TOURISTIC AFRICAN PERFORMING ARTS CENTER Spring 2021/2022
POST COVID REHABILITATION CENTER Fall 2021/2022
SHERATON NURSING HOME Spring 2020/2021
SEHEIL POST COVID GOVERNEMENTAL HIGH SCHOOL Fall 2020/2021
MASPERO FERRY TERMINAL AND BUSINESS INCUBATORS Spring 2019/2020
COMMUNITY & ART CENTER Fall 2018/2019
ALMAZA PUBLIC PARK Fall 2021/2022
POST COVID REHABILITATION CENTER Fall 2021/2022
ART NOUVEAU HOUSE Spring 2020/2021
BIOPHILIC OFFICE Spring 2020/2021
SMALL RESTAURANT Spring 2020/2021
REDESIGNING ENGINEERING BUILDING (A) CAFETERIA Spring 2019/2020
ARNE JACOBSEN THEMED HOUSE Fall 2019/2020
INTRODUCTION TO CITY ®IONAL PLAINNING Fall 2020/2021
INTRODUCTION TO URBAN DESIGN Spring 2020/2021
INTRODUCTION TO SITE PLANNING & HOUSING Fall 2021/2022
EXECUTION DESIGN 3 Fall 2021/2022
EXECUTION DESIGN 2 Spring 2020/2021
EXECUTION DESIGN 1 Fall 2020/2021
3D MODELS (PHYSICAL-DIGITAL) PHOTOGRAPHY ARTISTIC COURSES & ELECTIVES
Contents Architectural Design Interior Design Urban Design Enviromental design 1&2 Free hand & Digital skills Execution Design Landscape 01 02 03 04 05 06 07 08 4 10 16 24 30 34 38 42 46 50 54 60 82 112 128 135 139 142 144 148 152 09 10 11 12 13 17 18 19 21 22 23 20 14 15 16
COLORFRICA
TOURISTIC AFRICAN PERFORMING ARTS CENTER
Year: 2021/2022S Spring
University: AAST Location: Seheil island ,Aswan Area:90,000 m2
“The Nile, forever new and old, Among the living and the dead, Its mighty, mystic stream has rolled.”
-Henry Wadsworth Longfellow-
Egypt is constantly searching for opportunities in economic cooperation between African countries This concern combined with the desire for strengthening the relations between Nile basin countries ,inspired the Nile Navigation Line Project. The project links Victoria lake with the Mediterranean sea through the Nile. The project aim was to design a project that will be built in one of the Nile basin countries as one of the points of the Nile navigation line in this country.
Programes used: Autocad 2D Revit Enscape Photoshop
4 4 4 A R C H I T E C T U R E D E S I G N 01
5
6 COLORFRICA
TOURISTIC AFRICAN PERFORMING ARTS CENTER
7 MASTER PLAN 1:l200
8 LAYOUT 1:400
POST COVID REHABILITATION CENTER
Year: 2021/2022 Fall
University: AAST Location: Manil Shihah, Abo El Nomros, Giza Governorate Area: 20,000m2
“Good mental health is absolutely fundamental to overall health and well-being.”
-Tedros Adhanom Ghebreyesus-
According to the World Health Organization,a mental health crisis is looming as the COVID-19 pandemic pushes people into isolation, poverty and anxiety, experts say. And as demand for help increases, the crisis has affected critical mental health services in 93% of countries, data from the World Health Organization shows. The aim was to design a rehabilitation center that fulfils the needs of the patients physically and mentally by returning them back to life.
Programes used: Autocad 2D Revit Photoshop
10 A R C H I T E C T U R E D E S I G N 02
Concept statment:
Thebuildingshouldfulfillthepostcovid-19patientssafeenvironmentbyachieving the enclosure for them and also to encourage them t return back to life through connection nodes that are opposite to their isolation (connecting the disconnected )
KEYWORDS:
1)Connection vs isolation
2)Enclosure(safe)
Testing connection, isolation & enclosure
Smoothing & directing the lines to nile to get max view & respect ventilation
Breaking the building by shifting & chinging the heights to get max view & ventilation from north
Form generation sketches
12
POST COVID
-
REHABILITA
layout 1:2000
P N F 13 Master plan 1:800
1st floor 1:1600
2nd floor 1:1600
3rd floor 1:1600 basment 1:1600
14
section A-A 1:800 15 Main elevation 1:200 Nile elevation 1:200 Section B-B 1:200
SHERATON NURSING HOME
Year:2020/2021 Spring
University: AAST Location: Sheraton,Cairo Area:5500 m2
“The loneliest moment in someone’s life is when they are watching their whole world fall apart, and all they can do is stare blankly.”
- F. Scott Fitzgerald-
Designing for the elderly is a critical decision as they became older, they became more sensitive and it became harder to understand their feelings. Experiencing different feelings, needs, and ideas affects the design because what we saw as a simple activity, is a huge effort for them. The aim is to design a nursing home that can accommodate different aging disease
Programes used: Autocad 2D Revit 3D max Vray materials Uneal engine
16 A R C H I T E C
U R E D E S I G N 03
T
17
Concept statement
The design should
1-increasethesenseofownershipfortheresidence throughofferingthemthe basic needs with simple tools to create a home like environment.. 2-increasethesenseofenablingforthemthroughofferingthemdifferentactivities with different experiences to help them use different senses.
3-includecommunitythroughofferingdaycareareafornon-residentstocreate interaction with other people and nature
PRECEDENTS
3-Residential Care Home Andritz / Dietger Wissounig Architekten
Architects: Dietger Wissounig Architekten Area: 6950 m² Year: 2015
I inspired the idea recessed & extruded from the elevation of this building also the grid structure used in it (The façade elements, each extending across two rooms, were prefabricated, their size determined by the maximum dimensions suitable for transport.)
elevation elevation
Precedents
1-Senior Citizens Residence Altenmarkt / Kadawittfeldarchitektur
SALZBURG, AUSTRIA
Architects: Kadawittfeldarchitektur
Area: 5100m²
Year: 2007
I inspired the idea of adding public aspect t the project by adding a day care area to increase the social connetion with the surrounding area (The structure of the senior citizens residence and the socialcenter is in line with the east-west axis that divides the site into two outdoorfacilitieswith differentspatialqualities.Thepublicareathatrisesbetweenthebuildingsforms an urban crossing for the senior citizens with the town citizens. The private garden (the “hortus conclusos”) provides the seniorcitizenswith avarietyof outdooractivitiesand,ifnecessary,constantsupervisionbythenursingstaff.)
2-HousingforElderlyPeopleinHuningue/DominiqueCoulon&associésRETIREMENT, HOUSING
plan and section and 3d shots for the building(1)
ANALYSIS
1-incraesing enabling through different activities distibuted throughout the whole building
HUNINGUE, FRANCE
Architects: Dominique Coulon & associés
Area: 3932m²
Year: 2018
I inspired the idea ofmovablewalls and partions from its iea ofmovable curtain to divide the room (This housing forelderlypeople is located on the banks ofthe Rhine.The exceptionalsituationofthesiteallowedustoturnthecommonareasandthehall towardstheriver:theresidentscanenjoythechoreographyofpassingboats. Theprogrammeconsistsoftwenty-fivefifty-square-meterhomes,arestaurant in three sections, a computer room, a hobbyworkshop, avegetable garden andapetanquefield.Eachdwellingunitfeaturesakitchenette,bathroomand sleeping area that can be closed offfrom the living space using a curtainin order to increase the sense of ownership for the residents)
plan to show the structure
2-including the community through adding daycare area. the main idea of the daycare area is including living area -dining area-and different activities most of the activities are in the ground floor to be shared between daycare visitors and residents of the building, however they can only access the activities of the ground floor and they don’t have access to other floors
plan §ion&3dshots for building (2)
2-increase the sense of ownership for the residence through offering them the basic needs with simple tools to create a home like environment is achived mainly in their rooms where they spend most of their time . customizable rooms through movable partitions is the main key to have their rooms as the home they like to live in. also in order to increase the ability of finding their way to their rooms easily , a diffrnrt customizable paint or print will be offered on their rooms doors and walls in corridor, also they can change the type of furniture and curtains in their room ..
18
SHERATON NURSING HOME
19 garbage area recieving area storage laundry storage for arts and crafts open office care givers chainging &toilet male pharmacy meeting for staff CAREGIVERS AREA kitchen & lounge yoga area arts&crafts manger secretary kitchenete &lounge storage daycare living area toilets male toilets female dining area for daycare storage janitor security room swimming pool janitor lounge for pool chainging room male chainging room female therapy room therapist clinic gym kitchen lobby lobby gardening storage office care givers chainging &toilet female admins toilet male admins toilet female Ground Floor Plan, 1:200
dining area& living area ROOM ROOM ROOM ROOM ROOM ROOM LOUNGE CAREGIVER ROOM TOILET MUSIC ROOM STORAGE OFFICE terrace ROOM LIVING AREA ROOM 2ND Floor Plan, 1:200 dining area& living area ROOM ROOM ROOM ROOM ROOM ROOM LOUNGE CAREGIVER ROOM TOILET READING&COMPUTER AREA STORAGE OFFICE terrace ROOM LIVING AREA ROOM HELP DESK
1ST Floor Plan, 1:200
dining area& living area ROOM ROOM ROOM ROOM ROOM ROOM LOUNGE CAREGIVER ROOM TOILET SUNROOM &AROMA THERAPY STORAGE OFFICE terrace ROOM LIVING AREA ROOM 3RD
Site Plan, 1:500
Floor Plan, 1:200
22
23 NORTH ELEVATION EAST ELEVATION 3D shot from model without material room room room room room room recieving area corridor corridor corridor corridor corridor corridor corridor corridor toilet toilet toilet daycare living area SECTION 1:200
SEHEIL POST COVID GOVERNEMENTAL HIGH SCHOOL
Year: 2020/2021 Fall
University: AAST Location: SEHEIL ISLAND, ASWAN Area:5500m2
“Of the 195 students, 138 (71%) indicated increased stress and anxiety due to the COVID-19 outbreak.”
-National library of medicine-
In the beginning of 2020, the novel Corona-virus disease (COVID-19) caused by the SARS-CoV-2 virus, became a public health emergency in the world and rapidly escalated into a global pandemic. Because the SARS-CoV-2 virus is highly contagious, physical distancing was enforced and indoor public spaces, including schools and educational institutions, were abruptly closed and evacuated to ensure civilian safety. Accordingly, educational institutions rapidly transitioned to remote learning. This forces students to stop the connections between each other leading to a high depression percentages through students. The aim of the design is to have a pro-
Programes used: Autocad 2D Revit Photoshop
24 A R C H I T E C T U R E D E S I G N 04
25
Concept statement :
1.Designingthemobility/thresholds/transitionalareaswithawaythatdecreasesthegatheringofstudentsinthemthroughsanitizationand temperaturemeasurementprocessbyorganizingtheflow,alsodecreasingthemovementstudentsthroughoutthewholeschool,bycreating hierarchy in movement that depends on -Creating a main datum that connects the whole school -creating threshold where students can sanitize and measure their temperature frequently -the minimum size of the main corridors doesn’t decrease 3.6 m(two person *1.8m) for covid19 safety -dividing classes into two different masses to decrease movement of students -open stairs -several entrances
2.providing the design with environmental solution that keep the ventilation in good state in order to decrease the effect ofcovid19 by -open corridors -different masses to shade each other -thick walls
DIRECTINGBUILDINGDATUMTONORTH:toget thebestofwinddirectionfornaturalventilation as in vernacular Nubian urban planning they planthestreetswidthwithrespecttotheheights of the buildings so that the streets are shaded throughout the day and air suction happened allover the village
- DESIGNING A GOOD VENTILATION FLOW : through the differentmassesandthroughthespinthatcreatesacontin uousflowfromnorthtosouththroughoutthewholeproject creating difference in airpressure in spaces throughwin dowsthatcreatessuctionofhotairreplacesbycoldnewair
-DESIGNINGDIFFERENTOUTDOORSPACESSOSTUDETSCANSITANDPLAYANDHAVETHEIRMORNING LINEFREELY,ALSOTEHREAREDIFFRENTBREAKINGLINESOFTREESANDVEGITATIONSTOWORKASSPLITERS FOR THIS SPACES TO DECREASE BIG GATHERINGS IN TIMES OF COVIDE-19
-RESPECTINGTHETOPOGRAPHY:throughdifferententrancesfrom differentlevels&increasingthehightofthegroundfloortobeableto use the different entrances
- INVOLVING OFCOMMUNITY: bymaking the schoolas an entertainment hub afterschool timesthroughusingthecourts,cafeteria,and multipurpose hall.
-RESPECTINGTHEENVIRONMENTALCONDITIONOFTHE AREA: using closable louvers in the facades that faces the southern sand storm& planting special trees as barrier also averticallovers in east andwest facades to break the high UV sun rays & using different trees to create buffer zones.
-different masses to create shaded areas forstudents & to shade on each other
- orientation ofeducationalspaces to north, east andwest.
-DECREASETHEMOVEMENT:differententrancestodecreasethecongestionwithdifferentverticalcirculationforstudentsandadmins/teacherswhilecreatingmaindatumtoconnectalltheentitiesoftheproject
-DESIGNINGCLASSESWITHGOODVENTILATION,LIGHT,AND SOCIAL DISTANCING
-RESPECTINGTEACHER’S PRIVACY: throgh giving them a sufficcient spacetodotheiractivities(separatecirculation/toilets/lounge),alsoby giving them a good view to nile
-SOCIALDISTANCING:Separatingstudentshorizontallyandverticallythroughseparatingclassesofsecondary and preparatory (horizontally) & separating each 2 year in floor (vertically).
26
SEHEIL POST COVID GOVERNEMENTAL HIGH SCHOOL
Master plan 1:800
29
Maspero Ferry Terminal And Business Incubators
Year: 2019/2020 Spring
University: AAST Location: Maspero,Cairo Area:30,000m2
“Unity is strength... when there is teamwork and collaboration, wonderful things can be achieved.”
-Mattie Stepanek-
The atom is the base unit for any element in our life. it achieves the aimed strength in unity through bonding,clustering,rigidity, stability , proximity,and many other actions by which variable martial are created.
Programes used: Autocad 2D 3D max Vray Photoshop
30 A R C H I T E C
R E D E S I G N 05
T U
31
Maspero Ferry Terminal And Business Incubators
Concept :The Atom
Relation To Strength In Unity
the atom is the base unit for any element in our life. it achieves the aimed strength in unitythrough bonding,clustering,rigidity,stability proximity,and many other actions bywhich variable martial are created.
Extracted Theme stability / tension /compression
Site Analysis
Site Place: Maspero Triangle Area: about 12000 m^2 the sit is divided into two parts one on the nile for the ferryterminaland one in maspero triangle for the incubators theyareconnectedwithabridgewheretherecreational facilities are built
Form Generation
Form development
zoning
Material Analysis
for incubators and bridge slab material used in slabes:precast concert+GRC material for core :RC system used: Vierendeel
for terminal : material used for ceiling cover :steel +glass+GRC material for columns :steel system used: trusses concept the sun screen used in different areas in the project is extracted from the concept used in the main entities of the project which was the atom. When these atoms are near each other a perforated area appeared which is used in the north facade .When these atoms are far from each other, a less void area appeared which is used in the south facade the skin is mainly consists of glass and concrete sunscree
Skin design analysis
32
33
COMMUNITY & ART CENTER
Year: 2018/2019 Spring
University: AAST Location:Roxy,Cairo Area:5250m2
“There is no power for change greater than a community discovering what it cares about.”
-Margaret J. Wheatley-
Heliopolis is an old known area in cairo that includes different architectural styles throughout the years. Starting from el Barron Emban building his new city in the dessert to the well known ancient buildings. The aim is to respond to this rich context and to reflect it in our designs.
Programes used: Autocad 2D Photoshop
34 A R C H I T E C T U R E D E S I G N 06
Concept statment
Thedesignshouldprovideasignificantnodethatstrengthenthesocialconnection and act as agora, giving positive energyto users ,while create avisualconnection with the surrounding context
Form Generation
theformrespects the site outline thencreatingcourtyard to increase social connection
then spliting the form to allow people to enter from different places
then spliting the form to allowpeople to enter from different places
the library is in higher floors to avoid noise
Analysis
Circulation is directed around the building in order to increase visual connectivity between users and residences
library and classes are directed to north
Cuboidwithpopingcolortoattractresidence andwork as socialhub and landmark forthe project(glasscube).theuseofyellowcoloris because its colorpsychologyofbringing joy and happiness and positive energyto users . Platforms towork as connection nodes and increasesocialconnectionphysicallyandvisually.
Plazaisconnectedtoincrease socialization between residence andworkers arund site Mass forpublic areas ( auditorium, execise rom ......) Massforprivateareas(classes studios,.....)
Thecuboidincreasevisualandphysical interactionbetweenusersthroughdifferent levels and open well stairs.
36
Masses and tower directed to ghernata
different entrances for the project
Location Skyline
Responding to context
COMMUNITY & ART CENTER
Almaza Public Park
Year:2021/2022 Fall
University: AAST Location: Almaza,Cairo Area:5000m2
“You can’t connect the dots looking forward; you can only connect them looking backwards”.
-Steve Jobs-
The aim is to design a public park as an attractor and/or connector in the provided location in Cairo. Your park is expected to promote the human health and wellbeing for the community. It is expected to respect the history of the area. Your design is to be vitalized with activities that are inspired by the history of the assigned site.
Programes used: Autocad 2D Photoshop
38 L A N D S C A P E D E S I G N 07
Geometric Layout 1:100
Almaza Public Park
Theme : Tram
Design statment:
Using the tram to creat connection between the different users
Inspirations: precedents & time line
Railyard Park ForAndWithThe
Community
Site Location : City of Rogers architect:RossBarneyArchitects concept:Rogers has been de fined by the railroad. uses the rail to create a strong dividing line. The park’s design ignores the rail as a barrier and stitch es the east and west together. The result is a series of plazas that can transform .These ver satileandflexiblespacescreate a new and distinct rhythm that extends beyond the park into adjacent streets.
Marina Linear Park, San Diego, CA, USA
Site Location : Marina Linear Park, San Diego, CA, USA architect:MarthaSchwartzPartners concept:he park, creates a visual and cultural link between the city and thewaterfrontThe two images that dominate the site are the linear dimension ofthe railroadyards and the grid of the city.
NAME PLAN ELEVATION INFORMATION WHY USED PICTURE English name: Flame Bottle Tree Botanical name: Brachychiton acerifolius English common name: Flame Bottle Tree Arabic common name: Group: Partly deciduous Size (height x width): - 15 x10m Flowering season: Spring Flower fruit: Red flower brown follicle Growth rate: Moderate Sun exposure: Full sun Water usage: Low PATH Citrus aurantium (Sour Orange) Botanical Citrus aurantium Citrus aurantium (Sour Orange) Botanical name: aurantium English common name: Sour Orange, Seville Orange Arabic common name: ش Group: Evergreen Size (height x width): - 10 –m Flowering season: Spring Flower/fruit: Fragrant white flower/orange fruit Growth rate: Moderate Sun exposure: Full sun Water usage: Moderate TO GIVE COLORFUL PLEASANT APPERANCE SPACIALLY FOR PAINTING WORKSHOP Phoenix canariensis (Canary Island Date) Botanical Phoenix canariensis Phoenix canariensis (Canary Island Date) Botanical name: Phoenix canariensis English common name: Canary Island Date Palm Arabic common name: ليخن يرانكلا Group: Evergreen Size (height x width): - 1815 Flowering season: Spring Flower/fruit: Yellow flower/orange drupe Growth rate: Sun exposure: FullWater usage: TO GIVE SHADING FOR THE AMPHITHEATER AND THE LEAVES ARE EASY TO BE REMOVED FROM WATER Bougainvillea (Bougainvillea Botanical name: Bougainvillea sp Bougainvillea (Bougainvillea sp Botanical name: Bougainvillea sp English common name: Bougainvillea Arabic common name: ةنونجم Group: Evergreen vine Size (height x width): 6.0m 2.0 - 3.0 Flowering season: May - October Growth rate: Moderate Sun exposure: Full sun Water usage: Low watering (Once a week) AS FOCI IN THRESHOLD Punica granatum (Pomegranate) Botanical name: Punica granatum Punica granatum (Pomegranate) Botanical name: Punica granatum English common name: Pomegranate Arabic common name: Group: Deciduous tree Size (height x width): -Flowering season: Spring and Flower fruit: Orange-red flowers red fruit Growth rate: Moderate Sun exposure: Full sun Water usage: Some watering once established (low to moderate) USED FOR SHADING & COLOR Schinus terebinthifolius (Brazilian Pepper) Botanical name: Schinus terebinthifolius English common name: Brazilian Pepper Tree Arabic common name: لفلف ضيرع Group: Evergreen Size (height x width): -10m Flowering season: Spring Flower/fruit: Insignificant white flower/red drupe in fall Growth rate: Moderate Sun exposure: Full-sun Water usage: Moderate USED FOR SHADING Sage (Salvia coccinea) Botanical name: Salvia coccinea Sage (Salvia coccinea) Botanical name: Salvia coccinea English common name: Sage Arabic common name: ةنيز ةيماريم Group: Evergreen shrub Size (height x width): 1.0 0.7m Flowering season: JuneSeptember Growth rate: Fast Sun exposure: Full sun, part shade Water usage: Little watering (once week) USED AS ORNEMENTAL BUSHES Lavender (Lavandula angustifolia) Lavender (Lavandula angustifolia) Botanical name: Lavandula angustifolia English common name: Lavender Arabic common name: ردنفلا Group: Evergreen shrub Size (height x width): 0.8m 0.8 Flowering season: MayGrowth rate: Moderate Sun exposure: Full sun Water usage: Little watering (once week) WERKSHOP AREAS ALSO TO GIVE THEM MOOD OF SMELL Cape Plumbago (Plumbago capensis) Cape Plumbago (Plumbago capensis) Botanical name: Plumbago capensis English common name: Cape Plumbago Arabic common name: نيمساي قرزأ Group: Evergreen vine or shrub Size (height x width): 3.0 1.5m Flowering season: May - October Growth rate: Fast Sun exposure: Full sun Water usage: Low watering (twice a month) AS AN EDGE FO AMPHITHEATER & MEDITATION Rosemary (Rosmarinus officinalis) Rosemary (Rosmarinus officinalis) Botanical name: Rosmarinus officinalis English common name: Rosemary Arabic common name: نابلاصح Group: Evergreen shrub Size (height x width): 1.0 0.7m Flowering season: March - May Growth rate: Fast Sun exposure: Full sun Water usage: Low watering (twice a month) AS EDGE IN BAZAR & EXERCISE AREA TO GIVE THEM PLEASANT SMELL NAME PLAN IMAGE CypressStone USED FOR FLOER BOXES Vancouver Bay Slabs STONES Flagstones TO EMPHASIZE ON MAIN PATH Flagstones IN EXHIBITION WOOD STAIRS ROUGH CONCRETE RUBBER RUBBER IN EXERCICE AREA STONES FOR WATER GRAVEL FRO THRESHOLDS INTERLOCKING FOR BAZAR
Choosen materials STUDIES NADA MOHAMMAD ABDUL-AZIZ ID:17105557 THEME TRAM STATEMENT: USE THE TRAM TO CREAT CONNECTION BETWEEN THE DIFFERENT USERS T-REX EXERCISE AREA EXERCISE AREA INSPIRATIONS AMPHITHER KIOSKS IN BAZAR EXHIBITION PAINTING WORKSHOP MEDITATION AREA STEPPED ROCK WATER
Section A-A 1:100
Section B-B 1:100 41
POST COVID REHABILITATION CENTER
Year: 2021/2022 Fall
University: AAST Location: Manil Shihah, Abo El Nomros, Giza Governorate Area:20,000m2
“Good mental health is absolutely fundamental to overall health and well-being.”
-Tedros Adhanom Ghebreyesus-
According to the World Health Organization,a mental health crisis is looming as the COVID-19 pandemic pushes people into isolation, poverty and anxiety, experts say. And as demand for help increases, the crisis has affected critical mental health services in 93% of countries, data from the World Health Organization shows. The aim was to design a rehabilitation center that fulfils the needs of the patients physically and mentally by returning them back to life.
Programes used: Autocad 2D Photoshop
42
L A N D S C A P E D E S I G N 08
43
Geometric Layout 1:800
Design Statment:
Thebuildingshouldfulfillthepostcovid-19patientssafeenvironmentbyachievingtheenclosureforthemandalsotoencouragethemtreturnbacktolifethroughcon nection nodes that are opposite to their isolation (connecting the disconnected )
Key words:
1)Connection vs isolation
2)Enclosure(safe)
POST COVID REHABILITATION CENTER Enlarged
1:100
detail
section A-A 1:100 section B-B1:100
C-C 1:100
section
Art Nouveau House
Year: 2020/2021 Spring University: AAST Location:Cairo Area:300m2
“Art is the flower... life the green leaf.”
-Charles Rennie Mackintosh-
The aim was to redesign the available area in order to provide adequate rooms to accommodate a family of 6 persons, by changing or developing the interior elements (walls, ceilings, windows, doors…etc.)
Programes used: Autocad 2D 3Dmax Vray Photoshop
46 I N T E R I O R D E S I G N 09
Mackintosh
Design theme
Nouveau
Art
Art Nouveau House
Charles Rennie
style Sample Board
48 ZONE 1 :MASTER BEDROOM
49 ZONE 2 : DINING ROOM
Biophilic office
Year: 2020/2021 Spring
University: AAST Location:Cairo Area:600m2
“To experience biophilia is to love a diversity that, as limitless as it is fragile, both haunts us and fills us with hope. ”
-Adam Leith Gollner-
Office design has changed dramatically over the past 20 years. A technological revolution has resulted in; a mobile workforce no longer tied to the bland office interiors of the past.
The aim is to redesign area of floor plan (is a one story building approx. 500 m2) to accomodate uers using one designing approach.
Programes used: Autocad 2D Revit 3Dmax Vray Photoshop
50
I N T E R I O R D E S I G N 10
51 Main Theme Biophilic Minor:geometry Biophilic office
52
Main elevation
53
section A-A section B-B
small restaurant
Year: 2020/2021 Spring
University: AAST Location:Cairo Area:300m2
Color helps to express light, not the physical phenomenon, but the only light that really exists, that in the artist’s brain.
-Henri Matisse-
The aim of the project to design a small restaurant that reflects the suitable colour effects and the suitable light sources and places according to the function of the space
Programes used: Autocad 2D 3Dmax Vray Photoshop
54
I N T E R I O R D E S I G N 11
Main Theme Biophilic Minor:geometry small restaurant
Redesigning Engineering Building (A) Cafeteria
Year: 2019/2020 Spring
University: AAST Location:Cairo
Color helps to express light, not the physical phenomenon, but the only light that really exists, that in the artist’s brain.
-Henri Matisse-
The aim of the project is to re-design the cafeteria to host more students who can’t find a suitable place to do their jobs ,specially architecture students who has special need in furniture pieces so they can draw & make models on.
Programes used: Autocad 2D 3Dmax Vray Photoshop
56
I N T E R I O R D E S I G N 12
Understanding the problem:
• The problem : There is no enough spaces to accommodate students who need to make the assignments or draw their projects
• Place selection: cafeteria building A
• Place justification: due to the mess in furniture setting, there is a wide waste space that can accommodate more students.
small restaurant
ARNE JACOBSEN THEMED HOUSE
Year: 2020/2021 Spring
University: AAST Location:Cairo
If architecture had nothing to do with art, it would be astonishingly easy to build houses, but the architect’s task - his most difficult task - is always that of selecting.
-Arne Jacobsen-
The aim of the project is to use architect’s master pieces & to study his style to design the interior space inspired from his work.
Programes used: 3D MAX & VRAY Autocad 2D
All th units & the whole scene is designed on 3d max from scratch
58
I N T E R I O R D E S I G N 13
ARNE JACOBSEN THEMED HOUSE
Execution Design 3
Year: 2021/2022 Fall
University: AAST Location:Cairo
The Sun does not realise how wonderful it is until after a room is made.
-Louis Kahn-
The aim of the project is to prepare all the tender documents and finding the suitable solutions for the clashes throughout the whole process
Programes used: Autocad 2D
60
E X E C U T I O N D E S I G 14
61 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-01-2022 GROUND FLOOR ARCHITECTURE PLAN D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 ROOM MATERIAL CODE LIST Floor Skirting WALL CEILING Granite GYPSUM CLADDING Marble Suspended False CeilingRaised floor HDF MDF 15cm. Marble Granite Plastic Paint Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE-Marble F.P.L +0.00 A-A B01 DESCRIPTION POWER HVAC LIGHT MDB FLOOR B-B B01 AR-101 01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D1 D1 D1 D1 D1 D1 D3 IINVADO 82*210CM D3 D4 DORMAKABA 160*210CM D4 D3 KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM G101 B01 A 3 D 1 CORRIDOR
62 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-01-2022 D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 ROOM MATERIAL CODE LIST A Floor Skirting WALL CEILING Granite GYPSUM CLADDING Marble Suspended False CeilingRaised floor HDF MDF 15cm. Marble Granite Plastic Paint Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE-Marble sp F.P.L +0.00 A-A B01 DESCRIPTION POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D1 D1 D1 D1 D1 D1 D3 IINVADO 82*210CM D3 D4 DORMAKABA 160*210CM D4 TOILET PAPER & TRASH TOILET PAPER &TRASH D3 KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM sp sp sp sp sp sp sp G101 B01 A 3 D 1 CORRIDOR GROUND FLOOR FURNITURE PLAN AR-102 02 BROTHER MFC-L2710DW Prints up to 30ppm GDI emulation Size: 410x398.5x318.5mm Weight:11.8kg BROTHER MFC-L2710DW Prints up to 30ppm GDI emulation Size: 410x398.5x318.5mm Weight:11.8kg alpha office furniture OC309HA Dimensions (mm) Seat Width: 670 Seat Depth: 625 Overall Height: 1140–1130 alpha office furniture 40FWT8 W: 800 D: 800 H: 740 £184 alpha office furniture MRD18L/R 1800 Desk W: 1200 D: 600 £228 alpha furniture ADBT36 W:3600 D:1200 Seats 12 £1300 alpha office furniture MRD18L/R 1800 Desk W: 1200 D: 600 £228 BROTHER MFC-L9570CDWT Same as MFC-L9570CDW, plus Includes 1 extra lower tray for 500 sheet Optional extra lower tray for 250/500 sheet Size: 495 526 682mm Weight: 42.6kg ALPHA FURNITURE AM4 Drawer H: 1321 W: 460 D: 620 £190 ALPHA FURNITURE AM4 4 Drawer H: 1321 W: 460 D: 620 £190 ALPHA FURNITURE S4C S4CA Dimensions (mm) Seat Width: 600 850 Seat Depth: 750 Overall Height: 720
63 0.6000 0.6000 1.2098 0.2000 OFFICE BUILDING AR-103 03 GROUND FLOOR PATTERN ARCHITECTURE PLAN D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE F.P.L +0.00 A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR 12 module floor box (le grand DOUBLE FLOOR MOUNTED SOCKET 220 V, 10 SCALE DRAWING TITLE DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-01-2022 ROOM MATERIAL CODE LIST Floor Skirting WALL CEILING Granite GYPSUM CLADDING Marble Suspended False CeilingRaised floor HDF MDF 15cm. Marble Granite Plastic Paint Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint-Marble DESCRIPTION WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D3 IINVADO 82*210CM D4 DORMAKABA 160*210CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM
64 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-1-2022 ARCHITECTURE LOOKING UP PLAN-AR-104 04 D1 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 S S S S S S S S S S S S S 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.2 3.00 2.2 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 SYMBOLS DESCRIPTION CEILING LOUD SPEAKER 6 W T.V. OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN DATA OUTLET FLOOR MOUNTED out grill in grill SMOKE DETECTOR
FIXTURE (4 LAMPS 40 WATT)
FIXTURE
15
WAY ONE
WAY TWO
WAY ONE
FLORESCENT
FLORESCENT
(4 LAMPS
WATT) FLORESCENT BULB (1 LAMP * 25 WATT) FLORESCENT FIXTURE (4 LAMPS 25 WATT) FLORESCENT FIXTURE (2 LAMPS 25 WATT) FILAMENT FIXTURE (1 LAMP * 150 WATT) ONE
GANG SWITCH ONE
GANG SWITCH TWO
GANG SWITCH
FLORESCENT FIXTURE (2 LAMPS 40 WATT)
FILAMENT FIXTURE (2 LAMP * 150 WATT)
FLORESCENT FIXTURE (2 LAMPS 15 WATT)
FLORESCENT FIXTURE (1 LAMPS 15 WATT)
nozzle
FLORESCENT FIXTURE (4 LAMPS 65 WATT) sprinkler camera FM 200
CO2 cylinder
65 1 2 3 1 2 3 G104 B01 B A 1 OPEN OFFICE G107 B01 B 1 A 1 SECRETARY 2MM VINYL 1CM TILES TERRAZZO 2CM MORTAR 6CM SAND 15CM S.O.G 2CM DPC 10CM PC BACKFIL 20CM RAISED FLOOR 15CM S.O.G 2CM DPC 10CM PC BACKFIL 1CM TILES TERRAZZO 2CM MORTAR 6CM SAND 7CM POROUS CONCRETE 2CM DPC 10CM RC SECTION A-A 18MM GRANITE TILES 2CM MORTAR 6CM SAND 15CM S.O.G 2CM DPC 10CM PC BACKFIL SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-01-2022 SECTIONS-AR-105 05 1 2 3 1 2 3 4 4 G108 B01 A 2 E ELECTRIC ROOM G108 B01 A 2 SERVER ROOM G104 B01 B A OPEN OFFICE G107 B01 E - A 3 LADIES TOILET 18MM MARBLE 2 CM MORTAR SAND 2CM DPC 15CM RC 1CM TILES TERRAZZO 2CM MORTAR 6CM SAND 7CM POROUS CONCRETE 2CM DPC 10CM RC SECTION B-B ROOM MATERIAL CODE LIST A 1 Floor Skirting D 2 WALL CEILING A 1 B Granite GYPSUM CLADDING Marble E Suspended False CeilingF Raised floor HDF 3 MDF 15cm. Marble 4 Granite Plastic Paint 5 Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint 2 3 Marble E DESCRIPTION WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D3 IINVADO 82*210CM D4 DORMAKABA 160*210CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM fighting sprinkler light tray server tray G101 B01 A 3 D 1 CORRIDOR electric junction light unite fighting sprinkler electric junction electric junction light unite light unite unite unite fighting sprinkler electric pipe electric electric pipe
66 SYMBOLS DESCRIPTION
LEGEND
SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD
17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT,
Campus Faculty of Engineering Department
Engineering
Environmental
KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR Tarek Kattaria E-101 6 23-01-2022 POWER SOCKET GROUND FLOOR PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 w.p WP 12 module floor box (le grand DOUBLE FLOOR MOUNTED SOCKET 220 V, D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE F.P.L +0.00 A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR w.p w.p WP WP WP WP w.p w.p PIPE INSIDE TWO WIRES
SINGLE SOCKET 220 V, 10 A DOUBLE SOCKET 220 V, 10 A
SINGLE SOCKET 220 V, 16 A SINGLE SOCKET 220 V, 16 A, WEATHER PROOF,1.20M HEIGHT SINGLE FLOOR MOUNTED SOCKET 220 V, 10 A DOUBLE FLOOR MOUNTED SOCKET 220 V, 10 A HAND DRYER OUTLET MAIN DISTRIBUTION BOARD SINGLE SOCKET 220 V, 10 A,1.20M HEIGHT DOUBLE SOCKET 220 V, 10 A,1.20M HEIGHT SINGLE SOCKET 220 V, 16 A,1.20M HEIGHT
ABDUL-AZIZ
Cairo
of Architectural
&
Design
SINGLE SOCKET 220 V, 10 A
DOUBLE SOCKET 220 V, 10 A
67
SYMBOLS DESCRIPTION
LEGEND
KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR Tarek Kattaria E-102 07 23-01-2022 POWER SOCKET GROUND LOOKING UP ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 w.p WP 12 module floor box (le grand DOUBLE FLOOR MOUNTED SOCKET 220 V, 10 D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE F.P.L +0.00 A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR
SINGLE SOCKET 220 V, 16 A SINGLE SOCKET 220 V, 16 A, WEATHER PROOF,1.20M HEIGHT SINGLE FLOOR MOUNTED SOCKET 220 V, 10 A DOUBLE FLOOR MOUNTED SOCKET 220 V, 10 A HAND DRYER OUTLET MAIN DISTRIBUTION BOARD SINGLE SOCKET 220 V, 10 A,1.20M HEIGHT DOUBLE SOCKET 220 V, 10 A,1.20M HEIGHT SINGLE SOCKET 220 V, 16 A,1.20M HEIGHT SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design
68 SCALE DRAWING TITLE DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR 23-01-2022 LOOKING UP LIGHT LEGEND FLORESCENT FIXTURE (4 LAMPS 40 WATT) FLORESCENT FIXTURE (4 LAMPS 15 WATT) FLORESCENT BULB (1 LAMP * 25 WATT) FLORESCENT FIXTURE (4 LAMPS 25 WATT) FLORESCENT FIXTURE (2 LAMPS 25 WATT) FILAMENT FIXTURE (1 LAMP 150 WATT) ONE WAY ONE GANG SWITCH ONE WAY TWO GANG SWITCH TWO WAY ONE GANG SWITCH FLORESCENT FIXTURE (2 LAMPS 40 WATT) FILAMENT FIXTURE (2 LAMP 150 WATT) FLORESCENT FIXTURE (2 LAMPS 15 WATT) FLORESCENT FIXTURE (1 LAMPS 15 WATT) FLORESCENT FIXTURE (4 LAMPS 65 WATT) TRAY CM LADDER TRAY 40 CM BETWEEN BOARDS 1:50 Tarek Kattaria E-103 08 ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE F.P.L +0.00 A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR
69 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty
Department
Engineering
Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA E-104 09 23-01-2021 LOOKING UP LOW CURRENT ARCHITECTURE PLAN LEGEND MDB FLOOR TRAY CM LADDER TRAY CM BETWEEN BOARDS SYMBOLS DESCRIPTION CEILING LOUD SPEAKER W T.V. OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN DATA OUTLET FLOOR MOUNTED SYMBOLS DESCRIPTION SMOKE DETECTOR HEAT DETECTOR LEGEND S WALL MOUNTED SMOKE DETECTOR V HEAT VARIABLE DETECTOR D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE-F.P.L +0.00 A-A B01 POWER HVAC LIGHT B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR 3.00 2.50 S S S S S S S S S S S S 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.2 3.00 2.2 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 PIPE INSIDE TWO WIRES
of Engineering
of Architectural
&
LEGEND
SYMBOLS DESCRIPTION
SINGLE SOCKET 220 V, 10
DOUBLE SOCKET 220 V, 10
SINGLE SOCKET 220 V, 16
SINGLE SOCKET 220 V, 16 A, WEATHER PROOF,1.20M HEIGHT
SINGLE FLOOR MOUNTED SOCKET 220 V, 10 A
DOUBLE FLOOR MOUNTED SOCKET 220 V, 10 A HAND DRYER OUTLET
MAIN DISTRIBUTION BOARD
SINGLE SOCKET 220 V, 10 A,1.20M HEIGHT
DOUBLE SOCKET 220 V, 10 A,1.20M HEIGHT
SOCKET 220 V, 16 A,1.20M
70
KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR Tarek Kattaria E-105 10 14-6-2021 LOW CURRENT GROUND FLOOR PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 w.p WP w.p w.p WP WP WP WP 12 module floor box (le grand DOUBLE FLOOR MOUNTED SOCKET 220 V, 10 A w.p w.p SYMBOLS DESCRIPTION CEILING LOUD SPEAKER W T.V. OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN DATA OUTLET FLOOR MOUNTED D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE F.P.L +0.00 A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR SMOKE DETECTOR S S S
SINGLE
HEIGHT SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design
71 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-01-2022 GROUND FLOOR FURNITURE PLAN D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 ROOM MATERIAL CODE LIST Floor Skirting WALL CEILING Granite GYPSUM CLADDING Marble Suspended False CeilingRaised floor HDF MDF 15cm. Marble Granite Plastic Paint Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE-Marble sp F.P.L +0.00 A-A B01 DESCRIPTION B-B B01 MECH-102 12 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D1 D1 D1 D1 D1 D1 D3 IINVADO 82*210CM D3 D4 DORMAKABA 160*210CM D4 TOILET PAPER TRASH TOILET PAPER &TRASH D3 KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM sp sp sp sp sp sp sp WATER SUPPLY FOR HANDLING UNIT riser water supply to tank 2'' riser from tank 2'' heater heater
72 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-01-2022 GROUND FLOOR DRAINAGE PLAN D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 ROOM MATERIAL CODE LIST A Floor Skirting WALL CEILING Granite GYPSUM CLADDING Marble Suspended False CeilingRaised floor HDF MDF 15cm. Marble Granite Plastic Paint Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE-Marble sp F.P.L +0.00 A-A B01 DESCRIPTION B-B B01 MECH-101 11 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D1 D1 D1 D1 D1 D1 D3 IINVADO 82*210CM D3 D4 DORMAKABA 160*210CM D4 TOILET PAPER & TRASH TOILET PAPER &TRASH D3 KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM sp sp sp waste stack 3'' soil stack 4'' sp sp sp sp DRAIN PIPE DRAIN PIPE DRAIN PIPE DRAIN PIPE
73
74 1 2 1 2 18MM MARBLE 2 CM MORTAR SAND 2CM DPC 15CM RC G106 B01 E - A 3 GENTS RESTROOM SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR : TAREK KATTARIA 22-11-2021 GROUND FLOOR FURNITURE PLAN ROOM MATERIAL CODE LIST A 1 Floor Skirting D 2 WALL CEILING A 1 B Granite GYPSUM CLADDING Marble E Suspended False CeilingRaised floor HDF 3 MDF 15cm. Marble 4 Granite Plastic Paint 5 Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint-2 3 Marble E DESCRIPTION AR-102 02 WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D3 IINVADO 82*210CM D4 DORMAKABA 160*210CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM 1 2 1 2 18MM MARBLE 2 CM MORTAR SAND 2CM DPC 15CM RC 1CM TILES TERRAZZO 2CM MORTAR 6CM SAND 7CM POROUS CONCRETE 2CM DPC 10CM RC 1CM TILES TERRAZZO 2CM MORTAR 6CM SAND 7CM POROUS CONCRETE 2CM DPC 10CM RC G107 B01 E - A 3 LADIES TOILET light unite electric pipe light unite electric pipe light unite electric pipe light unite electric pipe light unite electric pipe light unite electric pipe light unite electric pipe light unite electric pipe
75 G106 B01 E - A 3 GENTS RESTROOM 02 B01 03 B01 G107 B01 E - A 3 LADIES RESTROOM 18MM MARBLE 2 CM MORTAR SAND 2CM DPC 15CM RC SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 22-11-2021 GROUND FLOOR FURNITURE PLAN ROOM MATERIAL CODE LIST A 1 Floor Skirting D 2 WALL CEILING A 1 B Granite GYPSUM CLADDING Marble E Suspended False CeilingF Raised floor HDF 3 MDF 15cm. Marble 4 Granite Plastic Paint 5 Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint-2 3 Marble E DESCRIPTION AR-102 02 WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D3 IINVADO 82*210CM D4 DORMAKABA 160*210CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM 1CM TILES TERRAZZO 2CM MORTAR 6CM SAND 7CM POROUS CONCRETE 2CM DPC 10CM RC light unite electric pipe light unite electric pipe light unite electric pipe light unite electric pipe
76 G106 B01 E - A 3 GENTS RESTROOM 02 B01 03 B01 G107 B01 E - A 3 LADIES RESTROOM 18MM MARBLE 2 CM MORTAR SAND 2CM DPC 15CM RC SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR : TAREK KATTARIA 22-11-2021 GROUND FLOOR FURNITURE PLAN ROOM MATERIAL CODE LIST A 1 Floor Skirting D 2 WALL CEILING A 1 B Granite GYPSUM CLADDING Marble E Suspended False CeilingRaised floor HDF 3 MDF 15cm. Marble 4 Granite Plastic Paint 5 Pvc Cladding Demountoble Partitions pvc Suspended False Ceiling fire resistPlastic Paint Suspended False Ceiling moisture resistPlastic Paint-2 3 Marble E DESCRIPTION AR-102 02 WINDOW DESCRIPTION W1 W2 W3 W4 SOUTHERN STAR 57*65 CM SOUTHERN STAR 152*270 CM SOUTHERN STAR152*210 CM SOUTHERN STAR 152*65 CM DOOR DESCRIPTION D2 SFFECO 110*220CM D1 IINVADO 102*210CM D3 IINVADO 82*210CM D4 DORMAKABA 160*210CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM KNAUF 120*300*12.5 CM BRIGHT IMPERICAL 60*60*18MM BRIGHT IMPERICAL 600*600*18MM KAJARIA 600*600*18MM KAJARIA 60*60*18MM KNAUF 120*300*12.5 CM KAJARIA 60*60*18MM AVAYO 600*600*40MM TESA 600*600*12MM SALAG 2400*80*120MM SALAG 2500*80*100MM light unite electric pipe light unite electric pipe light unite electric pipe light unite electric pipe
77 INTAKE COMPACT UNITE DRAIN PIPE INTAKE COMPACT UNITE DRAIN PIPE TO THE OUTDOOR UNITE on roof INTAKE COMPACT UNITE TO THE OUTDOOR UNITE INTAKE COMPACT UNITE DRAIN PIPE TO THE OUTDOOR UNITE DRAIN PIPE water supply cold SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA 23-01-2022 GROUND FLOOR FURNITURE PLAN-MECH-107 17 D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE F.P.L +0.00 A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR
78 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA MECH-108 18 23-01-2022 VENTILATION LOOKING UP PLAN LEGEND FLORESCENT FIXTURE (4 LAMPS 40 WATT) FLORESCENT FIXTURE (4 LAMPS 15 WATT) FLORESCENT BULB (1 LAMP * 25 WATT) FLORESCENT FIXTURE (4 LAMPS 25 WATT) FLORESCENT FIXTURE (2 LAMPS 25 WATT) FILAMENT FIXTURE (1 LAMP 150 WATT) ONE WAY ONE GANG SWITCH ONE WAY TWO GANG SWITCH TWO WAY ONE GANG SWITCH FLORESCENT FIXTURE (2 LAMPS 40 WATT) FILAMENT FIXTURE (2 LAMP 150 WATT) FLORESCENT FIXTURE (2 LAMPS 15 WATT) FLORESCENT FIXTURE (1 LAMPS 15 WATT) FLORESCENT FIXTURE (4 LAMPS 65 WATT) SYMBOLS DESCRIPTION CEILING LOUD SPEAKER W T.V.
TRAY CM LADDER TRAY 40 CM BETWEEN BOARDS DUCT 16CM FAN 32*24CM FILTER 0.3*0.4 SILENCER 16*90 CM FIRE DAMPER 40*20CM DUCT 16CM FAN 32*24CM FILTER 0.3*0.4 SILENCER 16*90 CM FIRE DAMPER 40*20CM FAN 32*24CM FAN 32*24CM DUCT 16CM FIRE DAMPER 40*20CM FAN 32*24CM DUCT 16CM FIRE DAMPER 40*20CM D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE F.P.L +0.00 A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR in grill
OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN DATA OUTLET FLOOR MOUNTED
79 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA MECH-109 20 23-01-2022 FIRE FIGHTING PLAN LEGEND FLORESCENT FIXTURE (4 LAMPS 40 WATT) FLORESCENT FIXTURE (4 LAMPS 15 WATT) FLORESCENT BULB (1 LAMP * 25 WATT) FLORESCENT FIXTURE (4 LAMPS 25 WATT) FLORESCENT FIXTURE (2 LAMPS 25 WATT) FILAMENT FIXTURE (1 LAMP 150 WATT) ONE WAY ONE GANG SWITCH ONE WAY TWO GANG SWITCH TWO WAY ONE GANG SWITCH FLORESCENT FIXTURE (2 LAMPS 40 WATT) FILAMENT FIXTURE (2 LAMP 150 WATT) FLORESCENT FIXTURE (2 LAMPS 15 WATT) FLORESCENT FIXTURE (1 LAMPS 15 WATT) FLORESCENT FIXTURE (4 LAMPS 65 WATT) POWER LIGHT MDB FLOOR TRAY CM LADDER TRAY CM BETWEEN BOARDS SYMBOLS DESCRIPTION CEILING LOUD SPEAKER W T.V. OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN DATA OUTLET FLOOR MOUNTED D1 4 3 2 1 F.F.L +1.20 F.P.L +0.00 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE-F.P.L +0.00 A-A B01 POWER HVAC LIGHT B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 G101 B01 A 3 D 1 CORRIDOR SYMBOLS DESCRIPTION WATER SPRINKLER FM200 SYMBOLS DESCRIPTION SMOKE DETECTOR HEAT DETECTOR LEGEND S H WALL MOUNTED SMOKE DETECTOR V HEAT VARIABLE DETECTOR CO2 CYLINDER FIR FIGHTING BOX UP TO 25 M S S S S S S S S S S S S S
80 SCALE DRAWING TITLE OFFICE BUILDING DATE WORKING NADA MOHAMAMD ABDUL-AZIZ 17105557 1:50 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design NORTH DRAWING NO. SHEET NO. DOCTOR TAREK KATTARIA-AR-102 02 D1 G106 B01 A 2 F 1 MANAGER G104 B01 A 4 E 2 OPEN OFFICE G107 B01 A 2 F 1 SECRETARY G105 B01 B 1 A 1 STORAGE G101 B01 A 3 D 1 LOBBY G106 B01 EA 3 GENTS RESTROOM G107 B01 EA 3 LADIES RESTROOM G108 B01 A 2 E 2 ELECTRIC ROOM G105 B01 B 3 D 2 MEETING ROOM G108 B01 A 2 E 2 SERVER ROOM G105 B01 A 4 E 2 IT & PRINTING G105 B01 B 2 E 2 CCTV G105 B01 A 3 D 1 LOUNGE A-A B01 POWER HVAC LIGHT MDB FLOOR B-B B01 A-A B01 B-B B01 01 B01 02 B01 03 B01 04 B01 05 B01 A B01 B B01 D B01 C B01 A B01 B B01 D B01 C B01 01 B01 02 B01 03 B01 04 B01 05 B01 W1 W1 W1 W1 W2 W2 W3 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W4 W4 D2 D2 D1 D1 D1 D1 D1 D1 D3 D4 D3 INTAKE COMPACT UNITE DRAIN PIPE INTAKE COMPACT UNITE DRAIN PIPE TO THE OUTDOOR UNITE on roof INTAKE COMPACT UNITE TO THE OUTDOOR UNITE INTAKE COMPACT UNITE DRAIN PIPE TO THE OUTDOOR UNITE DRAIN PIPE water supply cold LADDER TRAY 40 CM BETWEEN BOARDS FAN 32*24CM DUCT 16CM FAN 32*24CM FILTER 0.3*0.4 SILENCER 16*90 CM FIRE DAMPER 40*20CM DUCT 16CM FAN 32*24CM FILTER 0.3*0.4 SILENCER 16*90 CM FIRE DAMPER 40*20CM FAN 32*24CM FAN 32*24CM DUCT 16CM FIRE DAMPER 40*20CM FAN 32*24CM DUCT 16CM FIRE DAMPER 40*20CM S S S S S S S S S S S S S riser water supply to tank 2'' riser from tank 2'' heater heater S 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.20 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.2 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.2 3.00 2.2 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 3.00 2.20 SYMBOLS DESCRIPTION CEILING LOUD SPEAKER W T.V. OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN DATA OUTLET FLOOR MOUNTED out grill in grill SMOKE DETECTOR FLORESCENT FIXTURE (4 LAMPS * 40 WATT)
FIXTURE (4 LAMPS * 15 WATT)
BULB (1 LAMP 25 WATT)
FIXTURE (4 LAMPS * 25 WATT)
FIXTURE (2 LAMPS * 25 WATT) FILAMENT FIXTURE (1 LAMP * 150 WATT)
WAY ONE GANG SWITCH ONE WAY TWO GANG SWITCH
WAY ONE GANG SWITCH
FIXTURE (2 LAMPS * 40 WATT)
FIXTURE (2 LAMP * 150 WATT)
FIXTURE (2 LAMPS * 15 WATT)
FIXTURE (1 LAMPS * 15 WATT)
FIXTURE (4 LAMPS * 65 WATT) sprinkler camera FM 200 nozzle CO2 cylinder 17-1-2022 COMPOSITE PLAN PIPE INSIDE TWO WIRES
FLORESCENT
FLORESCENT
FLORESCENT
FLORESCENT
ONE
TWO
FLORESCENT
FILAMENT
FLORESCENT
FLORESCENT
FLORESCENT
81
Execution Design 2
Year: 2020/2021 Spring
University: AAST Location:Cairo
The Sun does not realise how wonderful it is until after a room is made.
-Louis Kahn-
The aim of the project is to prepare all the tender documents and finding the suitable solutions for the clashes throughout the whole process
Programes used: Autocad 2D
82
82
E X E C U T I O N D E S I G 14
83 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY GE-00 01 14-6-2021 COVER ROXY CULTURE CENTER ROXY CULTURE CENTER - B01
84 OFFICE BIULDING (B01) 05 AR-102 FIRST FLOOR PLAN 04 AR-101 GROUND FLOOR PLAN GENERAL SHEET NO. DRAWING NO. DRAWING TITLE 03 GE-02 GENERAL NOTES , ABBREVIATIONS 02 GE-01 INDEX OF ALL PACKAGE DRAWING LIST BUILDINGS ARCHITECTURAL SHEET NO. DRAWING NO. DRAWING TITLE LEGEND & MATERIAL SYMBOLS . DEPARTMENT OF ARCHITECTURE AASTMT EXECUTION 2 01 GE-00 COVER ARCHITECTURAL SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY GE-01 01 14-6-2021 INDEX OF ALL PACKAGE DRAWING LIST ROXY CULTURE CENTER - B01 06 AR-103 GROUND FLOOR FURNITURE PLAN 07 AR-104 FIRST FLOOR FURNITURE PLAN 08 AR-105 GROUND FLOOR LOOKING UP PLAN 09 AR-106 FIRST FLOOR LOOKING UP PLAN 10 SE-101 GROUND FLOOR STRUCTURAL PLAN OFFICE BIULDING (B01) BUILDINGS STRUCURAL 11 SE-102 FIRST FLOOR STRUCTURAL PLAN OFFICE BIULDING (B01) BUILDINGS ELECTRICAL 12 E-101 LIGHTING SYSTEM GROUND FLOOR 13 E-102 LIGHTING SYSTEM FIRST FLOOR 14 E-103 LOW CURRENT GROUND FLOOR 15 E-104 LOW CURRENT FIRST FLOOR 16 E-105 POWER SOCKET GROUND FLOOR 17 E-106 POWER SOCKET FIRST FLOOR OFFICE BIULDING (B01) BUILDINGS LAYOUT 22 AS-101 LAYOUT OFFICE BIULDING (B01) BUILDINGS FIRE FIGHTING 18 FF-101 DETECTORS GROUND FLOOR PLAN 19 FF-102 DETECTORS FIRST FLOOR 20 FF-103 SPRINKLERS GROUND FLOOR 21 FF-104 SPRINKLERS FIRST FLOOR OFFICE BIULDING (B01) BUILDINGS HVAC 23 HVAC-101 SPLIT GROUND FLOOR PLAN 24 HVAC-102 SPLIT FIRST FLOOR PLAN 25 HVAC-103 SPLIT ROOF FLOOR PLAN 26 HVAC-104 CENTRAL GROUND FLOOR PLAN 27 HVAC-105 CENTRAL FIRST FLOOR PLAN 28 HVAC-106 CENTRAL ROOF FLOOR PLAN OFFICE BIULDING (B01) BUILDINGS COMPOSITE 29 CO-001 COMPOSITE GROUND FLOOR PLAN 30 CO-002 COMPOSITE FIRST FLOOR PLAN
GENERAL NOTES :
1. ALL DIMENSIONS SHOWN HEREIN ARE IN METERS AND ALL LEVELS
ARE IN METERS UNLESS OTHERWISE NOTED.
2. DON'T SCALE DRAWINGS, DIMENSIONS GIVEN SHALL GOVERN.
3. LEVEL 0.00 SHOWN IN ARCHITECTURE DRAWING'S EQUATES TO LEVEL 0.00
SHOWN IN LANDSCAPE DRAWING'S.
4. VERIFY ALL SIZES / DIMENSIONS OF DOORS, WINDOWS AND WINDOW SCREEN
DRAWINGS PRIOR TO FABRICATION AND INSTALLATION.
ENGINEERING DRAWINGS SHALL BE THE MAIN CONTRACTOR RESPONSIBILITY
PRIOR TO WORK COMMENCEMENT.
6. ALL TOILET AND KITCHEN AREAS SHALL BE PROVIDED WITH WATER PROOFING
MEMBRANE LAID ON TOP OF STRUCTURE SLAB AND EXTENDED 200MM. HIGH
ON WALL ABOVE FINISH FLOOR LEVEL.
DRAWINGS AND ALL OTHER. 7. OBTAIN ARCH. APPROVAL FOR ALL INTERIOR DESIGN SCHEMES BEFORE EXECUTION
OPENINGS ON THE JOB SITE AND CONTRACTOR SHALL SUBMIT SHOP AND EXTERIOR PAINT COLOR SHALL BE SELECTED BY THE ARCHITECT.
THE CONTRACTOR BEFORE THE FINAL EXECUTION.
8. ALL SHOP DRAWINGS, SAMPLES, CATALOG CUTS ETC.. TO BE APPROVED BY THE 10. THE CONTRACTOR SHALL SUBMIT SAMPLES & SHOP DRAWINGS FOR ALL
11. WALL DIMENSIONS ARE VARIABLE , FROM UP TO 40cm THE CONTRACTOR SHOULD EXTERIOR CLADDING FINISHES PRIOR TO ANY INSTALLATIONS. FOLLOW ARCHITECT'S DESIGN.
SHOP DWGS FOR APPROVAL.
13. REFER TO CONSULTING ARCHITECT'S FOR THE FINAL SELECTION OF DESIGN ,TYPES, SAMPLES ,CATALOGUE WITH SHOP DRAWING FOR ARCHITECT'S APPROVAL.
COLORS ,TEXTURES , AND FINISHES OF ALL EXTERIOR FLOOR FINISHES , STONE BASE CLADDING , STONE COPPING , AND ACCENT. CONTRACTOR TO PROVIDE
14. REFER TO CONSULTING ARCHITECT'S FOR THE FINAL SELECTION OF TYPES,DESIGN ELEVATION ,SECTION W./DIMENSIONS AND FINISHES FOR ARCHITECT'S APPROVAL.
AND FINISHES FOR ALL EXTERNAL WOOD ,ACCENT AND ELEMENTS ,CONTRACTOR TO, PROVIDE SAMPLES ,CATALOGUE WITH SHOP DRAWINGS ,SHOWING THE UNITS
85
WORKING
KEY PLAN
ALY
GENERAL NOTES ABBREVIATIONS LEGEND
PART PLAS FINISH FLOOR LEVEL FFL F P O PLASTER PARTITION W W MEZZ DIM DIMENSION CONCRETE DETAIL DRAWING DOOR DWG DET D D CMU MEZZANINE T AR ARCHITECTURAL CERAMIC CER C BUILDING BLDG B ABBREVIATIONS ALUMINUM ALUM A RM RC R WINDOW REINFORCED ROOM CONCRETE MASONRY UNIT SMALL SCALE ) LARGE SCALE ) SCALE USED DRAWING IDENTIFICATION (LETTERS FOR PLANS & ELEVATIONS, NUMBER FOR SECTIONS & DETAILS) SHEET TAKEN SHEET SHOWN GRID LINE LEGEND AND SYMBOLS <VGRID> <HGRID> AXIS NO. BUILDING NO. MATERIAL SYMBOLS BLOCK WORK EARTH TITLES GRID LINES 1 B00 A B00 SHEET-NO A TAKEN1 TOP-TITLE BOTTOM-TITLE SCALE ROOM B00 F R0N B W C NAME EL. ±0.00 LVL X.X.X. LEGEND AND SYMBOLS ADMIN ADMINSTRATION AFF ABOVE FINISH FLOOR CEMENT CEM CEILING CLG COLUMN COL FIRE ZONES FZ OFF OFFICE PTG PLANTING T.O.S.S TOP OF PLANTER CONCRETE ELEVATION EL E DOOR IDENTIFICATION FIRST F M R ROOF S SECT S SECTION SECOND GE GENERAL GROUND GLASS GRD GLS G DEPARTMENT OF ARCHITECTURE AASTMT EXECUTION 2 ROXY CULTURE CENTER - B01 12. DETAILS
SHALL SUBMIT 9. CONTRACTOR WILL
EQUIPMENT
5. COORDINATION
SCALE DRAWING TITLE DATE
NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design
NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD
GE-02 03 14-6-2021
& MATERIAL SYMBOLS
SHOWN ARE FOR DESIGN INTENT ONLY, CONTRACTOR
PROVIDE SUITABLE SIZE ACCESS PANELS IN CLG. FOR
CONTRACTOR ( REFER TO PLUMBING & MECHANICAL DWG'S FOR LOCATION).
BETWEEN ARCHITECTURAL
86 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-101 04 14-6-2021 GROUND FLOOR PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 34 33 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 B 1 A 1 MANAGER G107 B01 B 1 A SECRETARY G105 B01 B B STAIRS G102 B01 B A 1 FOYER G101 B01 B A LOBBY G106 B01 C - B 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 - 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 ROXY CULTURE CENTER - B01 D1 4 2 4 2 F.P.L +0.00 D2 ROOM MATERIAL CODE LIST 1 Floor Skirting C D 2 WALL CEILING A 1 B C D Granite Ceramic Tiles Pvc Tiles Epoxy Paints Epoxy Paint Plastic Paint Ceramic Tiles Marble Ceramic Tiles Suspended False CeilingMoquette G HDF H Cement Tiles 3 MDF 15cm. Marble 4 Granite Plastic Paint 5 Cement Tiles Pvc Cladding Demountoble Partitions G105 B01 B 1 A 1 MEETING ROOM D1 D1 D1
87 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-102 05 14-6-2021 FIRST FLOOR PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 1 LIBRARY G204 B01 B E CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B 3 C COMPITER LAB 1 D1 ROXY CULTURE CENTER - B01 G202 B01 B A OPEN WORKSHOP 11 10 7 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D1 D1 D5 34 33 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 ROOM MATERIAL CODE LIST A 1 Floor Skirting B C D 2 WALL CEILING A 1 B C D Granite Ceramic Tiles Pvc Tiles Epoxy Paints Epoxy Paint Plastic Paint Ceramic Tiles Marble E Ceramic Tiles Suspended False CeilingMoquette G HDF H Cement Tiles 3 MDF 15cm. Marble 4 Granite Plastic Paint 5 Cement Tiles Pvc Cladding Demountoble Partitions G104 B01 B 1 A 1 LOBBY G211 B01 B C STUDIO G106 B01 C - B MEN TOILET G107 B01 C - B 1 WOMEN TOILET D1 D1
88 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-103 06 14-6-2021 GROUND FLOOR FURNITURE PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 11 10 1 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 34 33 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 1 1 MANAGER G107 B01 1 1 SECRETARY G105 B01 B B STAIRS G102 B01 B A FOYER G101 B01 B 1 A 1 LOBBY G106 B01 C - B MEN TOILET G107 B01 C - B WOMEN TOILET G108 B01 C - B SERVICE G109 B01 C - B 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 4 3 3 F.P.L +0.00 D2 G105 B01 1 1 MEETING ROOM D1 D1 D1
89 SCALE : DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-104 07 14-6-2021 FIRST FLOOR FURNITURE PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 B 1 C 1 LIBRARY G204 B01 B E CLASSROOM 2 G203 B01 B 4 E 1 CLASSROOM 1 G210 B01 B C COMPITER LAB 1 D1 G211 B01 3 1 COMPITER LAB 1 D1 G202 B01 B A OPEN WORKSHOP 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D1 D1 D5 34 33 G205 B01 2 1 STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 B A LOBBY G211 B01 B C STUDIO G106 B01 C - B MEN TOILET G107 B01 C - B WOMEN TOILET D1 D1
90
5.10 3.60
3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 SCALE DRAWING TITLE DATE : WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR : AMGAD ALY AR-105 08 14-6-2021 GROUND FLOOR LOOKING UP PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 1 2 3 4 5 6 6 7 7 1 2 4 5 5 1 1 1 1 2 2 3 4 4 5 5 6 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 A F AUDITORIUM G104 B01 1 1 OPEN OFFICE G106 B01 B A MANAGER G107 B01 B A SECRETARY G105 B01 B 2 1 STAIRS G102 B01 1 1 FOYER G101 B01 B 1 A 1 LOBBY G106 B01 - 1 MEN TOILET G107 B01 C - B 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 C - B KITCHEN G1010 B01 3 G 1 CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 F.P.L +0.00 D2 G105 B01 B A MEETING ROOM D1 D1 D1
5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60
5.10
91
5.10
5.10 3.80 5.10
5.10 3.80 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-106 09 14-6-2021 FIRST FLOOR LOOKING UP PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 B C LIBRARY G204 B01 4 1 CLASSROOM G203 B01 B E CLASSROOM 1 G210 B01 B 3 C 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 1 OPEN WORKSHOP D1 D1 D5 G205 B01 B B 1 STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 A 1 LOBBY G211 B01 3 1 STUDIO G106 B01 C - 1 MEN TOILET G107 B01 - 1 WOMEN TOILET D1 D1
5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.60 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80 5.10 3.80
3.80
3.80
92 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 SCALE DRAWING TITLE DATE : WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR : AMGAD ALY ST-101 10 14-6S-2021 GROUND FLOOR STRUCTURE PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01
93 1 2 2 3 4 4 5 6 6 7 2 3 4 5 5 6 1 1 1 2 2 2 3 4 4 5 5 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 A F AUDITORIUM G104 B01 B 1 A 1 OPEN OFFICE G106 B01 B A MANAGER G107 B01 B A SECRETARY G105 B01 B B 1 STAIRS G102 B01 B 1 1 FOYER G101 B01 B A LOBBY G106 B01 - 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 - 1 SERVICE G109 B01 - B 1 KITCHEN G1010 B01 B 3 G 1 CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 F.P.L +0.00 D2 G105 B01 B A MEETING ROOM D1 D1 D1 LEGEND FLORESCENT FIXTURE (4 LAMPS * 40 WATT) FLORESCENT FIXTURE (4 LAMPS * 15 WATT) FLORESCENT BULB (1 LAMP 25 WATT) FLORESCENT FIXTURE (4 LAMPS * 25 WATT) FLORESCENT FIXTURE (2 LAMPS * 25 WATT) FILAMENT FIXTURE (1 LAMP 150 WATT) ONE WAY ONE GANG SWITCH ONE WAY TWO GANG SWITCH TWO WAY ONE GANG SWITCH FLORESCENT FIXTURE (2 LAMPS * 40 WATT) FILAMENT FIXTURE (2 LAMP 150 WATT) FLORESCENT FIXTURE (2 LAMPS * 15 WATT) FLORESCENT FIXTURE (1 LAMPS * 15 WATT) FLORESCENT FIXTURE (4 LAMPS * 65 WATT) SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY E-101 12 14-6-2021 LIGHTING GROUND FLOOR ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 GENERAL NOTES: GOVERNMENT ENERGY GENERATOR & GOVERNMENT ENERGY
94 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 A 1 OPEN WORKSHOP D1 D1 D5 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1 LEGEND FLORESCENT FIXTURE
LAMPS
40
FLORESCENT FIXTURE (4 LAMPS * 15 WATT) FLORESCENT BULB (1 LAMP 25 WATT) FLORESCENT FIXTURE (4 LAMPS * 25 WATT) FLORESCENT FIXTURE (2 LAMPS * 25 WATT) FILAMENT FIXTURE (1 LAMP * 150 WATT) ONE WAY ONE GANG SWITCH ONE WAY TWO GANG SWITCH TWO WAY ONE GANG SWITCH FLORESCENT FIXTURE (2 LAMPS * 40 WATT) FILAMENT FIXTURE (2 LAMP * 150 WATT)
FIXTURE (2 LAMPS
15
FIXTURE (1 LAMPS
FIXTURE
SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY E-102 13 14-6-2021 LIGHTING FIRST FLOOR ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 GENERAL NOTES: GOVERNMENT ENERGY GENERATOR & GOVERNMENT ENERGY
(4
*
WATT)
FLORESCENT
*
WATT) FLORESCENT
* 15 WATT) FLORESCENT
(4 LAMPS * 65 WATT)
95 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 B 1 A 1 MANAGER G107 B01 B 1 A SECRETARY G105 B01 B B STAIRS G102 B01 B A 1 FOYER G101 B01 B A LOBBY G106 B01 C - B 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 - 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 F.P.L +0.00 D2 G105 B01 B 1 A 1 MEETING ROOM D1 D1 D1 SYMBOLS DESCRIPTION CEILING LOUD SPEAKER 6 W T.V. OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN LEGEND DATA OUTLET FLOOR MOUNTED SCALE DRAWING TITLE LABOR UNION BUILDING- B01 DATE WORKING DALIA AYMAN MOHAMED 9103149 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY E-103 14 14-06-2013 LOW CURRENT GROUND FLOOR PLAN
96 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 A 1 OPEN WORKSHOP D1 D1 D5 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1 SYMBOLS DESCRIPTION CEILING LOUD SPEAKER W T.V. OUTLET DATA SHOW OUTLET TELEPHONE OUTLET DATA OUTLET WIRELESS DATA OUTLET MICROPHONE OUTLET VOLUME CONTROL EXIT SIGN LEGEND DATA OUTLET FLOOR MOUNTED SCALE DRAWING TITLE LABOR UNION BUILDING- B01 DATE WORKING DALIA AYMAN MOHAMED 9103149 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY E-104 15 14-06-2013 LOW CURRENT FIRST FLOOR PLAN
SINGLE FLOOR MOUNTED SOCKET 220 V, 10 DOUBLE FLOOR MOUNTED SOCKET 220 V, 10 HAND DRYER OUTLET
MAIN DISTRIBUTION BOARD
SINGLE SOCKET 220 V, 10 A,1.20M HEIGHT
DOUBLE SOCKET 220 V, 10 A,1.20M HEIGHT SINGLE SOCKET 220 V, 16 A,1.20M HEIGHT
97 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 34 33 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 B 1 A 1 MANAGER G107 B01 B 1 A SECRETARY G105 B01 B B STAIRS G102 B01 B A 1 FOYER G101 B01 B A LOBBY G106 B01 C - B 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 - 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 F.P.L +0.00 D2 G105 B01 B 1 A 1 MEETING ROOM D1 D1 D1 SYMBOLS DESCRIPTION
LEGEND
SINGLE SOCKET 220 V, 10 A DOUBLE SOCKET 220 V, 10 A
SINGLE SOCKET 220 V, 16 A w.p SINGLE SOCKET 220 V, 16 A, WEATHER PROOF,1.20M HEIGHT
w.p
SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering
Engineering
Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY E-105 16 14-6-2021 POWER SOCKET GROUND FLOOR ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 w.p w.p WP WP WP
Department of Architectural
&
SOCKET 220 V, 10 A,1.20M HEIGHT DOUBLE SOCKET 220 V, 10 A,1.20M HEIGHT SINGLE SOCKET 220 V, 16 A,1.20M HEIGHT
98 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 A 1 OPEN WORKSHOP 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D1 D1 D5 34 33 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1 w.p SYMBOLS DESCRIPTION SINGLE SOCKET 220 V, 10 A DOUBLE SOCKET 220 V, 10 A LEGEND SINGLE SOCKET 220 V, 16 A w.p SINGLE SOCKET 220 V, 16 A, WEATHER PROOF,1.20M HEIGHT SINGLE FLOOR MOUNTED SOCKET 220 V, 10 DOUBLE FLOOR MOUNTED SOCKET 220 V, 10
DRYER OUTLET
DISTRIBUTION BOARD
SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology
Maritime Transport AASTMT,
Campus Faculty
Engineering
KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY E-106 17 14-6-2021 POWER SOCKET FIRST FLOOR ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01
HAND
MAIN
SINGLE
&
Cairo
of
Department of Architectural Engineering & Environmental Design
99 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 34 33 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 B 1 A 1 MANAGER G107 B01 B 1 A SECRETARY G105 B01 B B STAIRS G102 B01 B A 1 FOYER G101 B01 B A LOBBY G106 B01 C - B 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 - 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 4 2 4 2 F.P.L +0.00 D2 G105 B01 B 1 A 1 MEETING ROOM D1 D1 D1 S S S S S S S S S S S S S S S S S S SYMBOLS DESCRIPTION SMOKE DETECTOR HEAT FIXED DETECTOR LEGEND S H WALL MOUNTED SMOKE DETECTOR H S HEAT VARIABLE DETECTOR SCALE DRAWING TITLE LABOR UNION BUILDING- B01 DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY FF-101 18 14-06-2021 DETECTOR GROUND FLOOR PLAN
100 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 A 1 OPEN WORKSHOP 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D1 D1 D5 34 33 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1 S S S S S S S S S S S S S S S S S S S S S S S SYMBOLS DESCRIPTION SMOKE DETECTOR HEAT DETECTOR LEGEND S WALL MOUNTED SMOKE DETECTOR SCALE DRAWING TITLE LABOR UNION BUILDING- B01 DATE WORKING 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY FF-102 19 14-06-2021 DETECTOR FIRST FLOOR PLAN V HEAT VARIABLE DETECTOR NADA MOHAMMAD ABDUL-AZIZ 17105557
101 SYMBOLS DESCRIPTION FOAM WATER SPRINKLER CO2 FM 200 SPRINKLER NORTH 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 34 33 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 B 1 A 1 MANAGER G107 B01 B 1 A SECRETARY G105 B01 B B STAIRS G102 B01 B A 1 FOYER G101 B01 B A LOBBY G106 B01 C - B 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 - 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 4 2 4 2 F.P.L +0.00 D2 G105 B01 B 1 A 1 MEETING ROOM D1 D1 D1 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN DRAWING NO. SHEET NO. DOCTOR AMGAD ALY FF-103 20 21-4-2021 GROUND FLOOR SPRINKLERS PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01
102 0.2000 0.4000 SYMBOLS DESCRIPTION FOAM WATER SPRINKLER CO2 FM 200 SPRINKLER FOAM WATER SPRINKLER WALL MOUNTED NORTH D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 A 1 OPEN WORKSHOP 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D1 D1 D5 34 33 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN DRAWING NO. SHEET NO. DOCTOR AMGAD ALY FF-104 21 21-4-2021 SPRINKLERS FIRST FLOOR PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01
103
104 NORTH 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 34 33 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 B 1 A 1 MANAGER G107 B01 B 1 A SECRETARY G105 B01 B B STAIRS G102 B01 B A 1 FOYER G101 B01 B A LOBBY G106 B01 C - B 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 - 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 4 2 4 2 F.P.L +0.00 D2 G105 B01 B 1 A 1 MEETING ROOM D1 D1 D1 LEGEND SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN DRAWING NO. SHEET NO. DOCTOR AMGAD ALY HVAC-01 23 14-6-2021 SPLIT GROUND FLOOR ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 FAN COIL UNIT CONDENSING UNIT
105 NORTH D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 A 1 OPEN WORKSHOP 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D1 D1 D5 34 33 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1 LEGEND FAN COIL UNIT CONDENSING UNIT SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN DRAWING NO. SHEET NO. DOCTOR AMGAD ALY HVAC-02 24 14-6-2021 SPLIT FIRST FLOOR ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01
106
01
15 B01
SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY HVAC-03 25 1-3-2021 SPLIT ROOF PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 LEGEND FAN COIL UNIT CONDENSING UNIT
EL. +13.70 GR T.O.C. EL. +10.20 GR T.O.C.
B01
01 B01 15 B01
107 SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY AR-102 05 14-6-2021 FIRST FLOOR PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 ROXY CULTURE CENTER - B01 G202 B01 B 1 A 1 OPEN WORKSHOP 11 10 20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 D1 D1 D5 34 33 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 ROOM MATERIAL CODE LIST 1 Floor Skirting C D 2 WALL CEILING A 1 B C D Granite Ceramic Tiles Pvc Tiles Epoxy Paints Epoxy Paint Plastic Paint Ceramic Tiles Marble Ceramic Tiles Suspended False CeilingMoquette G HDF H Cement Tiles 3 MDF 15cm. Marble 4 Granite Plastic Paint 5 Cement Tiles Pvc Cladding Demountoble Partitions G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1
108 D2 D1 D1 D5 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 D2 D2 D2 D2 D1 D1 D1 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G103 B01 3 1 AUDITORIUM G104 B01 B A OPEN OFFICE G106 B01 B 1 A 1 MANAGER G107 B01 B A SECRETARY G105 B01 B B STAIRS G102 B01 B A 1 FOYER G101 B01 B A LOBBY G106 B01 C - B 1 MEN TOILET G107 B01 - 1 WOMEN TOILET G108 B01 C - B 1 SERVICE G109 B01 - 1 KITCHEN G1010 B01 B G CAFETERIA F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 F.P.L +0.00 D2 G105 B01 B 1 A 1 MEETING ROOM D1 D1 D1 Main duct 180*90 cm 163*90 cm Reduction 122*90 cm Reduction 86*85 cm Reduction 65*75 cm Branch Main duct 125*63 cm 114*63 cm Reduction 65*55 cm Reduction 20*30 cm Branch 20*30 cm Branch 20*30 cm Branch 20*30 cm Branch 20*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Sub Branch Main duct 146*73 cm 73*134 cm Reduction 75*65 cm Reduction 30*54 cm Branch 25*33 cm Branch 30*54 cm Branch 30*54 cm Branch 30*54 cm Branch 30*54 cm Branch 30*54 cm Branch 25*33 cm Branch 25*33 cm Branch 25*33 cm Branch 25*33 cm Branch 25*33 cm Branch SCALE DRAWING TITLE LABOR UNION BUILDING- B01 DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY HVAC-04 26 14-06-2021 CENTRAL GROUND FLOOR PLAN 60*64 cm Reduction 65*75 cm Branch 65*75 cm Branch 60*61 cm Branch 60*61 cm Branch 60*61 cm Branch 35*36 cm Branch 35*36 cm Branch 35*36 cm Branch 35*36 cm Branch 35*36 cm Branch 35*36 cm Branch 48*40 cm Branch 48*40 cm Branch
109 D1 D1 01 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 F B01 E B01 A B01 B B01 D D G B01 C B01 01 B01 02 B01 03 B01 06 B01 07 B01 08 B01 04 B01 05 B01 09 B01 10 B01 11 B01 12 B01 13 B01 14 B01 15 B01 G201 B01 1 C 1 LIBRARY G204 B01 B 4 E 1 CLASSROOM 2 G203 B01 4 1 CLASSROOM 1 G210 B01 3 1 COMPITER LAB 1 D1 G211 B01 B C COMPITER LAB 1 D1 G202 B01 B 1 A 1 OPEN WORKSHOP D1 D1 D5 G205 B01 B B STAIRS F.F.L +1.20 F.F.L +3.00 F.F.L +4.35 D1 D1 G104 B01 1 1 LOBBY G211 B01 B 3 C 1 STUDIO G106 B01 C - B 1 MEN TOILET G107 B01 C - 1 WOMEN TOILET D1 D1 Main duct 180*90 cm 163*90 cm Reduction 122*90 cm Reduction 86*85 cm Reduction Main duct 125*63 cm 114*63 cm Reduction 65*55 cm Reduction 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 40*30 cm Branch 20*30 cm Branch 20*30 cm Branch 20*30 cm Branch 20*30 cm Branch 20*30 cm Branch 20*30 cm Branch 40*48 cm Branch 40*48 cm Branch 40*48 cm Branch 40*48 cm Branch 40*48 cm Branch 40*48 cm Branch 20*28 cm Branch 20*28 cm Sub Branch 20*28 cm Sub Branch 20*55 cm Branch 20*55 cm Branch 20*55 cm Branch 20*55 cm Branch 20*55 cm Branch Main duct 159*79 cm 79*145 cm Reduction 79*84 cm Reduction SCALE DRAWING TITLE LABOR UNION BUILDING- B01 DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY HVAC-05 27 14-06-2021 CENTRAL FIRST FLOOR FURNITURE PLAN 60*61 cm Reduction 65*75 cm Branch 65*75 cm Branch 65*75 cm Branch 60*61 cm Branch 60*61 cm Branch 60*61 cm Branch 30*41 cm Branch 30*41 cm Branch 30*41 cm Branch 40*46 cm Branch 40*46 cm Branch
110 CHILLER SCALE DRAWING TITLE DATE WORKING NADA MOHAMMAD ABDUL-AZIZ 17105557 1:100 Arab Academy for Science, Technology & Maritime Transport AASTMT, Cairo Campus Faculty of Engineering Department of Architectural Engineering & Environmental Design KEY PLAN NORTH DRAWING NO. SHEET NO. DOCTOR AMGAD ALY HVAC-06 28 14-6-2021 CENTRAL ROOF PLAN ABBREVIATIONS: F.F.L FINISH FLOOR LEVEL T.O.CL TOP OF CLADDING T.O.S TOP OF SLAB ROXY CULTURE CENTER - B01 EL. +13.70 GR T.O.C. EL. +10.20 GR T.O.C. 01 B01 15 B01 01 B01 15 B01 NEIGHBOUR MAIN ROAD EL. +0.00 GR F.R.L. EL. +0.20 GR F.P.L. EL. +0.00 GR F.P.L. EL. +5.00 GR T.O.C. EL. +3.50 GR T.O.C. 0.00 B.M. F-2 F-2 R-1 R-1 EL. +2.80 GR T.O.C. F-A B01 F-B B01 EL. +3.50 GR T.O.C. GENERATOR TRANSFORMER RMU MAIN ROAD A B01 B01 SECURITY B C MAIN ROAD NEIGHBOUR STAIRS EL. +1.00 GR F.F.L. FIRE FIGHTING TANK PUMB EL. -3.00 GR F.F.L. FIRE FIGHTING TANK PUMB AHU 50 AHU 50 AHU AHU 36 AHU 23 AHU 23 EL. +5.00 GR T.O.C. EL. +3.50 GR T.O.C. EL. +3.50 GR T.O.C. GENERATOR TRANSFORMER RMU
Example of calculations
111
Execution Design 1
Year: 2020/2021Fall
University: AAST Location:Cairo
The Sun does not realise how wonderful it is until after a room is made.
-Louis Kahn-
The aim of the project is to prepare all the tender documents and finding the suitable solutions for the clashes throughout the whole process
Programes used:
Revite (the whole project ) Autocad 2D (for the details only )
112
112
E X E C U T I O N D E S I G 16
113 1 1 1 Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course : Execution Design 1 All Dimensions are in Meters. F.F.L. : FINISH FLOOR LEVEL F.P.L. : FINISH PAVEMENT LEVEL T.O.P. : TOP OF PARAPET T.O.C. TOP OF CONCRETE G.R.C :Glassfiber Reinforced Concrete A B C D 1 2 3 4 5 N Scale Size B1 ROXY COMMUNITY & ART CENTER LIST OF ABBERVATIONS GENERAL NOTES LIST OF SYMBOLS ELEVATION SYMBOL SECTION SYMBOL Outer walls are 25 cm inner walls are 12cm unless mensioned 1/27/2021 8:12:50 AM cover page Roxy Community & Art Center 01/27/21 Nada Mohammad Abdul-Aziz A-001 17105557 List of Drawings Sheet Number Sheet Name Scale A-001 cover page A-101 Basment Plan A-102 Ground Floor Plan 1:100 A-103 FIRST FLOOR PLAN A-104 ROOF PLAN A-201 North Elevatoin A-202 West elevation A-301 SECTION A-401 Stairs Section A-402 Stairs Plan A-403 Wall Section A-404 Wall Section A-501 Details A-901 Structure AS-101 LAYOUT
114 UP UP UP UP -B1 B1 A1 A1 A5 A5 A9 A9 B12 B12 C1 C1 C3 C3 D1 D1 D3 D3 Y Y B4 B4A201 1 A201 2 O.B.M ± 0.00 N 18.78 E 20.68 20.64 F.P.L ± 0.00 09 07 ? 08 09 07 2.40 2.40 2.40 2.40 2.40 2.40 2.40 2.40 Slope1% Slope1% Slope1% Slope1% Slope1% Slope1% Slope 1% Slope1% Slope1% Slope 1% A-202 1 Slope 1% Slope1% Slope1% Slope1% Slope1% 0.00 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.50 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.51 2.28 4.93 4.86 5.00 0.00 5.70 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 5.10 6.74 7.00 3.06 6.07 17.00 13.50 18.78 58.41 20.66 14.04 32.57 27.27 94.54 33.61 11.75 17.05 8.02 124.86 20.66 14.04 32.57 57.59 2.75 5.00 5.00 5.00 5.00 5.00 3.47 07 08 07 08 07 07 08 F.F.L +0.00 F.F.L +0.00 F.F.L +0.00 F.F.L -0.15 F.F.L -0.15 F.F.L +1.20 F.F.L +1.20 F.F.L +1.20 F.F.L -0.15 F.F.L -0.155.80 Name Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT ( AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # : Ttitle North Direction : Project Lecturer Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 200 1/27/2021 7:37:32 AM LAYOUT Roxy Community & Art Center 12/14/20 NADA MOHAMMAD ABDULAZIZ AS-101 17105557 1 : 200 LAYOUT 1 Multi-Category Material... Material: Mark Material: Name 03 Morter 07 Brick, Engineerin g, Soldier Course 08 Site - Grass 09 Roofing Tile
Basment B102 Back Stage B103 storage B104 Storage B105 Storage B106 Storage B107 Storage B108 Storage B109 Storage Ground Floor 001 Auditorium F1 S1 W2 C1 002 Transform er F1 S3 W1 C1 003 Escape sairs D3 S5 W1 004 Foyer F1 S2 W1 C1 005 Toilets F3 S3 W1 006 Toilets F3 S2 W1 C1 007 Stairs D3 2 W1 008 Toilets F3 S2 W1 CC 009 Toilets F3 S2 W1 C1 010 Electric Room F1 S2 W1 C1C 011 Electric F3 S4 W1 013 kitchen F3 S2 W11 C 014 Restauran F3 S2 W1
015 Info desk + lounge F1 S2 W1 C1
1st floor 101 Dance studio 102 chainging room (men) 103 chainging room (women) 104 Toilet 105 Toilet 106 Elevator 107 Toilets 108 Toilets 109 Lounge 110 Exhibition 111 Electric Room 112 Electric Room 2nd floor 201 Exercise room 202 Chainging room 3rd floor 301 Multipupos room 4th floor 401 offices
1
2.20 Metal Hinged 2 6 D5 0.60 2.20 Wood Hinged 1 3 D13 3 1st floor D1 0.90 2.20 Wood Hinged 1 10 D2 1.80 2.20 Metal Hinged 2 2 D5 0.60 2.20 Wood Hinged 1 2 roof D1 0.90 2.20 Wood Hinged 1 1
Pavment level W7 1.00 0.50 9 Ground Floor W1 1.00 1.00 Aluminum Sliding 2 29 W3 1.56 32 1st floor W1 1.00 1.00 Aluminum Sliding 2 31 W5 2.40 1.50 0.90 Aluminum 4 W9 2.00 1.50 1.40 4 2nd floor W1 1.00 1.00 Aluminum Sliding 2 31 W4 2.40 1.00 0.90 Aluminum 4 W9 2.00 1.50 0.90 4 3rd floor W1 1.00 1.00 Aluminum Sliding 2 31 W4 2.40 1.00 0.90 Aluminum 4 W9 2.00 1.50 1.20 4 4th floor W1 1.00 1.00 Aluminum Sliding 2 35 W4 2.40 1.00 Aluminum 9 W9 2.00 1.50 0.90 4 roof W1 1.00 1.00 0.10 Aluminum Sliding 2 1
115 UP UP 10 20 19 18 17 15 14 13 12 UP UP B1 B1 B5 B5 B6 B6 B7 B7 B8 B8 B9 B9 B10 B10 B11 B11 B4 B4 1 A301 1 A301 B2 B2 B3 B3 A201 1 A201 2 A-202 1 -408 403 Back Stage B102 storage B103 Storage B104 Storage B105 Storage B107 Storage B108 Storage B106 Storage B109 34.11 14.61 0.26 4.40 5.10 4.85 3.71 5.54 4.51 0.12 3.49 1.10 1.10 3.36 1.08 3.71 4.51 1.80 1.03 28.31 13.75 2.64 0.14 1.47 1.80 1.48 4.58 1.80 1.83 4.86 4.86 0.84 1.00 1.10 1.00 1.00 1.00 1.50 1.00 1.10 1.00 10.30 1.00 0.80 1.00 0.46 1.00 0.64 1.00 1.26 5.00 3.75 4.50 6.50 3.75 4.82 28.30 14.21 42.63 6.12 1.00 0.92 1.00 0.92 1.00 0.92 1.00 1.75 12.60 5.33 1.00 1.05 1.00 5.17 1.00 0.85 0.26 4.40 5.10 4.54 5.00 3.75 4.50 6.50 3.75 4.50 0.32 1.50 9.65 1.50 2.78 6.30 1.70 3.60 1.70 3.27 1.75 2.68 1.88 F.F.L -4.20 F.F.L -4.20 F.F.L -2.55 F.F.L +2.22 F.F.L -1.50 F.F.L -4.20 F.F.L -3.60 F.F.L -1.95 W1 W1 W1 W1 W1 W1 W1 W7 W7 W7 W7 W7 W7 W7 W7 W7 Auditorium 001 D1 D2 D2 D2 D2 D1 D2 D2 Granite tread 6.34 0.16 3.59 0.16 4.34 4.86 5.30 2.78 28.00 12.70Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 100 1/27/2021 7:33:32 AM Basment Plan Roxy Community & Art Center 11/24/20 Author A-101 17105557 Door Schedule Mark Dimensions Description No. of Leaves Qty Width Height Door Material Type auditorium level D2 1.80 2.20 Metal Hinged 2 1 Basment D1 0.90 2.20 Wood Hinged
2 D2 1.80 2.20 Metal
5 Ground Floor D1
Wood
Room Finishes Schedule
Room Name Floor Finish Skirting Finish Wall Finish Ceiling Finish Notes
1
Hinged 2
0.90 2.20
Hinged
10 D2 1.80
Roo m No.
Window Schedule Mark
Dimensions Description No. of Leaves Qty Width Height Sill Height Window Material Type
1 : 100 Basment 1
Window Schedule
Pavment level W7 1.00 0.50 9 Ground Floor W1 1.00 1.00 Aluminum Sliding 2 29 W3 1.56 32 1st floor W1 1.00 1.00 Aluminum Sliding 2 31 W5 2.40 1.50 0.90 Aluminum 4 W9 2.00 1.50 1.40 4 2nd floor W1 1.00 1.00 Aluminum Sliding 2 31 W4 2.40 1.00 0.90 Aluminum 4 W9 2.00 1.50 0.90 4 3rd floor W1 1.00 1.00 Aluminum Sliding 2 31 W4 2.40 1.00 0.90 Aluminum 4 W9 2.00 1.50 1.20 4 4th floor W1 1.00 1.00 Aluminum Sliding 2 35 W4 2.40 1.00 Aluminum 9 W9 2.00 1.50 0.90 4 roof W1 1.00 1.00 0.10 Aluminum Sliding 2 1
1.80
D1 0.90 2.20 Wood Hinged 1 2 D2 1.80 2.20 Metal Hinged 2 5 Ground Floor D1 0.90 2.20 Wood Hinged 1 10 D2 1.80 2.20 Metal Hinged 2 6 D5 0.60 2.20 Wood Hinged 1 3 D13 3 1st floor D1 0.90 2.20 Wood Hinged 1 10 D2 1.80 2.20 Metal Hinged 2 2 D5 0.60 2.20 Wood Hinged 1 2 roof D1 0.90 2.20 Wood Hinged 1 1
B102 Back Stage B103 storage B104 Storage B105 Storage B106 Storage B107 Storage B108 Storage B109 Storage Ground Floor 001 Auditorium F1 S1 W2 C1 002 Transform er F1 S3 W1 C1 003 Escape sairs D3 S5 W1 004 Foyer F1 S2 W1 C1 005 Toilets F3 S3 W1 006 Toilets F3 S2 W1 C1 007 Stairs D3 2 W1 008 Toilets F3 S2 W1 CC 009 Toilets F3 S2 W1 C1 010 Electric Room F1 S2 W1 C1C 011 Electric F3 S4 W1 013 kitchen F3 S2 W11 C 014 Restauran F3 S2 W1 015 Info desk + lounge F1 S2 W1 C1 1st floor 101 Dance studio 102 chainging room (men) 103 chainging room (women) 104 Toilet 105 Toilet 106 Elevator 107 Toilets 108 Toilets 109 Lounge 110 Exhibition 111 Electric Room 112 Electric Room 2nd floor 201 Exercise room 202 Chainging room 3rd floor 301 Multipupos room 4th floor 401 offices
116 UP UP 10 20 19 18 17 16 15 14 13 12 32 31 29 28 26 25 23 22 UP UP UP UP UP UP B1 B1 B5 B5 B6 B6 B7 B7 B8 B8 B9 B9 B10 B10 B11 B11 B12 B12 C1 C1 C2 C2 C3 C3 D1 D1 D2 D2 D3 D3 B4 B4 0.14 6.30 6.30 6.25 1 A301 1 A301 Auditorium 001 Transformer 002 Foyer 004 Escape sairs 003 Toilets 006 Toilets 005 Electric 011 Electric Room 010 Toilets 008 Toilets 009 kitchen 013 Restaurant 014 0.65 1.80 31.30 0.65 0.90 24.08 1.80 6.07 14.25 5.94 1.00 0.92 1.00 0.92 1.00 0.92 1.00 2.20 1.00 1.43 1.00 1.31 1.00 7.23 1.00 3.50 1.00 1.05 1.00 5.17 1.00 0.65 4.89 0.900.40 1.00 2.00 1.00 1.25 1.80 3.67 1.00 0.59 1.00 0.59 1.00 1.10 0.96 1.000.331.000.331.000.331.000.331.00 1.83 1.000.501.00 2.62 1.30 1.00 0.68 1.00 0.68 1.00 0.68 1.00 0.68 1.00 0.68 1.00 D2 D2 D2 D1 D1 D2 D1 D1 D1 D1 D1 D2 D1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 B2 B2 B3 B3 Info desk + lounge 015 Stairs 007 28.20 3.75 4.50 6.50 3.75 4.50 0.32 14.30 6.00 8.00 5.50 6.25 17.12 A201 1 A201 2 A-202 1 1 A-402 Sim C1 A-501 Sim A1 A-501 1 A-408 1 A-408 4.40 5.10 4.54 F.F.L -4.20 F.F.L +1.20 F.F.L -2.55 F.F.L -1.20 F.F.L +0.60 F.F.L -4.05 D5 D5 D5 D2 D1 D1 0.62 403 F.F.L -4.20 F.F.L -4.20 F.F.L +1.20 F.F.L +1.20 F.F.L +1.20 outdoor area for restaurant 5.135.25 5.13 1.30 5.10 11.75 16.88 11.45 13.80 8.95 0.90 1.38 1.80 0.73 10.25 0.380.90 5.49 1.95 5.30 1.88 5.30 5.28 0.16 0.10 0.22 0.12 1.73 2.70 1.88 3.60 1.70 4.32 1.83 3.92 0.23 0.22 5.30 9.35 8.38 5.00 3.75 4.50 6.50 3.75 4.50 0.32 4.25 6.90 53.60 02 20.21 12.70 14.74 2.72 5.02 4.26 Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 100 1/27/2021 7:33:59 AM Ground Floor Plan Roxy Community & Art Center 17/11/2020 Nada Mohammad Abdul-Aziz A-102 17105557 1 : 100 Ground Floor Plan A1 Door Schedule Mark Dimensions Description No. of Leaves Qty Width Height Door Material Type auditorium level
D2
2.20 Metal Hinged 2 1 Basment
Mark Dimensions Description No. of Leaves Qty Width Height Sill Height Window Material Type
Room Finishes Schedule
Room Name Floor Finish Skirting Finish Wall Finish Ceiling Finish Notes
Roo m No.
Basment
1.58 1.58 1.58 1.58 1.61 0.82
Window
Pavment level W7 1.00 0.50 9
Ground Floor W1 1.00 1.00 Aluminum Sliding 2 29 W3 1.56 32
1st floor W1 1.00 1.00 Aluminum Sliding 2 31 W5 2.40 1.50 0.90 Aluminum 4 W9 2.00 1.50 1.40 4 2nd floor W1 1.00 1.00 Aluminum Sliding 2 31 W4 2.40 1.00 0.90 Aluminum 4 W9 2.00 1.50 0.90 4 3rd floor W1 1.00 1.00 Aluminum Sliding 2 31 W4 2.40 1.00 0.90 Aluminum 4 W9 2.00 1.50 1.20 4 4th floor W1 1.00 1.00 Aluminum Sliding 2 35 W4 2.40 1.00 Aluminum 9 W9 2.00 1.50 0.90 4 roof W1 1.00 1.00 0.10 Aluminum Sliding 2 1
Wood Hinged 1 D13 1st floor D1 0.90 2.20 Wood Hinged 1 10 D2 1.80 2.20 Metal Hinged 2 D5 0.60 2.20 Wood Hinged 1 roof D1 0.90 2.20 Wood Hinged 1
Basment B102 Back Stage B103 storage B104 Storage B105 Storage B106 Storage B107 Storage B108 Storage B109 Storage Ground Floor 001 Auditorium F1 S1 W2 C1 002 Transform er F1 S3 W1 C1 003 Escape sairs D3 S5 W1 004 Foyer F1 S2 W1 C1 005 Toilets F3 S3 W1 006 Toilets F3 S2 W1 C1 007 Stairs D3 W1 008 Toilets F3 S2 W1 CC 009 Toilets F3 S2 W1 C1 010 Electric Room F1 S2 W1 C1C
011 Electric F3 S4 W1 013 kitchen F3 S2 W11 C 014 Restauran F3 S2 W1 015 Info desk + lounge F1 S2 W1 C1
1st floor 101 Dance studio 102 chainging room (men) 103 chainging room (women) 104 Toilet 105 Toilet 106 Elevator 107 Toilets 108 Toilets 109 Lounge 110 Exhibition 111 Electric Room 112 Electric Room 2nd floor 201 Exercise room 202 Chainging room 3rd floor 301 Multipupos e room 4th floor 401 offices
117 UP UP 10 20 17 16 15 14 13 12 32 31 29 28 26 25 23 22 B1 B1 A1 A1 A2 A2 A3 A3 A4 A4 A5 A5 A6 A6 A7 A7 A8 A8 A9 A9 B5 B5 B6 B6 B7 B7 B8 B8 B9 B9 B10 B10 B11 B11 B12 B12 C1 C1 C2 C2 C3 C3 D1 D1 D2 D2 D3 D3 B4 B4 1 A301 1 A301 B2 B2 B3 B3 Exhibition 110 Dance studio 101 A201 1 A201 2 A-202 1 1 A-408 403 chainging room (men) 102 chainging room (women) 103 Elevator 106 Toilets 107 Toilets 108 Lounge 109 Toilet 104 Toilet 105 Stairs Electric Room 111 Electric Room 112 F.F.L +3.45 F.F.L +10.70 F.F.L +10.80 F.F.L +15.60 F.F.L +13.80 F.F.L +12.45 33.75 0.13 3.51 1.99 3.01 4.99 5.00 5.00 5.00 5.00 0.13 9.22 4.00 0.78 2.00 0.30 2.00 0.87 4.00 0.45 2.55 0.30 2.00 0.35 0.27 4.00 0.65 14.27 0.10 4.40 5.10 4.54 0.13 1.65 2.40 0.45 2.40 0.45 2.40 0.45 2.40 1.65 19.89 0.13 19.76 28.20 4.87 3.75 4.50 6.50 3.75 4.50 0.32 0.51 1.61 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58 1.58
53.72 0.02 5.94 1.00 0.92 1.00 0.92 1.00 0.92 1.00 1.55 0.10 4.40 5.10 4.54 5.00 3.75 4.50 6.50 3.75 4.50 0.32 4.25
5.15 1.00 0.40 0.130.66 1.00 1.43 1.00 1.31 1.00 5.18 1.00 0.400.13 0.130.53 1.00 5.17 1.00 0.65 6.19
0.010.85
5.50 6.25 4.63
6.25 5.50
11.50 13.75 0.20 0.73 1.88 0.16 1.95 5.25 0.33 0.23 3.54 5.25 5.33 3.510.23 0.22 0.60 1.70 3.27 1.73 2.70 2.00 3.60 1.70 3.28 2.91 0.57 0.90 1.35 0.90 0.60 1.88 3.60 3.84 5.30 0.60 4.19 0.10 5.23 5.32 4.42 4.77 5.32 8.37 1.87 4.50 2.00 4.12 13.75 0.60 1.80 27.62 W5 W5 W5 W5 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 D1 D1 D5 X X X X X X X X D1 D1 D5 X X X X X X X X D1 D1 D1 D2 D1 D2 D1 D1 W9 W9 W9 W9 02 02 02 02 28.00 3.69 4.48 1 1 1 1 Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 100 1/27/2021 7:34:40 AM FIRST FLOOR PLAN Roxy Community & Art Center 11/24/20 Author A-103 17105557 1 : 100 1st floor 1 Door Schedule Mark Dimensions Description No. of Leaves Qty Width Height Door Material Type auditorium level D2 1.80 2.20 Metal Hinged 2 Basment D1 0.90 2.20 Wood Hinged 1 D2 1.80 2.20 Metal Hinged 2 Ground Floor D1 0.90 2.20 Wood Hinged 1 10 D2 1.80 2.20 Metal Hinged 2 D5 0.60 2.20
Room Finishes Schedule
6.97
1.00 2.00 1.00 16.51 1.30 1.00 0.68 1.000.481.00 0.87 1.00 0.68 1.00 0.68 1.00 0.131.05 0.96 1.000.331.000.331.000.331.000.331.00 1.83 1.000.501.000.501.00 1.12 6.72 1.00 0.59 1.00 0.59 1.00
0.15
14.15 0.15 0.15 8.00 6.00 11.74
0.13
Floor
Wall Finish Ceiling Finish Notes
Roo m No. Room Name
Finish Skirting Finish
Schedule Mark Dimensions Description No. of Leaves Qty Width Height Sill Height Window Material Type
118 UP 11 20 19 18 17 16 14 13 12 33 32 30 29 27 26 24 23 21 B1 B1 A1 A1 A2 A2 A3 A3 A4 A4 A5 A5 A6 A6 A7 A7 A8 A8 A9 A9 B5 B5 B6 B6 B7 B7 B8 B8 B9 B9 B10 B10 B11 B11 B12 B12 C1 C1 C2 C2 C3 C3 D1 D1 D2 D2 D3 D3 B4 B4 1 A301 B2 B2 B3 B3 A201 1 A201 2 A-202 1 A-408 404 Slope1% Slope1% Slope1%
Slope1% Slope
Slope1% Slope1%
1.70 3.27
1.73 2.70 1.88 1.70 3.90 0.63 6.30 Stairs 0.55 0.90 Slope1% 14.29 33.73 8.79 24.94 0.15 5.00 5.00 5.00 5.00 4.99 3.01 1.99 3.51 0.13 0.10 4.40 5.10 4.54 0.13
53.68 0.10 4.40 5.10 4.54 5.00 3.75 4.50 6.50 3.75 4.50 0.32 4.25 6.84 F.F.L +25.35 F.F.L +23.40 F.F.L +22.05 F.F.L +25.19 F.F.L +25.19 09 09 09 09 01 01 33.46 13.75 13.35 27.75 22.52 14.06Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 100 1/27/2021 7:35:49 AM ROOF PLAN Roxy Community & Art Center 01/27/21 Nada Mohammad Abdul-Aziz A-104 17105557 1 : 100 roof 1 Multi-Category Material... Material: Mark Material: Name 03 Morter 07 Brick, Engineerin g, Soldier Course 08 Site Grass 09 Roofing Tile
Slope1% Slope1%
1% Slope1% Slope1% Slope 1%
Slope1% Slope1% Slope1% Slope1% Slope1%
1.26
4.76 5.00 5.00 5.00 0.13 19.88 28.18 4.85 3.75 4.50 6.50 3.75 4.50 0.32 0.19 5.50 6.10 0.15 11.90 14.31 0.13 6.00 8.00 0.15 16.53 4.63 6.25 5.50 0.15
+28.20
T.O.P Top of upper parapet
A-408 404
A1
-4.20
+26.40 T.O.P parapet
A2 A3 A4 A5 A6 A7 A8 A9 Y T.O.C roof
T.O.P parapet
+24.92 T.O.C roof
+20.40
0.40 0.30 0.30 2.50 0.50 4.10 0.50
F.F.L 4th floor
+20.40 F.F.L 4th floor
+15.60
+24.92 F.F.L Basment
+15.60 F.F.L 3rd floor
+10.80
F.F.L 3rd floor
03 01
F.F.L 2nd floor
+10.80 F.F.L 2nd floor
+6.00
+6.00 F.F.L 1st floor
+26.40 F.F.L 1st floor
F.F.L Ground Floor
+1.20 F.F.L Ground Floor
+0.00
+0.00 F.P.L Pavment level
+1.20 F.P.L Pavment level
-3.60 F.F.L Basment
-4.20 F.F.L auditorium level
-3.60 F.F.L auditorium level
120
Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 100 1/27/2021 7:43:08 AM West elevation Roxy Community & Art Center 12/15/20 Nda mohammad abdul-aziz A-202 17105557 1 : 100 Elevation 2 - a 1
T.O.P Top of upper parapet +28.20 02 02 02 02 02 02 02 03 01 33.50 2.90
4.50 0.50 3.80 0.50 2.60 4.70 1.35 3.45 0.60 4.48 18.92 4.70 1.35 3.45 0.60 30.60 0.10 3.40 1.60 3.00 1.50 3.50 1.60 2.70 1.60 1.50 4.70 1.35 3.45 0.60 1.80 0.00 6.00 4.80 4.80 4.80 4.80 4.80 0.60
1
D
1 : 20 Main Stairs Section 2
F.F.L Basment
3.60
C
F.P.L Pavment level
F.F.L Ground Floor
GRANITE 4CM THICJNESS B
F.F.L -3.60 F.F.L -3.60
F.F.L 1st floor
F.F.L
Basment3.60
1.25 3.11
T.O.C roof
+24.92
T.O.P parapet
+26.40
F.F.L -1.95
F.F.L +1.20 F.F.L -0.60
GRANITE 4CM THICJNESS
HANDRAIL 0.9 HEIGHT
2.18 0.90
3.29 18.92 6.15 3.45 0.20 1.05
Pavment level +0.00
+0.00 F.P.L
32
3.33 Sim B4 A501 F.F.L +4.20 F.F.L +2.85
33 12
1.20 4.80 1.48 1.35 1.80 1.35 1.65 1.80 1.35 1.65
Ground Floor +1.20
+1.20 F.F.L
+6.00 F.F.L
1st floor +6.00
A3 T.O.C
A1
A2
roof +24.92
T.O.P
parapet +26.40
main stairs
are in Meters. Stairs Section
Roxy Community & Art Center
12/22/20
# Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 AM
Mohammad Abdu-Aziz A-401 17105557
Nada
1 2 3 4 5 N Scale Size B1 1 20 1/27/2021
7:49:38
122
F.F.L +5.98 F.F.L +24.30 Name :
F.F.L +25.36 F.F.L +25.19 Date
T.O.P Top of upper parapet ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID :
+28.20 T.O.P DWG
Top of upper parapet +28.20 Remarks All Dimensions
HANDRAIL 0.9 HEIGHT F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A
123 11 10
20 19 18 17 16 15 14 13 12 32 31 30 29 28 27
25 24 23 22 21 UP 11 10 9 8 7 6 5 4 3 2 1 20 19 18 17 16 15 14 13 12 33 32 31 30 29 28 27 26 25 24 23 22 21 UP 11 10 9 8 7 6 5 4 3 2
20 19 18 17 16 15 14 13 12 32 31 30 29 28 27 26 25 24 23 22 21 A1 A1 A2 A2 A3
B7 B7 B8 B8 2 A-401 2 A-401 F.F.L +2.85 0.3@11T=
1.70 1.73 8T@0.3= 2.70 Granite tread Granite tread F.F.L +4.20 Granite tread Granite tread Granite tread Granite tread Granite tread Granite tread Granite tread Granite tread Granite tread Granite tread Granite tread
1.88 0.25 5.72
3.51 6.85 0.18 6.50 0.18 0.40 1.00 4.90
A1
A2
A3 A3 B7 B8 2 A-401 2
Stairs F.F.L +25.35 F.F.L +25.19 F.F.L +23.40 F.F.L +22.05
Granite tread Granite tread Granite tread Granite tread B7
2
2.70 1.88 1.70 0.3@12T= 3.60 Granite tread Granite tread Granite tread 6.85 5.18 1.00 0.68 0.15 6.50 0.18 2.94 1 1 1 1 Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 20 1/27/2021 7:53:50 AM Stairs Plan Roxy Community & Art Center 12/27/20 Author A-402 17105557 1 : 20 Ground Floor Stairs Plan 1 1 : 20 Roof Stairs 2 1 20 Basment Stairs plan 3
9 8 7 6 5 4 3 2 1
26
1
A3
3.30
1.66
1.99
0.3@12T= 3.60
A1
A2
A-401
03@11T= 3.30 1.70 1.73 0.3@8T= 2.70 1.88 1.70 0.3@13T= 3.90 0.63 6.30 1.23 2.93 3.30
B8 2 A-401
A-401 F.F.L -1.95 F.F.L -0.60 F.F.L -3.60 03@11T= 3.30 1.70 1.73 0.3@8T=
C
+6.00 B4
B
paint 2 cm plaster 0.2 cm stone cladding mechanical fixation 0.80 1.50 0.90
1.35 3.20
4.80 1.20 2 cm morter 0.2 cm stone cladding back fill road pavment 15 cm GRC elevation spacers 12 mm gypsum board 0.3 cm cchannels ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN
F.F.L 1st floor
F.F.L Ground Floor
F.P.L Pavment level
+0.00 F.F.L
1.35 PC slab 10 cm DPC 2cm PC slab 15 cm Sand 6cm morter 2cm ceramics 0.8mm
+1.20 F.P.L
gypsum boards 12mm RC slab 10cm sand 6 cm morter 2cm ceramic tiles 0.8 cm HDF wood flooring 2 cm
1st floor +6.00
hangers F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A
0.45 4.10 1.35 8.60 Date
F.F.L
Ground Floor +1.20
Pavment level +0.00
4.55 Name :
ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 D
hangers 12 mm gypsum board 0.3 cm cchannels Remarks All
wall section part(1) 1 wall section
Roxy Community & Art Center 01/27/21 Nada Mohammad Abdul-Aziz A-403 17105557 1 : 20
Wall Section
Dimensions are in Meters. 1 2 3 4 5 N Scale Size B1 1 20 1/27/2021
7:54:55
AM
124
F.F.L auditorium level
4.20 F.F.L
auditorium level4.20
Auditorium 001 Dance studio 101
B4
T.O.P parapet
T.O.C roof
parapet +26.40
T.O.P
RC slab 15 cm inclination concrete 10 cm DPC thermal insulation 5 cm sand 7cm morter 2cm ceramic tiles 0.8 cm
F.F.L 4th floor
F.F.L 3rd floor
paint 2 cm plaster paint 2 cm plaster 1.48 4.52 4.80 4.80
roof +24.92
+24.92 T.O.C
+26.40 F.F.L 2nd floor
GRC elevation spacers GRC elevation spacers
0.30 1.20 1.20 1.32 3.10
1.32 1.15 0.15 1.00 0.80
0.02ø
1.30 1.00 12 mm gypsum board 0.3 cm cchannels
1.00 0.90
2 cm plaster 0.24 20 cm skirting
0.30 0.37 0.60 0.60 0.60 0.60
0.45 4.10
4.55
1.20
1.35 1.20
0.49 0.60 0.60 0.60 0.60
hangers
hangers 12 mm gypsum board 0.3 cm cchannels
3.20 1.00 1.30 0.90
gypsum boards 12mm RC slab 15cm sand 6 cm morter 2cm gypsum boards 12mm RC slab 15cm sand 6 cm morter 2cm
4th floor +20.40
+20.40 F.F.L
+15.60 F.F.L
3rd floor +15.60
GRC elevation spacers Exercise room 201 Multipupose room 301 offices 401
0.45 0.34 1.21 0.52 1.33 0.70
12 mm gypsum board 0.3 cm cchannels
4.55
Shading louvers 2.65 1.00 0.90
4.55
hangers gypsum boards 12mm RC slab 15cm sand 6 cm morter 2cm
2nd floor +10.80
+10.80 F.F.L
125
Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project
Course Execution Design
Remarks All Dimensions are in
F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 1 20 1/27/2021 7:55:21 AM Wall Section Roxy Community & Art Center 01/27/21 Nada Mohammad Abdul-Aziz A-404 17105557
wall section
Lecturer : Dr. Sherif Ezzeldin
1
Meters.
1 : 20 Wall Section part (2) 1
126
metal corner c-channel 3 cm gypsum board 1 cm balustrade 90 cm height double layered glass u-channel 0.42cm rubber top rail 0.45 cm 0.020.03 0.30 0.09 0.50 0.40 0.03 0.03 0.02 0.20 0.40 0.04 0.07 0.02 0.98 1.38 0.44
20 GA. GALV. CONTINUOUS CLEAT CONDENSATE SEAL WITH INSULATION (BY OTHERS) 8" WIDE 20 GA. GALV. ANCHOR CLEATS 3'-0" O.C. FORMED METAL CAP 24 GA. GALV. CONTINUOUS RAILS 12" WIDE CONCEALED SPLICE PLATE AT EACH JOINT #10 1/2" STAINLESS STEEL SCREW W/ SHOULDERED WASHER (PROVIDED) 18" O.C. THRU 1/4" GALVANIZED RING SHANK ROOFING NAILS 24" O.C. BOTH RAILS (PROVIDED) CONTINUOUS CLEAT INTO CURBS 15/16" RC slab 15 cm inclination concrete 10 cm DPC 2 cm thermal insulation 5 cm sand 6cm morter 2cm ceramic tiles 0.8 cm hangers c-channels 3cm gypsum board 2 cm Name : Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID : DWG # Ttitle North Direction Project Lecturer : Dr. Sherif Ezzeldin Course Execution Design 1 Remarks All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale Size B1 As indicated 1/27/2021 7:56:25 AM Details Roxy Community & Art Center 01/27/21 Nada Mohammad Abdul-Aziz A-501 17105557 1 5 Corridors glass handrail detail C1 1 : 10 skylight - roof level detail B4 1 5 expansion joints in roof detail A1
SETTINGP-4033-1 BLOCK 30° (U.I.F.) 3003 P-4024 CORNER CAP SETTING BLOCK P-4032-1" P-4007 SPLICE (3/16"P-4011-29A ALUM.) 3005 1262 P-4083 1/8" ALUM. FLANGE FLASHING P-1125 SPLICE P-4077 COVER U.I.F. 3013 3030 3025 3051 3050 Beam 30 60 wall 12 concrete 15 door 220cm gypsum coards 1 cm c-chanels 3 cm hangers 45 cm RC slab 15 cm sand 6cm morter 2cm ceramic tiles 0.8 cm
0.47 plaster 2 cm RC slab 15cm slop concrete 10 cm membrain 2 cm Thermal insulation 5 cm sand 6 cm ceramic tiles 0.8 cm plaster 2 cm RC slab 15cm sand 6 cm morter 2cm ceramic tiles 0.8 cm skirtiing 20 cm
Name Date ARAB ACADEMY FOR SCIENCE & TECHNOLOGY & MARITIME TRANSPORT AASTMT FACULTY OF ENGINEERING DEPARTMENT OF ARCHITECTURAL ENGINEERING & ENVIRONMENTAL DESIGN ID DWG # : Ttitle North Direction Project Lecturer Dr. Sherif Ezzeldin Course Execution Design 1 Remarks : All Dimensions are in Meters. F.F.L. FINISH FLOOR LEVEL F.P.L. FINISH PAVEMENT LEVEL T.O.P. TOP OF PARAPET T.O.C. TOP OF CONCRETE A B C D 1 2 3 4 5 N Scale : Size B1 1/27/2021 8:09:11 AM Structure Roxy Community & Art Center 01/27/21 Author A-901 17105557 {3D} Copy 1 1
structure
the wide
of the rooms
slab system to avoid columns in the middle of the restaurant
beam system
because this
corridor space
dosn't need wide span structure
frames
system: due to
spans
Flat
column and
:
is a
which
URBAN DESIGN
Year: Intodution to city & ragional planing 2020/2021 Fall Intodution to urban dsign 2020/2021 Spring Intodution to site planning & housing 2021/2022 Fall
University: AAST Location: al mokattam ,Cairo mit okba ,al mohandeseen newcairo
““From 50 centuries, we can learn about the close relationship between garden design and urban design, because both arts involve the composition of buildings with paving, landform, water, vegetation and climate.”
-Tom Turner-
Throughout the three courses we were exposed to different scopes of large scale designs
Starting from city designing, we were asked to study al mokkatam city and figuiring out the exisiting problems with giving the suitable solutions for that & how to upgrade it to smart city.
Passing through the process to the smaller scope which is the urban design in mit okba area, by studing the urea and how to improve it.
The last scope was site planning & housing and we were asked to work on THE BROOKS compound in new cairo owned to PRE developments under the supervision of YBA architects Our project was ranked the first on class.
Programes used: Autocad 2D Microsoft office power point photoshop Revit
128
R B
N D E S I G N 17
U
A
(1)INTRODUCTION TO CITY & RAGIONAL PLANING
(1)INTRODUCTION TO CITY & RAGIONAL PLANING
(1)INTRODUCTION TO CITY & RAGIONAL PLANING
(1)INTRODUCTION TO CITY & RAGIONAL PLANING
(1)INTRODUCTION TO CITY & RAGIONAL PLANING
(1)INTRODUCTION TO CITY & RAGIONAL PLANING
(2)INTRODUCTION TO URBAN DESIGN
(2)INTRODUCTION TO URBAN
DESIGN
(2)INTRODUCTION TO URBAN DESIGN
(2)INTRODUCTION TO URBAN
DESIGN
(3)INTRODUTION TO SITE PLANNING & HOUSING
(3)INTRODUTION TO SITE PLANNING & HOUSING(BOOKLET)
(3)INTRODUTION TO SITE PLANNING & HOUSING(BOOKLET)
ENVIROMENTAL STUDIES 1&2
Year: 2019/2020 Spring 2021/2022 Fall
University: AAST Location: Cairo
“Study nature, love nature, stay close to nature. It will never fail you.”.
-Frank Lloyd Wright-
The aim is to design a building applying the sustainable solutions for the buildings
Programes used: 3Dmax Vray Autocad 2D
142
E N V I R O M E N T A L D E S I G N 20
143 ENVIROMENTAL 2 ENVIROMENTAL 1
3D MODELS
(Physical-Digital)
University: AAST
“When you build a building, any building, start with the simple block model to see where that goes.”.
-Frank Owen Gehry -
Programes used: 3Dmax Vray Revit
144
3 D M O D E L S 21
145
146
147
PHOTOGRAPHY
Year:2021/2022 Fall University: AAST Location: Almaza,Cairo
“Only photography has been able to divide human life into a series of moments, each of them has the value of a complete existence.”.
-Eadweard Muybridge-
148
P H O T O G R A P H Y 21
149
150
151
ARTISTIC COURSES & ELECTIVES
Year:2021/2022 Fall
University: AAST Location: Almaza,Cairo
“You can’t connect the dots looking forward; you can only connect them looking backwards”.
-Steve Jobs-
The aim is to design a public park as an attractorand/orconnector in the provided location in Cairo.Your park is expected to promote the human health andwellbeing for the community. It is expected to respect the history of the area.Your design is to be vitalized with activities that are inspired by the history of the assigned site.
152
A R T 21
LIGHTING UNITS (design&excution)
Design Statment for unit 1:
Theuniteisinspiredfromthesunrayspassing throughthetreeleavescreatingstraightlight rays.
PAINTING
Design Statment for unit 2:
The unite is inspired from the sun rays passing through the tree leaves creating straight light rays.
153
VISUAL STUDIES 1(FREE HAND DRAWINGS)
VISUAL STUDIES 1(FREE HAND DRAWINGS)
Nada Mohammad Abdulaziz
nada.mohammad.abdulaziz@gmail.com