
2 minute read
NEWS FROM THE NETWORK: STRATEGIC ALIGNMENT
- ESTABLISHING FOUNDATIONS -
• GIS Linear Referencing: GIS Linear Referencing on Hudson line completed, Harlem and New Haven lines in progress.MNR
Advertisement
• Subway EE Cloud Monitoring PoC: Completed EE monitoring proof of concept API with cloud vendor Claddagh. Claddagh is a possible replacement for legacy LiftNet monitoring. MTA IT
• MTA IT Cyber Security | Microsegmentation: Implementation of microsegmentation firewall rules to protect EAM infrastructure. MTA IT
• Agile Methods and Implementation: Ongoing learning and implementation of Agile. MTA IT
• OMNY 2-Way Work Order implementation: Development and deployment of OMNY/EAM integration for equipment service and repair. MTA IT
• Subway Train Trouble Incident Integration: Completed Train Trouble interfaces between EAM. MTA IT
• MNR Layover Cleaning: Kickoff of new layover cleaning interface for MNR. MTA IT
• SIRS/STARS Incident Report: Rollout of SIRS/STARS integration for Subway rail incidents. MTA IT
• GIS Portals Azure Migration: Migration of separate on-prem GIS Portals (IT GIS, DOS, MNR, LIRR, C&D, B&T, Buses) to a single, robust, highly available, Azure GIS Portal. MTA IT
• MTA Assets Dataset Development: Definition of a common schema to contain the data, establishment of security classifications for the spatial and attribute data, and a plan to refresh this dataset from agency sources on a regular basis. MTA IT
• MTA Agile Transformation: Transitioned existing projects completely to Jira and GIS Team is applying Agile methodology exclusively in managing its workload (Sprints, Continuous Improvement, etc.). MTA IT
• Layover Cleaning (Hexagon): Development/configuration in progress. MTA IT
• LIRR ESA Hexagon Loads: Several loads completed for Mechanical Equipment, Tail Tracks and Pumps. Load for Card Readers in progress. MTA IT
• LIRR Document Migration for Bridges and Viaducts: Development is complete and testing in progress for 900K documents. MTA IT
• Engineering Overcoat Paint: Deployed Elevated Structure Overcoat Paint project with 12 personnel in EAM Desktop & Mobile. Preparing for Go-Live in mid-July. SUBWAYS
• Facilities HVAC: Deployed HVAC project to 172 users in Desktop & Mobile. SUBWAYS
• Facilities Fire Suppression: Trained 11 Fire Suppression User Acceptance Testing personnel in EAM Desktop & Mobile. SUBWAYS
• Stations Specialized Cleaning: Deployed Specialized Cleaning Phase 1 (HDC) to EAM Desktop & Mobile SUBWAYS
• Track & Third Rail Corrective Maintenance: Completed Corrective Maintenance User Acceptance Testing with 40 personnel in EAM Desktop & Mobile. SUBWAYS
• Power System Operations & Test East & West: Deployed System Operations and Test East & West projects to 130+ personnel in EAM Desktop & Mobile. SUBWAYS
• Automated Fare Collection: Completed data integration documentation to two external systems for AFC Bus and Subway equipment in EAM in preparation for development. SUBWAYS

• Automated Fare Collection: Testing AFC data migration, including hierarchy buildout, to EAM - the initial step in data integration. SUBWAYS
• Central Electronics Shop: Deployed Bus Sign Repair to 11 personnel in EAM Desktop. SUBWAYS
• Telecommunications: Documented requirements and built out initial design considerations for the Remedy Replacement project in EAM Desktop & Mobile. SUBWAYS
• Department of Car Equipment - Emergency Response Temperature Check Pilot (Corona) | DCE:
Deployed EAM for Rolling Stock to Corona Shops (Revenue & Non-Revenue Fleet) including Pre-Service Inspection and Temperature Survey in EAM Mobile. SUBWAYS
Deployed the Train Troubles integration and deployment for 7 Line/Corona Shops. The next step is to fully incorporate Component Movement and Warranty Tracking for the next fleet. SUBWAYS