Pump Industry Summer 2022 Digital Edition

Page 10

NEWS

MAJOR TAS IRRIGATION PROJECT TO REFURBISH AND CONSTRUCT PIPELINES, PUMP STATIONS

T

he Tasmanian Government has launched the Preferred Option Design for the Sassafras Wesley Vale Irrigation Scheme Augmentation, which includes 95km of new and refurbished pipeline and five pump stations. This Tranche Three irrigation project is expected to double the amount of high-surety irrigation water delivered to farmers in the productive North West Tasmanian region. It is also expected to create an estimated 120 jobs and underpin $28.3 million in on-farm investment. The Tasmanian Government has committed $18.34 million, the Australian Government $30.57 million and landowners $13.81 million to refurbish existing infrastructure and construct additional pipelines and pump stations to increase the capacity of the scheme from 5,660 to 13,686 megalitres. Expected to be operational for the 2025/26 irrigation season, this water will enable farmers to invest,

diversify, expand and value add, as well as provide muchneeded guarantees for crop contracts and on-farm investment leverage. The Preferred Option Design follows a similar alignment to the existing scheme and includes 95km of new and refurbished pipeline, five pump stations and the replacement of 70 property outlets. Water will be sourced at the Great Bend Pump Station on the Mersey River and backed up by releases from Parangana Dam. This project is one of ten Tranche Three irrigation schemes being developed by Tasmanian Irrigation to assist the Tasmanian Government in reaching its target of increasing the farm gate value of the state’s agricultural sector to $10 billion a year by 2050.

KELAIR - FIRE PUMPS Containerised Fire Protection Pumpsets Kelair Pumps Building & Fire Division is one of the most technically-competent suppliers in Australia. We can provide a complete range of fire sprinkler pumpsets for all applications, fully compliant to technical specificiations.

We know the importance of choosing the right equipment to match your process. With our extensive range of pumps, first class customer service and ongoing comprehensive support, Kelair Pumps are second to none when it comes to your pumping requirements.

WHEN PUMP KNOWLEDGE MATTERS

Rely on Kelair

8

pump industry | Summer 2022 | Issue 38

11/21

Benefits of containerised fire pump units: - Purpose built to individual requirements - Compact, pre-fabricated, complete packaged solution - Simple to mobilise and transport - Fully tested to AS2941/ISO9906 and pre-commissioned - Wall insulation keeps operational noise to a minimum - Turnkey installation saves time and labour costs

Find out more today 1300 789 466 www.kelairpumps.com.au

www.pumpindustry.com.au


Turn static files into dynamic content formats.

Create a flipbook

Articles inside

maintenance solutions for PCPs reduce downtimes to a minimum?

3min
pages 72-73

Pumping liquids with entrained gas

2min
pages 74-75

Efficient operations of pump systems (Part 5

8min
pages 70-71

Rethinking the NPSH matrix

11min
pages 66-69

Energy efficient pumping savings

8min
pages 62-65

really know what is best for your application?

4min
pages 60-61

Compressed Air Energy Storage: pumping air underground to support Australia’s energy grid

10min
pages 56-59

Installing Bendigo’s biggest valves to cater for future growth

3min
pages 54-55

Selection considerations for wastewater pumps

7min
pages 52-53

Extending service life and reducing downtime with high-quality coatings

3min
pages 32-33

Gippsland Water’s new sewer pump station: finding success across performance and amenity

5min
pages 50-51

Customisable variable speed and soft-start solutions for Medium Voltage Pumping Installations

3min
pages 26-27

The key to efficient wastewater remediation? Modular and flexible Bulk Liquid Storage Tanks

5min
pages 44-45

State of the Industry 2022 – anticipating better times ahead

32min
pages 34-43

Urban Utilities ready for growth in South East Queensland

5min
pages 46-49

Supporting customers during the supply chain chaos

3min
pages 24-25

Galbraith Engineering Ltd and becomes Oceania’s largest fluid handling supplier

1min
pages 10-11

Here comes the story of the Shurricane

2min
pages 22-23

The FK Range by DAB: submersible pumps for sewage

2min
pages 20-21

pump stations

2min
pages 8-9

PIA reflects on 2021 and looks towards 2022

5min
pages 18-19

Mardie salt project awards $16 million pump contract

2min
pages 6-7

Tender released for Haughton Pipeline works

3min
pages 14-15

Local Townsville business contracted to replace 120kg pumps

3min
pages 12-13
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.