Portfolio_Musheer_Architecture_BIM

Page 1

PORTFOLIO

- Mohd.Musheer
VILLA REVIT PROJECT Client : NA Status : Ongoing Built up Area : 13000 sft. BIM PROJECT
NAVISWORK COMMENTS/ VIEWPOINTS Client :Status :Built up Area :BIM PROJECT
NAVISWORK CLASH DETECTION TESTS Client :Status :Built up Area :BIM PROJECT
WOODLEY RESIDENCE REVIT PROJECT Client : NA Status : Ongoing Built up Area : 4115 sft. BIM PROJECT
WOODLEY RESIDENCE REVIT PROJECT Client : NA Status : Ongoing Built up Area : 4115 sft. BIM PROJECT
PARK INN HOTEL REVIT PROJECT Client : NA Status : Ongoing Built up Area : 87800 sft. BIM PROJECT
PARK INN HOTEL REVIT PROJECT Client : NA Status : Ongoing Built up Area : 87800 sft. BIM PROJECT
COSMOPOLITON HOTEL REVIT PROJECT Client : NA Status : Ongoing Built up Area : 56000 sft. BIM PROJECT
COSMOPOLITON HOTEL REVIT PROJECT Client : NA Status : Ongoing Built up Area : 87800 sft. BIM PROJECT
PARK INN BY RADISSON Kolkata Client : Mr. Siddharth Jain Status : Ongoing Built up Area : 1,00,000 sft PROPOSED DESIGN
PARK INN BY RADISSON 3D RENDITIONS RECEPTION
LOBBY
DELI COUNTER ALL DAY DINING
PARK INN BY RADISSON 3D RENDITIONS
BUFFET BAR KING BEDROOM KING BEDROOM
GOLDEN PALM CLUB Greater Noida Client : IITL, Nimbus Group Status : Completed Built up Area : 19,500 sft Ground floor plan 3D view 1 3D view 2 PROPOSED DESIGN
GOLDEN PALM CLUB Greater Noida Client : IITL, Nimbus Group Status : Completed Built up Area : 19,500 sft ACTUAL SITE IMAGES (Exterior)
GOLDEN PALM CLUB Greater Noida Client : IITL, Nimbus Group Status : Completed Built up Area : 19,500 sft ACTUAL SITE IMAGES (Interior)
GOLDEN PALM CLUB Greater Noida Client : IITL, Nimbus Group Status : Completed Built up Area : 19,500 sft ACTUAL SITE IMAGES (Interior)
HYDE PARK CLUB Noida Client : IITL, Nimbus Group Status : Completed Built up Area : 19,500 sft Ground floor plan 3D view 1 3D view 2 PROPOSED DESIGN
HYDE PARK CLUB Noida Client : IITL, Nimbus Group Status : Completed Built up Area : 19,500 sft ACTUAL SITE IMAGES (Exterior)
HYDE PARK CLUB Noida Client : IITL, Nimbus Group Status : Completed Built up Area : 19,500 sft ACTUAL SITE IMAGES (Interior)
HYDE PARK COMMERCIAL Noida Client : IITL, Nimbus Group Status : Completed Scope of work : External Façade ACTUAL SITE IMAGES
Proposed
design Actual
site images Actual
site images
ADMINISTRATION BLOCK Jambusar, Gujrat Client : PI Industries Status : Ongoing Built up Area : 50,000 sft PROPOSED DESIGN
ADMINISTRATION BLOCK Jambusar, Gujrat Client : PI Industries Status : Ongoing Built up Area : 50,000 sft ACTUAL SITE IMAGES (Exterior)
ADMINISTRATION BLOCK Jambusar, Gujrat Client : PI Industries Status : Ongoing Built up Area : 50,000 sft ACTUAL SITE IMAGES (Interior)
VILLA Al Barsha, Dubai Client : Ahmad Ali Abdulwahab Status : Proposed Built up Area : 5348 sft 3D Views First
Floor Site Plan
INTERIOR VIEWS 3 D Renders

A N C E W O R K

Gulf
Petrochem
F R E E L
3 D Renders
Gulf Petrochem
• This building is solely occupied by India Infoline, which is a leading financial services company in India. • Total area: 50,000 sft excluding basements. • Basement area: 37129.53 sft • Floors : G+7 • Total Height: 30.8 Meter. • A Platinum Rated green building. • Energy saving and cost effective methods used in execution also which increase the Initial investment but can be reimbursed within a short span of time by low running cost. I I F L Gurgaon Client : India Infoline Status : Completed Built up Area : 50000 sft MEETING ROOMS MEETING ROOMS MEETING ROOMS TERRACE GARDEN CAFETERIA WORKHALL WORKHALL WORKHALL WORKHALL WORKHALL TERRACE GARDEN SERVICE CORE
Actual site photos Workhall 3D view Lobby 3D view Actual site image I I F L Gurgaon Key Role:• Working drawings • Glass Façade Details • Co-ordination with all consultant from the start to the finish of the building • Electrical drawings • Monitoring work progress – regular site visits • Interior layouts and planning • RCPs • Estimation and Costing

Key Role:-

One of the most ambitious project of Shriji Group, City Square Mall. the very first Mall & Multiplex located in the heart of Ajmer is a complete crowd puller and already a big hit among the leading brand stores. PROGRAMMATIC DISTRIBUTION :• Basement parking, • Big Bazaar and other retail shops, • Two floors for retail shops, • Food court, Restaurant & Lounge etc, • Multiplex with 3 screens (INOX), • 3 Star Hotel With 63 room (ITC FORTUNE), FOOD COURT BANQUET MULTIPLEX HOTEL MULTIPLEX HOTEL HOTEL RETAIL SHOPS RETAIL SHOPS RETAIL SHOPS • Floors : G+5 • Total Height: 33.6 Meter. C I T Y S Q U A R E M A L L Ajmer Client : Shriji Group Status : Completed Built up Area : 300000 sft
• Prepare presentation drawings, • Working drawing, • Co-ordination with structural consultant, • Electrical drawings, • RCPs, • Flooring plans, • Façade details, • Landscape layout, • Co-ordination with different brand stores, • Atrium & staircase railing details, • Signage planning, • Prepare completion drawings.

GROUND FLOOR

Mall entry,

Retail Shops

UPPER GROUND FLOOR

Hotel entry,

Hotel Reception,

Café,

Retail Shops,

C I T Y S Q U A R E M A L L Ajmer
WORKHALL SERVICE CORE WORKHALL TYPICAL FLOORS LOWER GROUND FLOOR
• A 4-storey office complex. • Total area: 13,200 sft excluding basements. • Floors : G+4 • Total Height: 19.5 Meter. • 3 floors with 6 separate offices. Each office’s area is around 750 sft and has- One meeting room, - One manager’s cabin, - One Conference room, - Open terraces, - Recreational room. TYPICAL FLOOR PLAN A M T O W E R S Gurgaon Client : Mr.Manmohan Status : Under Construction Built up Area : 13200 sft Key Role:• Concept Development • Massing models • Working Drawings • Flooring Layouts

Role:-

This hotel building is divided into two blocks. The site has some steep contours. Client also has top two floors in the upper block as his residence. PROGRAM:• Parking • Kitchen dining • Banquet, • Gym • Spa • 11 rooms • 4 suites/ 8 rooms • Terrace restaurant Key
• Prepare conceptual drawings • Working drawing, • Co-ordination with structural consultant • Electrical drawings • RCPs S I R M O U R H O T E L Himachal Pradesh Client : Mr. Surendra Thakur Status : Under Construction Built up Area : 15200 sft

Key Role:-

• Concept development,

Presentation drawings,

Sanction drawings,

Working drawings,

Co-ordination with plumbing consultant

• Site development,

A

H D W A R A H O T E L

N
T
Himachal Pradesh Client : Shriji Status : Completed Built up Area : 30700 sft

Dehradun is a fast developing city. The population is also increasing rapidly, so that these small towns and cities are changing into metropolitan cities. In Dehradun there is no scarcity of land but a major part of the land is acquired by the Forest Department and this cannot be used to build buildings on the other hand the business is growing and expanding very fast. Therefore, huge multi-storied buildings for commercial organizations are being constructed and the number of such complexes is increasing fast day by day. Production has increased very much, and the factories have to open their offices and show rooms at various places for marketing their products. Therefore buildings for these commercial purposes have become a necessity.

U L T I

L E V E L P A R K I N G W I T H

C O M M E R C I A L C O M P L E X

M
Thesis Client : MDDA Status : Proposed Built up Area : 180000 sft

M M E R C

A

N G W

C O M P

E

M U L T I – L E V E L P A R K I
I T H C O
I
L
L
X Thesis

The site is situated in the LAJPAT NAGAR III area easily accessible from outer ring road at the distance of around 150 meter on both sides of the road it has 17 and 22 meter wide roads.

The site is around 1.08km long and 230 meter wide with a triangular portion attached to one of its edge.

The scheme should be such that all spaces came into balance and compliment each other. the need and the use of the area should be promoted and enhanced in terms of quality as well as aesthetically.

LANDSCAPE ACHIEVED STANDARD EXISTING

MIX LANDUSE

GREEN AREA

PUBLIC

/SEMI PUBLIC

COVERAGE

R E D E V E L O P M E N T O F L A J P A T N A G A

Academic

R
Sem 7th Client : Studio Work Status : Proposed
17.2% 22%
18.5% 15 20% 25.6% RESIDENTIAL 31% 45 55% 35% COMMERCIAL 32% 4 5% 25%
12% 8 10% 8.8%
FAR 130% 150% 40% GROUND 40.8% 40% 29%
EXISTING EXISTING PROPOSED

ROAD NETWORK

The focus of the problem was to create a better space for commercial and residential activities as well. there are three main zones i e commercial, mixed use and residential the idea is to integrate them into one place without being disturbed by each other.

Market is proposed in the centre of the site. it acts as a focus. a plaza is created in the centre to provide an open space. some sport facilities and food court provided in this area.

MIXED USE

Mixed use area is proposed in between the commercial and residential area to join these two areas smoothly. this would help to provide more facility to people who lived in the colonies.

RESIDENTIAL

GREEN AREA

Residential area is proposed at both the ends to avoid the traffic congestion in the market .

R E D E V E L O P M E N T O F L A J P A T N A G A R

Academic Sem 7th COMMERCIAL BUILT/UNBUILT
COMMERCIAL

• The division of spaces are provided in a manner to provide equal share of public and residential areas

• Public spaces are combined to form a large public area common to all.

• The housing should have an orientation that provides enough sunlight to maximum number of spaces.

• The parking spaces should be adequate for all the units.

• Public areas more centralized to give equal access to residential population.

• Housing areas are scattered throughout site/ varying density.

• Organic distribution of site i.e. roads & spaces.

Site area :123047 sqm.

Population :7500

Household size :5 Dwelling units :1500 Primary schools :2000 sqm. High school :6000 sqm. Club, community centre & Other public areas :2000 sqm.

G R O U P H O U S I N G Academic Sem 8th Client : Studio Work Status : Proposed

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Portfolio_Musheer_Architecture_BIM by musheer mohd - Issuu