Compilation of selected works from 2016-2022

Page 1

compilation of selected Design works from 2016-2022 by


about Being born and brought up in nature’s own paradise “Kerala” I have always been closely associated with nature from childhood and wanted to be a part of it. I also earnestly yearn to create beautiful things on my own and thought that architecture can satisfy my imagination in space, materials and colour. Having followed my passion and taken architecture and studied for the past semesters, what has been engrained in us is “ the process of architecture ” (from analysis of site, concept and aspirations, connection to the context, etc…) more than the end product. We are trained to analyse the context of the design - about life styles, ways of seeing, ways of living - human behaviour etc. this contributes more to the function, about how our built environment caters and nurtures to the individual, the group and community at large. The intangibles are as important as the tangibles, which is the key design generator. We are guided to see if architecture is rooted in place, its culture and the aspirations of the society are considered during design process. The buildings have to be mired in context and not alien implants from across the seas.


contents 01. . EMBRACE RURAL RESILIENCE, 02. 10 semester. VIRIDESCENT QUIETUDE, 03. 9 semester. URBAN PLAZA, 04. INTERNSHIP -8 semester. ENVISAGING THE ETHREAL, 05. 4 semester. OTHER WORKS, 06. ILLUSTRATIONS, DETAILINGS, RENDERS. nAVAH LOUNGE,

PROFESSIONAL-PROJECT ARCHITECT

th

th

th

th


01.

NAVAH LOUNGE VIJAYWADA, aNDHRA PRADESH, india.

PRoffesional - PROJECT ARCHITECT


Invicon Navah located in Vijaywada, Andhra Pradesh Brief of this project was to re-design a lounge space which was dedicated for these residential units, there had been an exisiting proposal, since the builders were not able to achieve the numbers which they intended due to lack of community spaces, lounge..etc, so we tried understanding the old design with multiple criterias like strength, weakness, threat, opportunities.... based on the study, we concluded in designing this space. First two levels of A, B Block and the threshold between these blocks were boundaries which was given to design, by creating an axes at ground level which acts as a passage that emphasizes the axis from entry node surrounded by landscaped planters & seaters which hollistically becomes one community space was the design provided here at masterplan level. Exterior & Interior finishes of this project were treated with contrasting materials like corten steel, dark grey ips, light grey ips, rust finish paints etc...at various junctions different levels of strategies has been implemented to solve the design with logical strategies & also to achieve visual aesthetics.

Block - A Entry node

Pedestrian node Lobby

Block - B

Clubhouse node

Invicon Navah - Site Plan


Ground Floor Plan of Lounge - Old (left) and New Proposal (right)

Previous Proposal

Current Proposal

-By analysing the user behaviour based on activities, we were able to identify spaces that were required to function and also to enhance the experience, specified activities based spaces were added in new proposal. -Existing Blockworks were removed, to achieve porosity was the ultimate goal, we achieved it throughout the lobby using landscapping which created calm and serene environment.....where as the previous proposals had lot of walls that created barriers between lot of activities. -By creating a landscaped park inside a built a entity to achieve characteristics of an open park was a strong thought which constantly made us arrive at such kind of a space, also elements like sculpture typically found in an open park....staircase was designed in a way that it would resembele an artistic sculpture while looking at it visually.

Interior View Of Grand Lobby


First Floor Plan of Lounge - Old (left) and New Proposal (right)

Previous Proposal

Current Proposal

-First Floor consists of Multipurpose Hall, Business Lounge at A Block & Gym at B Block, Rustic pallete used in ground floor level were also used here to enhance the user experience, large joinerys were used here to bring in chunk amount of natural lights at walls facing facades on both the blocks. -Various types of portals were used to hightlight entrances of different rooms...at ground level most of rooms were designed using cement fibre board finished with criag & rose - rust finish paint, where at first floor most of the entrances has steel grey granite jams happing on all four sides.

Interior View Of Grand Lobby


Interior View Of Grand Lobby



Interior


Interior View Of Grand Lobby

Exterior View Of Lobby

Interior View Of Creche

Interior View Of Indoor Games Room

View Of Informal Lounge

Interior View Of Multipurpose Hall


SSL 100.75 LVL FFL 101.050

DRIVEWAY

SSL 101.125 LVL FFL 101.175

block work & joinery layout detailed drawing

450

SEATER @450MM FROM FFL

SEATER @450MM FROM FFL

4 EQUAL PARTS FG1

FG1

SD9

SD9

SD9

SD9

FG1

FG1

1250

400

450 2550

2550

2050

4240 300

PLANTER BOX - P7 @450MM FROM FFL

PLANTER BOX - P8 @450MM FROM FFL

1745 400

V1

V1

SSL 101.125 LVL FFL 101.200

900

V1

1370

V1

1300

1300

600

D7 D5

D5

D5

D7

D6 ALIGN BLOCK WORK TO REF LINE 10 EQUAL PARTS

SD8

SD8

SD8

SD8

SD8

SD8

SD8

4200

4940

3600 PLANTER BOX - P5 @450MM FROM FFL

PLANTER BOX - P4 @450MM FROM FFL 4200

600

2700

600

2700

ALIGN SEATERS TO REF LINE

SEATER - S2 @450MM FROM FFL

SEATER - S3 @450MM FROM FFL

PLANTER BOX - P9 @450MM FROM FFL 600

4200

PLANTER BOX - P2 @450MM FROM FFL

ALIGN PLANTER BOX TO WIDTH OF SHAFT

PLANTER BOX - P6 @450MM FROM FFL

ALIGN PLANTER BOX WITH COLUMN WIDTH

ALIGN SEATER TO COLUMN

SEATER - S1 @450MM FROM FFL 3860

SSL 101.275 LVL FFL 101.350

1700

EQ

EQ

EQ

SD1

480

605

480

ALIGN BLOCK WORK TO REF LINE

2370

1800 FG2

FG2

SD7

SD7

SD7

FG4

FG4

FG4

FG4

SSL 101.275 LVL FFL 101.350

SSL FFL

100.75 LVL 100.90

GROUND FLOOR BLOCKWORK & JOINERY LAYOUT

FLOOR BLOCKWORK LAYOUT scaleGROUND - nts

SCALE- 1:100

SD7

FG2

FG2

4 EQUAL PARTS

EQ SD1

SSL FFL

900

PLANTER BOX - P1 @450MM FROM FFL

2980

ALIGN BLOCK WORK TO COLUMN

ALIGN BLOCK WORK TO REF LINE SEATER - S4 @450MM FROM FFL

450

GD2

D1

ALIGN BLOCK WORK TO REF LINE

100

1800

670

BRICK JAALI TO DETAIL

370 550

1700

ALIGN WOR BEAM

595

1025

230

2350

V1

D1

V1

3000

1480

1500

800

ALIGN WOR BEAM

PLANTER BOX - P10 @450MM FROM FFL

550

100

300

1320

ALIGN BLOCK WORK TO COLUMN

W1 EQ

3000

450

SD6

EQ

350

1500

ALIGN PLANTER TO COLUMN

970

300

GD1

PLANTER BOX - P3 @450MM FROM FFL TYPE 1

100

SD8

900

4000

1700

SD8

ALIGN BLOCK WORK TO REF LINE 900

900

ALIGN BLOCK WORK TO REF LINE

SD8

ALIGN BLOCK WORK TO REF LINE

100.45 LVL 100.60

FG5

FG


SSL 100.75 LVL FFL 101.050

DRIVEWAY

architecture SCHEDULE OF JOINERY OPENING SIZE SILL LVL (MM) FROM FFL WIDTH (MM)

TYPE

RED research+design

villa b, sai anugraha, 27/1, rukmani street ext.,besant nagar, chennai - 600 090 t-044.430.33669, www.architecturered.com copyright 2021 architectureRED all rights reserved

LINTEL LVL (MM) FROM FFL

DESCRIPTION

Navah Lounge & Clubhouse

SLIDING

SD1

3000

NA

BEAM BOTTOM

1 SLIDING AND 2 FIXED PANELS

SD5

2680

NA

BEAM BOTTOM

2 EQUAL SLIDING SHUTTERS

SD5A

2680

NA

SD6

2765

NA

2 EQUAL SLIDING SHUTTERS 2300

project:

project number:

21015

client:

Invicon

2 EQUAL SLIDING SHUTTERS

SD6A

2765

NA

SD7

1650

NA

BEAM BOTTOM

4 EQUAL 2FIXED, 2 SLIDING

SD8

1260

NA

BEAM BOTTOM

10 EQUAL 6 FIXED, 4 SLIDING

SD9

1650

NA

BEAM BOTTOM

4 EQUAL 2FIXED, 2 SLIDING

FG1

1200

NA

BEAM BOTTOM

FG4

695

NA

LINTEL BOTTOM

FG5

545

NA

LINTEL BOTTOM

FG6

2445

NA

LINTEL BOTTOM

800

NA

2300 2300

2 EQUAL SLIDING SHUTTERS

mep: structural: landscape:

general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architectureRED. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the drawings shall be brought to the notice of the architects' office for clarifications. 4- all drawing units are in the metric scale

DOOR

V1

V1

D6 ALIGN BLOCK WORK TO REF LINE

V1

D5

D5

V1

D5

V1

D1

D5

D2

1000

NA

D3

1500

NA

D4

1200

NA

D5

800

NA

2300

D6

900

NA

BEAM BOTTOM

D7

1150

NA

BEAM BOTTOM

GLASS DOOR

900

2020

NA

2445

NA

GD3

2400

NA

BEAM BOTTOM

GD4

2240

NA

BEAM BOTTOM

W1

1800

900

2300

W2

1460

900

BEAM BOTTOM

GD1

ALIGN BLOCK WORK TO REF LINE

GD1 GD2

Marking & Stacking Of Bricks - Jaali Wall

2300

750 X 1100

BEAM BOTTOM

600

W2

680

TYPE 2

D2

W4

N BLOCK RK TO M B219

N BLOCK RK TO M B323

ALIGN BLOCK WORK TO REF LINE

Wall Niches

SD5

GFC

purpose of issue: 1155 590

drawn by

date of issue: revision:

LEGEND FG5

SD1

EQ

EQ

SD1

VI 05-02-2022 R3 19-12-2021

R1

27-12-2021

R2

12-01-2021

R3

05-02-2022

R4

08-06-2022

scale and north :

CD drawing title. SSL FFL

checked by

R0

sheet no.

100

ZN

EQ

570

EQ FG5

600

G5

BEAM BOTTOM

100.75 LVL 100.90

1: 100 1/2 GROUND FLOOR - BLOCK WORK & JOINERY SCHEDULE

A1.01

Granite Laying & Matching Floor Joints

drawing no.

With Planters & Seaters


P6 BOTTOM

A R

R R

500

SEATER - S1 @450MM FROM FFL

R

750

750

R

R

1500 R

750

1000

R

1500

1000

R R

R

1000 R

R

1000

1000

R

1000

R

1500

B

B

R

1000

B

750

R

R

750

R

1000

R

REF. LINE - 5 ALIGN WITH PLANTER BOX P1

1500

A B

R

1000

R

750 500

R

A

750

R R

1000

R

R

PLANTER BOX - P1 @450MM FROM FFL R

500

1500

R R

750

A

R

500

B

1500

A

R

B

B

R 500

REF. LINE - 7 REF. LINE - 6 ALIGN WITH SEATER S1

A

R

750

A

REF. LINE - 5 ALIGN WITH PLANTER BOX P1

1000

R

R

A

500

REF. LINE - 6 ALIGN WITH SEATER S1

R

R

A

R

1000

500

B

R

1500

R

R

R

A

A

1000

A

P6 BOTTOM

ALIGN REFERENCE LINE B TO COLUMN A45 REF. LINE - 7

REF. LINE - 4

REF. LINE - 4

500

R

REF. LINE - 1

REF. LINE - A

R

EQ

A B R

1000 1500

R R

EQ

A

1000 1250

R

500 EQ

R R

R 1500

A

REF. LINE - 2

SEATER 05 @450MM FROM FFL

B

R R

R

EQ

A

750

1250 1500

R

1250

EQ

EQ

EQ

EQ

REF. LINE - C

REF. LINE - B ALIGN REFERENCE LINE B TO COLUMN A45

600

REF. LINE - 3

R

A

R

500

1500 R

ALIGN WITH THIS OPENING

ALIGN WITH SEATER 05

A

R

R 1500

B ALIGN WITH SEATER 05

R

750

A

REF. LINE - 3

1250

R

REF. LINE - 2

R

B

500

R

ALIGN REFERENCE LINE B TO COLUMN A45

R

REF. LINE - 1

R

1500

A

ALIGN WITH THIS OPENING

REF. LINE - D

LAYING INSTRUCTIONS

SCALE- 1:50

ALIGN REFERENCE LINE B TO COLUMN A45 REF. LINE - 7

REF. LINE - 7

REF. LINE - 6

REF. LINE - 6

ALIGN WITH SEATER S1

ALIGN WITH SEATER S1 SEATER - S1 @450MM FROM FFL

REF. LINE - 5 ALIGN WITH PLANTER BOX P1

REF. LINE - 5 ALIGN WITH PLANTER BOX P1

PLANTER BOX - P1 @450MM FROM FFL

REF. LINE - 4

REF. LINE - 4

ALIGN WITH THIS OPENING

ALIGN WITH THIS OPENING

ALIGN REFERENCE LINE B TO COLUMN A45 SEATER 05 @450MM FROM FFL

REF. LINE - 3

REF. LINE - 3 ALIGN WITH SEATER 05

ALIGN WITH SEATER 05

REF. LINE - 2

REF. LINE - 2

REF. LINE - 1

REF. LINE - 1

REF. LINE - A

REF. LINE - C

REF. LINE - B ALIGN REFERENCE LINE B TO COLUMN A45

600

REF. LINE - D

FLOORING FINISHES SCALE- 1:50

REF. LINE-E

REF. LINE-F

REF. LINE-G

PLANTER P7

STEEL GREY GRANITE 20MM THK.

MUDHUGAL GREY GRANITE 20MM THK.

REF. LINE-H

PLANTER P8

PIGMENTED POLISHED CONCRETE

REF. LINE-16

REF. LINE-15 REF. LINE-14

GRANITE SIZES: A - 300MM X 1500MM B- 600MM X 1500MM

REF. LINE-13 REF. LINE-12

PLANTER P3

PLANTER P4

PLANTER P5

REF. LINE-11

REF. LINE-10 SEATER 02

SEATER 05

REF. LINE-9 PLANTER P2

PLANTER P6

REF. LINE-8

REF. LINE-7 REF. LINE-6

SEATER 01

REF. LINE-5

PLANTER P1

REF. LINE-4

REF. LINE-3 REF. LINE-2

SEATER 05

REF. LINE-1

REF. LINE-A

Gf grand lobby flooring layout - part01

REF. LINE-B

REF. LINE-C

REF. LINE-D

KEY PLAN

scale - nts

SCALE- NTS


architecture

900 1200

30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR

275

EQ

1500

EQ

900

1200

2420

TERRACE FFL @ +5135 MM

6MM THK MS SHEET AS PARAPET @1000 FROM TOP OF TREAD WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS

300

31 30

100

TERRACE SSL

XX 28

10MM THK MS SQUARE SOLID BAR - GAURD RAIL WELDED TO SIDE OF MS FOLDED STAIRS

21015

820

20

client:

Invicon

10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS

09

6MM THK MS FOLDED STAIRS

EQ EQ EQ EQ EQ EQ

17

16

BLOCK WORK UPSTAND general notes: 1- these drawings may not be used, duplicated, modified or changed in any manner without the written consent of architectureRED. the user & its agents will be liable for any unauthorized use, duplication, modification or change. 2- the drawings & dimensions are to be read & not measured. 3- any discrepancies noticed in the drawings shall be brought to the notice of the architects' office for clarifications. TERRACE4-FFLall drawing units are in the metric scale

1000

900

19

900

15

14

13

11

12

20MM THK STEEL GREY GRANITE

ALIGN FINISHED EDGE OF STAIRS TO OPENING

SCALE- 1:25

project number:

landscape:

DETAIL B

PLAN @ +1700 MM FROM FFL

Navah Lounge & Clubhouse

27

30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR

275

structural:

26

THK MS SHEET AS PARAPET TREAD :6MM 275MM @1000 FROM TOP OF TREAD RISER : 165MM WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS

project:

mep: 29

275

10

11

1825

900

research+design

18

BRICK JALI SCREEN WALL

10

RED

villa b, sai anugraha, 27/1, rukmani street ext.,besant nagar, chennai - 600 090 t-044.430.33669, www.architecturered.com copyright 2021 architectureRED all rights reserved

6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER

09

04 10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS

110

900

08

450

275

07

925

275

06

275

900

05

275

900

275

550

03DETAIL A

275

85

02

275

1175/EQ

01

275

1175/EQ

275

300

275

PLAN @ +3450 MM FROM FFL SCALE- 1:25

TREAD : 275MM RISER : 165MM

6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER

17 16 15 14 6MM THK MS FOLDED STAIRS

13

6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER

18

275

275

19

20

12

900

18

08 07

1175/EQ

grand lobby flooring & ms staircase detailed drawing TOP PLANTER BOX @+825MM

DETAIL C

19

20

21

22

900

900

06

05

23

09

10

275

11

01

EQ EQ EQ EQ EQ EQ

16

15

14

DETAIL A XX

25

SCALE- 1:5

DETAIL A

31

12

13

900

1175/EQ

GROUND FLOOR FFL @+/-0MM

17

24

02

SECTION XX

SCALE- 1:25

TERRACE FFL @ +5135 MM

10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS

30

29

28

27

26

TERRACE FFL

10MM THK MS SQUARE SOLID BAR - GAURD RAIL AT 900 FROM TOP OF TREAD WELDED TO SIDE OF MS FOLDED STAIRS

900

550

03

275

04

31 30

TERRACE SSL

29

PLAN @ +3450 MM FROM FFL

PLAN @ +6200 MM FROM FFL

TREAD : 275MM RISER : 165MM

TREAD : 275MM RISER : 165MM

SCALE- 1:25

SCALE- 1:25

28 27

6MM THK MS FOLDED STAIRS

26

30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR

20

21

22

900

19

1000

6MM THK MS SHEET AS PARAPET @1000 FROM TOP OF TREAD WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS

20MM THK GRANITE TRAD AND RISER 18

30MM MS CHS GRAB BAR @900 FROM TOP OF TREAAD WELDED TO 6MM THK MS PARAPET WITH 10MM DIA MS ROUND SOLID BAR

900

BLOCK WORK UPSTAND

1000

900

DETAIL B 20MM THK STEEL GREY GRANITE

17

85

12MM THK PLY TERRACE FFL

16 15

PLANTER BOX

24

6MM THK MS FOLDED STAIRS

13 12

25

20MM THK GRANITE TRAD AND RISER

31

30

29

275

28

27

26

6MM THK MS SHEET AS PARAPET purpose of issue: @1000 FROM TOP OF TREAD GOOD FOR CONSTRUCTION WELDED TO SIDE OF 6MM THK MS FOLDED STAIRS

6MM THK MS FOLDED STAIRS XX WELDED TO 6MM THK MS LANDING BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER

VI

drawn by

08

checked by 07

DETAIL C date of issue:

07/05/2022

revision:

TOP PLANTER BOX @+825MM

165

150

6MM THK MS FOLDED STAIRS LANDING WELDED TO 6MM THK MS BASE PLATE, WHICH IS BOLTED TO THE WALL AND CONCEALED IN PLASTER

495

FRAMEWORK BUILT OF 25X25 MM MS SHC

TERRACE FFL

14

23

06

05 04

GROUND FLOOR FFL 03 02 01

PLAN @ +6200 MM FROM FFL TREAD : 275MM RISER : 165MM

SCALE- 1:25

DETAIL B

GROUND FLOOR FFL @+/-0MM

SCALE- 1:5

scale and north :

TAIL A DETAIL C SCALE1:5

SCALE- 1:5

metal staircase - plan & section

sheet no.

SECTION XX

SCALE- 1:25 drawing title.

VARIES 1/2 METAL STAIRCASE DETAILS

scale - nts


4 EQUAL COURSE WORK

ALIGN REF. LINE TO PLASTERED FIRST FLOOR LINTEL LVL.

REF. LINE A ALIGN REF. LINE TO FINS

REF. LINE C ALIGN REF. LINE TO PLASTERED COLUMN A45

11 EQUAL COURSE WORK

B A B A B A B A B A B ALIGN REF. LINE A TO 1485MM LVL. B FROM FIRST FLOOR A FFL. B A B A B A B A B A B A B A B ALIGN REF. LINE TO A PLASTERED B UPSTAND LVL. A B A B A B A ALIGN REF. LINE B TO PLASTERED A GROUND FLOOR B LINTEL LVL. A B A B A B A B NGE MS L FLANGE A LVL. ERED LINTEL LVL. @PLASTERED LINTEL B A B A B A B A B A B A B A B A B A B A

REF. LINE B ALIGN REF. LINE TO CENTER OF SD4A

REF. LINE D ALIGN REF. LINE TO PLASTERED COLUMN A45

KEY STONE / START BRICK

MS L FLANGE @PLASTERED LINTEL LVL.

PORTAL P5

PORTAL P6

PORTAL P5

MS L FLANGE @MS LINTEL BTM. L INCREASE WALL PLASTER ALIGN WITH FINISHED JAALI LVL..

PORTALP6P5 PORTAL

17 EQUAL COURSE WORK

HANDRAIL TO DETAIL

INCREASE WALL PLASTER ALIGN WITH FINISHED JAALI LVL..

10 EQUAL COURSE WORK

ALIGN WALL PLASTER TO FINISHED JAALI LVL.

KEY STONE / START BRICK

KEY STONE / START BRICK

MS L FLANGE MS L FLANGE MS L FLANGE @PLASTERED LINTEL@PLASTERED LVL. LINTEL LVL. LINTEL LVL. @PLASTERED

28 EQUAL COURSE WORK

MS L FLANGE @PLASTERED LINTEL LVL.

P1

P2 PORTALPORTAL P1

PORTAL P1

PORTAL P3

PORTAL P2

PORTALP3P2 PORTAL ALIGN WALL PLASTER TO FINISHED JAALI LVL.

PLANTER P9

PLANTER P9

BLOCK --jaali JAALI CLADDING INSTRUCTIONS aA block laying instructions

SCALE- 1:25

scale - nts

ALIGN REF. LINE TO PLASTERED FIRST FLOOR LINTEL LVL.

ALIGN REF. LINE TO 1485MM LVL. FROM FIRST FLOOR PTO FFL. MM LVL. RST FLOOR FFL.

JAALI UPTO +1485MM LVL. FROM FIRST FLOOR FFL.

MS LINTEL FRAME ANCHORED TO SLAB

MS LINTEL FRAME ANCHORED TO SLAB

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

5MM THK MS L-FLANGE WELDED TO MS LINTEL FRAME

5MM THK MS L-FLANGE WELDED TO MS LINTEL FRAME

8MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT

8MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT

PORTAL P5

JAALI UPTO +1485MM LVL. FROM FIRST FLOOR FFL.

HANDRAIL TO DETAIL

ALIGN REF. LINE TO PLASTERED UPSTAND LVL.

ALIGN REF. LINE K TO PLASTERED x130MM GROUND FLOOR GE LINTEL LVL. RED TO BEAM.

DETAIL A

DETAIL A

VE N BRICKS

12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT

12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT

ADHESIVE BETWEEN BRICKS

ADHESIVE BETWEEN BRICKS

230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT

230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.

DETAIL A

12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT. GD1.

THK BLOCK WORK UPTO M LVL. FROM FFL

R

LOCKWORK WITH HED PLANTER P3

ALIGN BLOCKWORK WITH FINISHED PLANTER P3

FFL

FFL

SCALE- 1:25

scale - nts

230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT

ADHESIVE BETWEEN BRICKS

ADHESIVE BETWEEN BRICKS

12MM THK. V BOARD DETAIL A FINISHED WITH C&R RUST PAINT.

ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

DETAIL A

50X25MM MS HORIZONTAL FRAMEWORK 5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.

12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT. GD1.

CORTEN STEEL TILE.

CORTEN STEEL TILE.

PLANTER P3

PLANTER P3

FFL

SECTION -- BJAALISECTION -B A BLOCK FRAMEWORK SCALE- 1:25 SCALE- 1:25

230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT

MS L FLANGE 5MM THK @PLASTERED LINTEL LVL. MS 100x130MM L-FLANGE ANCHORED TO BEAM.

CORTEN STEEL TILE

PORTAL P1

SECTION of portal p4

ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.

50X25MM MS HORIZONTAL FRAMEWORK

5MM THK 5MM THK MS 100x130MM MS 100x130MM MS L FLANGE L-FLANGE L-FLANGE @PLASTERED LINTEL LVL. ANCHORED TO BEAM. ANCHORED TO BEAM. 50X25MM MS 50X25MM MS HORIZONTAL FRAMEWORK. HORIZONTAL FRAMEWORK.

110(B) X 75(H) NISHIED GHT GREY PAINT

HANDRAIL TO DETAIL

ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.

CORTEN STEEL TILE

PORTAL P2

FFL

FFL

SECTION - C

SCALE- 1:25

SECTION - C

SECTION of portal p3 & p6 SCALE- 1:25

scale - nts

FFL

SECTION - D

SCALE- 1:25

SECTION - D

SCALE- 1:25


LEGEND: KEY STONE / START BRICK

PLASTER.

REF. LINE E

REF. LINE F

ALIGN REF. LINE TO CENTER OF OPENING

ALIGN REF. LINE TO WALL OFFSET

FULL BRICK

D3 WOODEN JOINERY

STRUCTURAL SLAB.

STRUCTURAL SLAB. PLASTER. REF. LINE G ALIGN REF. LINE TO CENTER OF GD1

D3

SCALE- 1:25

FFL

TO

5MM THK MS BASE PLATE ANCHORED TO SLAB. 50X50MM MS HORIZONTAL FRAMEWORK.

6MM THK PLY FINISHED WITH AS PER SPECIFICATION.

PORTAL P6 5 PORTAL P6

2MM THK MS PLATE WELDED TO MS LINTEL.

5

TO

DETAIL C

JAALI UPTO +1485MM LVL. FROM FIRST JAALI FLOORUPTO FFL. +1485MM LVL. FROM FIRST PLAN @ +4290MM LVL.FLOOR FFL. COURSE WORK -A

MS LINTEL FRAME ANCHORED TO SLAB.

DETAIL A

MS LINTEL FRAME ANCHORED TO SLAB.

12MM THK PLY SCREWED TO MS LINTEL FRAME.

MS L FLANGE ABOVE JAALI @1485MM LVL. FROM FIRST MS FLOOR FFL. ABOVE L FLANGE JAALI @1485MM LVL. FROM FIRST FLOOR FFL.

PORTAL P6

12MM GYPSUM FALSE CEILING FINISHED WITH AS PER SPECIFICATION. 50X25MM MS HORIZONTAL FRAMEWORK FINISHED WITH C&R RUST PAINT.

REFER DWG. NO. A4.13 FOR JAALI DETAILS

20MM THK STEEL GREY GRANITE JAM.

PLASTERED SLAB BTM. LVL. PLASTERED SLAB BTM. LVL.

REFER DWG. NO. A4.13 FOR JAALI DETAIL

SCALE- 1:25

50X50MM MS VERTICAL FRAMEWORK.

50X50MM MS VERTICAL FRAMEWORK.

LVL.

REF. LINE H

ALIGN REF. LINE TO PLASTERED WALL

FFL 5MM THK MS BASE PLATE ANCHORED TO SLAB. 50X50MM MS HORIZONTAL FRAMEWORK.

RESIDUE BRICK

REFER DWG. NO. A4.15 FOR HANDRAIL DETAIL

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

6MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT. 6MM THK PLY FINISHED WITH LIGHT GREY PAINT.

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

JOINERY.

12MM THK PLY SCREWED TO MS LINTEL FRAME.

JOINERY.

FIRST FLOOR FFL

20MM THK STEEL GREY GRANITE JAM.

DETAIL A

50X25MM MS HORIZONTAL FRAMEWORK

DETAIL C

SD6A. 8MM THK FLOOR TILE.

SCALE- 1:25

SCALE- 1:25

12MM GYPSUM FALSE CEILING FINISHED WITH DARK GREY PAINT.

PLAN @ +2325 MM LVL.

STEEL GREY GRANITE FLOORING.

KEY STONE / START BRICK

8MM THK QUTONE COTTO BRONZE TILE

MS L FLANGE @PLASTERED LINTEL LVL. MS L FLANGE @PLASTERED LINTEL LVL.

MS LINTEL FRAME ANCHORED TO SLAB.

DETAIL A

COURSE WORK -A

PLAN @ +1920 MM LVL. COURSE WORK -B

GD2 MS L FLANGE @PLASTERED LINTEL LVL.

FIRST FLOOR FFL

PLAN @ +2580MM LVL. COURSE WORK -B

FFL

FFL 6MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT.

GD2

PORTAL SCALEP3 1:25 PORTAL P3

SD6A PORTAL P4 SCALE1:25 PORTAL P4

6MM THK PLY FINISHED WITH LIGHT GREY PAINT. 12MM THK PLY SCREWED TO MS LINTEL FRAME.

+450MM LVL. FROM GF FFL. +450MM LVL. FROM GF FFL.

20MM THK STEEL GREY PLANTER P9 GRANITE JAM.

PLANTER P3

12MM THK GYPSUM PLANTER P9 FC. FINISHED WITH C&R RUST PAINT.

GROUND FLOOR FFL PLANTER P3

GROUND FLOOR FFL

LEGEND: KEY STONE / START BRICK

SD5A.

FULL BRICK RESIDUE BRICK

JAALI WALL & PORTAL DETAIL DRAWINGS STEEL GREY GRANITE FLOORING.

SD5A

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

REFER DWG. NO. A4.13 FOR JAALI DETAILS

5MM THK DETAIL C MS

50X25MM MS HORIZONTAL FRAMEWORK

8MM THK PLY FINISHED WITH CORTEN STEEL FINISH PAINT

SEATER TOP @450MM LVL. FROM FFL

PORTAL P7

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

EQL

EQL

EQL

EQL

5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.

ALIGN PLASTERED UPSTAND UPTO FINISHED JAALI LVL.

50X25MM MS HORIZONTAL FRAMEWORK.

1915

50X25MM MS VERTICAL FRAMEWORK FINISHED WITH 230(L) X 110(B) X 75(H) C&R RUST PAINT. BRICK FINISHIED

PORTAL P7

8MM THK QUTONE COTTO BRONZE TILE

50X50MM MS VERTICAL FRAMEWORK

SCALE- 1:25

DETAIL A

12MM THK. V BOARD ON TOP OF 50X25MM MS HORIZONTAL FRAMEWORK.

PORTAL P7

DETAIL A

EQL

200

FINISHED WITH C&R RUST PAINT. 50X25MM1 MS GD1 - TYPE

EQL

PORTAL P3

TILE 50X25MM MS VERTICAL FRAMEWORK FINISHED WITH C&R RUST PAINT.

PORTAL P7

GD1 (TYPE 1)

PORTAL P7 PORTAL P6

D

PLANTER P9

FFL PORTAL P7 - PLAN @ 130MM FFL

GD2

PLAN of portal p7 scale - nts

SCALE- 1:25 STRUCTURAL SLAB.

SECTION -D PLASTER.

SCALE- 1:25

SD6A

FFL

DETAIL D

5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.

12MM THK PLY SCREWED TO FRAMEWORK.

ADHESIVE MS L FLANGE BETWEEN BRICKS @PLASTERED LINTEL LVL.

20MM THK STEEL GREY GRANITE PORTAL CLADDED ON PLY.

5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.

230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT

FALSE CEILING FRAMEWORK AS PER VENDOR SPECIFICATION. GD1(TYPE 2) GRANITE PORTAL 01

PORTAL P4

+450MM LVL. FROM GF FFL.

FFL

FFL

PLANTER P3

SD5A D3

200

FIRST FLOOR FFL

MS LINTEL FRAME ANCHORED TO SLAB.

FFL 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

50X50MM MS TILE VERTICAL FRAMEWORK. 12MM THK. V BOARD ON TOP OF 50X25MM MS HORIZONTAL FRAMEWORK FINISHED WITH C&R RUST PAINT. .

2X

REFER DWG. NO. A4.14 FOR JAALI DETAILS.

ADHESIVE BETWEEN BRICKS

CORTEN STEEL

1915 GD1 (TYPE 2)

X 600

10MM GAP BETWEEN PORTAL AND JAALI. BLOCKWORK UPSTAND.

12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

50X25MM MS HORIZONTAL FRAMEWORK. CORTEN STEEL

FL

EQL

600

2X

EQL EQL

X X

EQL

EQL

5MM THK MS 100x130MM

FINISHED WITH C&R RUST PAINT.

50X25MM MS HORIZONTAL FRAMEWORK

HORIZONTAL SCALE1:25 FRAMEWORK

L-FLANGE MS 50X25MM ANCHORED TO BEAM. VERTICAL FRAMEWORK FINISHED WITH C&R RUST PAINT.

PLAN @ 130MM FROM FFL.

230(L) X 110(B) X 75(H) BRICK FINISHIED WITH LIGHT GREY PAINT

PORTALADHESIVE P7 - PLAN @ 675MM FFL BETWEEN BRICKS

X HANDRAIL 12MM THK. V BOARD TO DETAIL

WITH LIGHT GREY PAINT

12MM THK. V BOARD FINISHED WITH C&R12MM RUST THK. PAINT. V BOARD

PLAN @ 675MM FROM FFL. 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT. GD1(TYPE 1).

PLANTER P3

JAALI UPTO +1485MM LVL. FROM FIRST FLOOR FFL. 5MM THK MS 100x130MM L-FLANGE ANCHORED TO BEAM.

12MM THK. GYPSUM FC FINISHED TO MATCH WITH INTERIOR PAINT FINISH.

50X25MM MS HORIZONTAL FRAMEWORK. 600

EQL

50X25MM MS VERTICAL FRAMEWORK HANDRAIL FINISHED WITH TO C&RDETAIL RUST PAINT.

MS L FLANGE ABOVE 5MM THK JAALI @1485MM LVL. MS 100x130MM FROM FIRST FLOOR FFL. L-FLANGE ANCHORED TO BEAM.

50X25MM MS HORIZONTAL FRAMEWORK FINISHED WITH C&R RUST PAINT. 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

200

PORTAL P6

12MM THK. GYPSUM FC FINISHED TO WITH LIGHT GREY PAINT FINISH. 12MM THK. V BOARD FINISHED WITH C&R RUST PAINT.

L-FLANGE WELDED TO MS LINTEL FRAME

PLASTERED SLAB BTM. LVL.

DETAIL B

700

MS LINTEL FRAME ANCHORED TO SLAB

SCALE- 1:25

MS LINTEL FRAME ANCHORED TO SLAB.

12MM GYPSUM FALSE CEILING FINISHED WITH INTERIOR FINISH PAINT

450

FL

SECTION SECTION - of E portal p7 scale - nts

SCALE- 1:25

GROUND FLOOR FFL

FFL


02.

embrace rural resilience south kainakary, alapuzha, kerala, india.

10th semester.


POLDER SYSYTEM

FISHING | BOATING

2020 FLOOD - SOUTH KAINAKRY

“KUTTANADU - RICE BOWL OF KERALA “ in Alappuzha district is known for its picturesque expanse of paddy cultivation which forms the main source of the famous ‘boiled rice’ of the state. As a tourist destination, it holds great geographical peculiarities. It is a vast area of partly reclaimed land, covered with the bright green paddy fields, separated by dykes. The unique feature about paddy cultivation in Kuttanad is that the level of water is a few feet higher than the level of the surrounding land. It’s the area with the lowest altitude in India, and one of the few places in the world where farming is carried out below sea level. The place is an amazing labyrinth of shimmering waterways composed of lakes, canals, rivers and rivulets. Lined with dense tropical greenery, it offers a glimpse into the rural life-styles of Kerala. Agriculture and seasonal fishing is the main occupation of the natives of Kuttanadu. After monsoon, cultivation is taken up on lands bounded by waterways by erecting bunds along the flow of water. When water flow increases, the bunds are breached causing floods in the paddy fields. This region has been under intense and increasing anthropogenic pressure over the years, which has adversely affected its ecology as well as the livelihood of the people. The high level of pollution with organic, inorganic and toxic material locally generated and brought in by the rivers, aggressive spread of water hyacinth, poor drainage due to choked water ways, increasing intensity of flooding resulting in loss of flora and aquatic fauna.

INDIA | KERALA

KERALA | ALLAPUZHA

ALLAPUZHA | KUTTANADU

KUTTANADU | SOUTH KAINAKARAY


2009

2018


MORPHOLOGY // SETTLEMENT PATTERN

1700 - Lake & Deltatic Plains

1814 - 1912 - First Stage of Land Reclamation

Rich Organic deposition mixed with water. The highlands are dense with green and lower marshy wetlands. Terraced farming was practised on the upper regions.

Parayas reclaimed the land (Kayals) and did below sea level farming. Followed later by Nairs and Syrian Christians. Due to Apprehension of the Presidency of Madras that land reclamation may affect the Port of Cochin, Land Reclamation was stopped.

1912 - 1945 - Second Stage of Land Reclamation

1949 - Last Stage of Land Reclamation

The Kings of Travancore encouraged Kayal Reclamation after withdrawal of the act by Madras province. In 1943 slavery was demolished and the labours demanded wages for the works done, hence the reclamation of kayals reduced as the owners did not want to pay wages.

Reclaimed kayals were initially huge parcels of land difficult to maintain, It was broken into smaller parcel of lands for easy maintenance and effective polder system of agriculture and bi seasonal fishing activity.


1990- Scattered Settlements Scattered settlements within the paddy feilds, an random settlement based on land accessiblity.

CURRENT- Settlemnet along the water channels Scattered settlements within the paddy feilds, an linear settlement along the roads and water ways.


BELOW SEA-LEVEL FARMING // POLDER SYSTEM CONSTRUCTION PROCESS Kuttanad Below Sea-level Farming System (KBSFS) is an unique farming system in India

that practices rice cultivation below sea level. The major land use structure of KBSFS is flat stretches of

rice fields in about 50,000 ha, of mostly reclaimed kayal delta swamps. They exist in three landscape

elements: Karapadam (upland rice fields), Kayal (wetland rice fields) and Kari (land buried with black coal like materials). The rice fields are popularly known as “Puncha Vayals”.

Traditionally KBSFS favoured only one crop of paddy followed with inland and estuarine fish

wealth, notably the endemic prawn species, pearl spot and clams. Farmers of Kuttanad developed

and mastered the spectacular technique of below sea level cultivation, which has several similarities with the Dutch polder system, over 150 year ago. They made this system unique as it contributes remarkably well to the conservation of biodiversity and ecosystem services including several livelihood services.

The recognition of KBSFS as a Globally Important Agricultural Heritage System will instill

pride and will lead to the conservation of this unique below sea level rice-fish farming system.

1. MARKING OF BOUNDARY

2. HAMMRING COCONUT POLES

3. FENCING

4. DEWATERING


INTEGRATED OCCUPATION // ACTIVITY //HABITAT ANALYSIS // 24*7 1. Domestic Spaces_1BHK+Dock+2Wheeler Parking. 2.Domestic Spaces_2BHK+Dock+2Wheeler Parking. 3.Domestic Farming_Dairy Farm. 4.Domestic Farming_Chicken/ Ducks Area. 5.Grainary Storage. 6.Common Toilets. FARMING 1. Domestic Spaces_1BHK+Dock+2Wheeler Parking. 2. Domestic Spaces_1BHK+Dock+Shop. 3.Domestic Spaces_2BHK+Dock+2Wheeler Parking. 4.Fish Market. 5. Boat Manufacture/ Workshop. 6. Dry Fishing Yard. 7.Net storing space. FISHING 8.Common Toilets.

1.House Boats. 2.Wetland restoration parks. 3.View Points/ Decks. 4.Broadwalks/ Promenade. 5.Jetty. 6.House boat terminal. 7.Tourist Center. 8.Craft / Souvenir Shops. HOUSE BOATS-TOURISM

1.Primary School/ Angamvadi. 2.Primary health care center. 3.Community Gathering. 4.Co-Operative Society. 5.Public toilet. 6.OAT. 7.Panjayat Office. 8.Religious: Church/ Temple. BOATS FOR TOURISTS

9.Recreational Space. 10.Market Square. 11.Petti Shops. 12.Community Gathering Hall. 13.Parking Area For tourist around jetty. 14.Bio- Sewage waste management. 15.Water cleaning/ water management. DOMESTIC WORKER - HOTEL


5% 21% 46%

28% 18%


SITE // MACRO ANALYSIS South Kainakary - Rice Bowl of Kerala has a rich agricultural heritage with exclusive infrastructure wide waterways and roadways. The landuse is primarly agriculture with agri mix residential used development. The Pamba river with its tributries acts as a main source of transportation. The Meenapali kayal acts as the main soure of fishing area. There is no health care center or school within 1km radius from the Kollathu Jetty Point. There is a distinct architectural style that climatic conditions and economic condition of the people.

LIGHT HOUSE ALAPPUZHA

WATER WAY KAINAKARY

TOWARDS ALAPPUZHA

VERNACULAR HOUSE AT ALAPPUZHA

TOWARDS ALAPPUZHA-CHENGANASHERY ROAD ATDC BOAT JETTY ALAPPUZHA


TOWARDS NORTH KAINAKARY

TOWARDS KOTTAYAM

BRIDGES CHILD CARE/ ANGAMVADI SCHOOLS MAVELI STORE RATION SHOP HEALTH CARE

M

M 900

8 00 M

7 00 M

5 00

M 600

KOLLATHU JETTY

0 100

MEENAPALLY KAYAL

M

SITE

WATER BODIES AGRI BELT MIXED USE ROADWAY TOWARDS ALAPPUZHA

TOWARDS CHENGANASHERY

WATERWAY


PROPOSED SITE PLAN|

land parcel-15 residential land p ar reside cel-14 ntial

lan re

vembanad kayal

land

parc el-2 reside ntial

kollathu jetty

land p arcel -1 reside ntial

land par reside cel-4 ntial

tempo

land par reside cel-3 ntial

land parce residentia

rary m

land p ar reside cel-5 ntial

arket

+ publ

ic par

k

temporar ym


land par cel residentia -13 l

nd parcel -1 esidential 2

land parcel -1 primary sch 1 ool

land parcel play ground-10

land parcel-8 water tank solar power

pamba river

el-6 al

market +

land parcel-9 primary school

land parcel-7 community center govt. office water tank

public pa

rk


SITE STUDY MODEL Re-Thinking the urban planning of south Kainakary by analysing and implementing the theory Elements of the city by Kevin Lynch. Taking its principles path, edge, district, node and Landmark, Site parcelling is done by establishing road networks as path and the parcels between paths as districts, CRZ setback becomes edge of the city, creating prominent landmarks and nodes by identifying existi

Nodes through Pamba River


Post Site Parcelling

Before Flood

During Flood


view of agri - 2bhk units



view of agri - 2bhk // plan 10.00

DOMESTIC FARM +0mm lvl.

3.65

3.65

A

SIT OUT +1.2m lvl.

2.00

5.00

SIT OUT +1.2m lvl.

3.00

CHILDREN'S BEDROOM BEDROOM

KITCHEN

3.00

UTILITY | LAUNDRY

LIVING

up TOILET

5.00

FOYER +1.2m lvl.

TWO WHEELER PARKING

2.00

up

2.00

3.00

3.00 10.00

plan @1.5m lvl.

2.00


view of agri - 2bhk // plan//construction details

.65

TYPE - 01 - BAMBOO MATS

A

FLOORING DETAILS

3.65

TYPE - 01 - BAMBOO MATS

A

FLOORING DETAILS

.00

SIT OUT +1.2m lvl.

TYPE - 01 - BAMBOO HA

2.00

SERVICE LOFT SOLAR PANEL BATTERY BACK UP

MULTI WORK SPACE

SERVICE LOFT SOLAR PANEL BATTERY BACK UP

3.00

ROOF SKYLIGHTMULTI WORK SPACE

WALL DETAILS

ROOF SKYLIGHT

SERVICE LOFT

WALL DETAILS

GRAIN STORAGE

SERVICE LOFT

GRAIN STORAGE

dn

dn

OPENING DETAILS

OPENING DETAILS

5.00 B

B DECK

DECK

2.00

3.00

3.00

plan @5m lvl.

3.00

3.00

TYPE - 01 - BAMBOO HALF MATS


PRODUCED PRODUCED BY AN AUTODESK BY AN AUTODESK STUDENT STUDE VE

agri - 2bhk //- sections AGRICULTURE AGRICULTURE 2BHK - 2BHK MODULE MODULE

PRODUCED BY AN AUTODESK STUDE PRODUCED BY AN AUTODESK STUDENT VE

Solar Photovoltaic Solar Photovoltaic cells for power cells for po distribution to distribution the houseto the house

AGRICULTURE - 2BHK MODULE AGRICULTURE - 2BHK MODULE 0.75

0.75

Bamboo and Bamboo thatch and sloped thatch roofsloped ro Sky Light 2.10

2.10

0.75

0.75

Sky Light

Solar Photovoltaic cells for po Solar Photovoltaic cells for power distribution distribution to the houseto the house

Loft for SolarLoft Battery for Solar storage Battery & storage & Grains storage Grains storage Bamboo and thatch Bamboo and thatch sloped roofsloped ro Sky Light 7.57

7.57 2.10

3.10

7.57

2.10

7.20

7.20

7.57

7.20

3.10

1.25

1.25

Bamboo walls Bamboo as perwalls detail asAper detail A

Rain Water Collection Water Collection Loft for Solar Battery Loft for SolarRain Battery storage & storage & Barrel Domestic Barrel -storage Domestic use Grainsuse Grains-storage Bamboo tieBamboo ropes tie ropes Bamboo Mat Bamboo FlooringMat withFlooring tie ropes with tie r to pull up and to pull tie to upthe andwalls tie to the walls

3.10

3.10

Sky Light

7.20

section - aa

SECTION SECTION - AA - AA

Open floor Open opening floor to opening change the to chang plastic drums. plastic drums. Bamboo walls asAper detail A Bamboo walls as per detail Steel framesSteel supporting frames the supporting floor & the flo Water Collection Rain Water Rain Collection the pontoons the pontoons Barrel use - Domestic use Barrel - Domestic Plastic drumsPlastic 500mm drums x 900mm 500mmstacked x 900mm Bamboo tieBamboo ropes tie ropes to create floating to create pontoons. floating pontoons. Bamboo with tie r Bamboo Mat FlooringMat withFlooring tie ropes to pull upthe and tietowith tothe thebase walls w to pullPillars up and tieto to the walls Steel Steel fixed Pillars fixed base foundation foundation bolts and bolts andthe floor opening toplates chang Open floor Open opening toplates change plastic drums. plastic drums. frames the supporting Steel framesSteel supporting floor & the flo the pontoons the pontoons drums 500mmstacked x 900mm Plastic drumsPlastic 500mm x 900mm to create floating pontoons. to create floating pontoons.

1.25

0.75

1.25

Pillars the base w Steel Pillars Steel fixed to the fixed basetowith bolts and plates foundation foundation bolts and plates Solar Photovoltaic Solar Photovoltaic cells for power cells for po distribution to distribution the houseto the house

0.75

SECTION SECTION - AA - AA

Bamboo and Bamboo thatch and sloped thatch roofsloped ro Sky Light 2.10

2.10

0.75

0.75

Solar Photovoltaic cells for po Solar Photovoltaic cells for power distribution tostorage the house distribution to the house Ran water collection Ran water tocollection in to storag drum transferdrum to kitchen transferand to kitchen toilet and to Flushing wash Flushing basin &and washthatch basin Bamboo Bamboo&and thatch sloped roofsloped ro Sky Light

7.57

7.57 2.10

3.10

7.57

2.10

7.20

Ran watertocollection to storag Ran water collection storage in Rain Collection Water drum transferCollection to kitchen drum Water transferRain to kitchen and toilet and to Barrel Domestic Barrel use Domestic use Flushing & wash basin Flushing & wash basin Bamboo tieBamboo ropes tie ropes

7.57

7.20

3.10

1.25

1.25

Sky Light

7.20

3.10

3.10

Sky Light

7.20

Open floor Open opening floor to opening change the to chang plastic drums. plastic drums. Water Collection Rain Water Rain Collection Barrel use - Domestic use Barrel - Domestic Plastic drumsPlastic 500mm drums x 900mm 500mmstacked x 900mm Bamboo tieBamboo ropes tie ropes to create floating to create pontoons. floating pontoons.

Steel Pillars Steel fixed to Pillars the fixed basetowith the base w foundation foundation bolts and bolts andthe floor opening toplates chang Open floor Open opening toplates change plastic drums. plastic drums.

SECTION - BB - BB SECTION 1.25

Wastetowaste Waste to waste to Soil waste to Soil waste Recycle Recyclefarm |Domestic use farm use Septic TankSeptic Tank |Domestic

drums 500mmstacked x 900mm Plastic drumsPlastic 500mm x 900mm to create floating pontoons. to create floating pontoons.

1.25

Pillars the base w Steel Pillars Steel fixed to the fixed basetowith bolts and plates foundation foundation bolts and plates

CED AN AUTODESK BY AN AUTODESK STUDENT STUDENT VERSION VERSION

section - bb

SECTION SECTION - BB - BB

Waste Wastetowaste to waste to Soil waste Soil waste to Recyclefarm |Domestic Recycle use farm use Tank |Domestic Septic TankSeptic


ERSION

agri - 2bhk // views

ERSION

FRONT ELEVATION - STATIC POSITION

FRONT ELEVATION - FLOOD POSITION

PROD

FRONT ELEVATION - FLOOD POSITION

PRODUCED BY AN PRODUCED AUTODESK BYSTUDENT AN AUTODESK VERSION STUDENT VERSION

FRONT ELEVATION - STATIC POSITION


plan of fishing // 1bhk units

FISHING - 1BHK MODULE

A

5.00

0.70

STANDING DECK

5.00

TOILET 1.60

3.00

1.23

0.70

3.00

3.00

3.00

STANDING DECK

3.15

B

SHOWER BEDROOM

1.23

1.35

BEDROOM

up

1.80

3.70

KITCHEN STORE

2.51

COMMUNITY GATHERING & DRY FISH YARD

1.80

KITCHEN STORE

3.70

3.70

10.00

SECTIO skylight above

+1.2m Lvl.

10.00

LIVING ROOM STANDING DECK

LIVING ROOM

3.00

0.70

3.00 3.00

3.00

up +0.0m Lvl.

PLAN @ 1.5m Lvl.

plan SCAE: 1:50

STANDING DECK

3.15

0.70

7.40


sections of fishing // 1bhk units

Solar Photovoltaic for powe Solar Photovoltaic cells forcells power distribution to the to house distribution the house 1.50

2.55

Bamboo and thatch slopedsloped roof roof Bamboo and thatch Sky Light Sky Light

Ran water to storage in Ran collection water collection to storage i drum transfer to kitchen and toilet drum transfer to kitchen and toilet FlushingFlushing & wash&basin wash basin

B

Cold Storage for fish for fish Cold Storage

Bamboo windows Bamboo windows 2.95

floor opening to change Open Open floor opening to change the t plasticplastic drums. drums.

Plastic Plastic drums 500mm x 900mm stacked drums 500mm x 900mm sta to create floatingfloating pontoons. to create pontoons.

Steel Pillars the to base Steel fixed Pillarstofixed thewith base with foundation bolts and foundation boltsplates and plates

ECTION TION -A-A

section - a

WasteWaste waste to waste toSoil waste Soil to waste to Recycle |Domestic farm use Recycle |Domestic farm use SepticSeptic Tank Tank

1.21

Solar Photovoltaic cells forcells power Solar Photovoltaic for powe distribution to the to house distribution the house 1.36

1.36

Bamboo and thatch slopedsloped roof roof Bamboo and thatch 0.28

Sky Light Sky Light 2.81

1.20 3.61

2.35

Solar storagestorage & forBattery Solar Battery & 2.35 Loft forLoft Net & Net Cold&Storage Cold Storage

0.45

.40 7.40

Bamboo walls aswalls per as detail Bamboo per detail

2.71

Rain Water Collection Rain Water Collection Barrel -Barrel Domestic use use - Domestic

2.95 2.40

2.40

Open Open floor opening to change the t floor opening to change plasticplastic drums. drums. Steel frames supporting the floor Steel frames supporting the&floor the pontoons the pontoons

1.20

1.20

Plastic Plastic drums 500mm x 900mm stacked drums 500mm x 900mm sta to create floatingfloating pontoons. to create pontoons.

Steel Pillars the to base Steel fixed Pillarstofixed thewith base with foundation bolts and foundation boltsplates and plates

ON - B - B ECTION

section - b


before flooding


during flood


primary community school // plan



PRIMARY COMMUNITY SCHOOL//elevation

PRIMARY COMMUNITY SCHOOL//SECTIONAL PERSPECTIVE



primary community school // view



view of kollathu jetty during nehru boat race



03.

viridescent quietude ayanavaram, chennai, india

9th semester.


aim

concrete jungle

pedestrain freindly community spaces

viridescent quietude

Cities are growing at a substantial rate and increasing population affects built areas while causing further urban sprawl. There is a need to understand and focus on the effects of this phenomenon on our cities keeping in view its liveability, cultural identity and vitality. We need to acknowledge the fact that cities cannot and should not extend their limits endlessly. Most of our cities lack efficient streets, good public places and any distinct character in the built form. This is partly attributable to rapid urbanization and to the lack of a distinct focus on the problems concerning the liveability of a city. The premise is that all the cities must provide and support good public life by constantly improving and upgrading the city infrastructure along with maintaining its identity. Community or neighbourhood attachment can be defined as cultural identity, loyalty, optimism, pride, and passion that people feel about the place where they live. What makes people want to invest their future in a place? Is it a welcoming and friendly community? Are there available social offerings such as entertainment, recreation, places to sit and eat parks and green spaces? Or is it a physically attractive space with greenery? Yes is the answer to the entire above question. Ayanpuram, or Ayanavaram, is one of the prominent localities of Chennai and is located in Central Chennai at about 8 km from the city's centre. Ayanavaram is one of the peripheral commercial belts of Chennai. Ayanpuram is the original name, derived from an old historic story mentioning "a battle between Lord Brahma and Lord Muruga, where Lord Muruga admonished Brahma and took over the process of creation on earth, later Lord Brahma prayed to Lord Shiva and got his action of creativity of life back. It is believed that Lord Brahma worshipped Lord Shiva here. It is in recognition of that event Ayanpuram is named. It was also called Brahmapuri. A place with such a rich historic background and prominent position has lost its identity in the fast pace growth over time. The core intent of this design proposal is to study the present scenario of Ayanavaram and understand its growth, needs and to create a healthy green cultural community identity to this locality. This project looks at possibilities of renewal and redevelopment within the functioning city without losing the core identity and functionalism of the neighbourhood. "VIRIDESCENT QUIETUDE"- a green relaxing space offering all the needs of the immediate neighbourhood.


place making // objectves



URBAN ANALYSIS

URBAN FORM DETERMINANTS ,COMAPCT AND LINEAR SETTLEMENT

DESIGN DEVELOPMENT

URBAN LANDSCAPE


COMMERCIAL INFRASTRUCTURE

ISSUES & SITE IDENTIFIED


view of plaza



view of plaza



GROUND floor plan and section aa’



first floor plan and sectionbb’



sectional perspective cc’

sectional perspective dd’



1. view from entry plaza

2. view from mid-level plaza 4

3 1

5 6

AERIAL VIEW OF VIRIDESCENT QUIETUDE

6. AERIAL VIEW OF MID LEVEL PLAZA AND MEDITATION DECK

7. VIEW OF O.A.T


3. INTERIOR COURT VIEW OF FOOD COURT 2

4. view from pedestrain pathway

7

8

5. view OF PLAY AREA

8. VIEW OF LANDSCAPED SEATER AREA


04.

urban plaza tiruppur, tamilnadu, india.

internship - webe design lab


DESIGN PARAMETERS OPENESS

FLEXIBILITY

CATALYST

material pallete

CARDBOARD

REINFORCED THERMOCOL WALLS

Experiential Factor

Concept of a Park

POLYCARBONATE

TENSILE FABRIC

ROOF COVERINGS

METAL FRAMES & POSTS

[JOY,FRESH & COLORFUL]

Street side cafes


B

SITE LAYOUT GENERATOR ROOM

ELECTRICAL ROOM

TWO WHEELER PARKING NO - 15

TWO WHEELER PARKING NO - 26

TWO WHEELER VEHICULAR ENTRY + 0.0m Lvl.

PEDESTRIAN ENTRY + 0.0m Lvl.

1

2

3

4

5

6

8

9

FOOD KIOSK

FOOD KIOSK

FOOD KIOSK

FOOD KIOSK

FOOD KIOSK

FOOD KIOSK

FOOD KIOSK

7

FOOD KIOSK

FOOD KIOSK

F

155 SQ.FT

155 SQ.FT

155 SQ.FT

155 SQ.FT

155 SQ.FT

155 SQ.FT

155 SQ.FT

155 SQ.FT

155 SQ.FT

1

RAMP

1

2

FOOD FOOD KIOSK KIOSK 105 SQ.FT 105 SQ.FT

A

FOUR WHEELER PARKING NO - 11

3

4

FOOD KIOSK FOOD KIOSK

105 SQ.FT

105 SQ.FT

RAMP OFFICE ROOM 150 SQ.FT

ROA

TH D WID

et)

.54 fe

m (28

OF 8.7


GENERAL NOTES * DRAWINGS NOT TO BE SCALED. * ALL MEASUREMENT ARE IN MM UNLESS OTHERWISE SPECIFIED. * DRAWINGS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTURAL DRAWINGS. * THIS DRAWING IS COPYRIGHT PROTECTED. IT IS THE PROPERTY OF WEBE DESIGN LAB. * IT IS NOT TO BE REPRODUCED, COPIED,HANDED OVER TO A THIRD PARTY OR USED FOR ANY PURPOSE OTHER THAN FOR WHICH IT AS BEEN LOANED.

REVISIONS S.NO DATE

REVISION DETAIL

COMMENTS 10

11

12

FOOD KIOSK

FOOD KIOSK

FOOD KIOSK

155 SQ.FT

155 SQ.FT

155 SQ.FT

KEY PLAN FOOD

105 S

1 KIOSK

Q.FT

FOOD

105 S

2 KIOSK

Q.FT

FOOD

3

KIO 105 SQ SK .FT FOOD

105 S

SEAL

4 KIOSK

Q.FT

FOO

5

D KIO 105 SQ SK .FT

FOUR WHEELER PARKING NO - 13

6

FOOD

105 S

KIOSK

Q.FT

7

FOOD

105 S

KIOSK

Q.FT

FOOD

8

KIO 105 SQ SK .FT

ARCHITECTS

MEN'S TOILET ACCESSIBLE TOILET

WOMEN'S TOILET

FOUR WHEELER VEHICULAR ENTRY + 0.0m Lvl.

WEBE DESIGN LAB

PROJECT

URBAN PLAZA DRAWING TITLE

SITE LAYOUT

DRAWING NUMBER

WB145/XX/XXXX

DRAWN BY

ZAYAN

SCALE

CHECKED BY

PREETHI

1:250/A3

N

APPROVED BY

YOGESH

ISSUE DATE

03-03-2020

STATUS

FOR DISCUSSION

d

e

s

i

g

n

l

a

b

8/3B, 5th STREET, NANDANAM EXTENSION, CHENNAI - 600 035 architects@webedesignlab.com www.webedesignlab.com / PH : 044-24341833


VIEW OF ENTRANCE



VIEW OF DIFFERENT SPACES



05.

ENVISAGING THE ETHREAL FICTIOANAL SITE

4th semester.


THE BLUE WAS VEILED BY THE HAZE OF GOLDEN YELLOW AIM This design aims aat exploring and expressing the memory lane through a series of experiences. It conceptualises a form of architecture uncommitted to a visible, tangible materiality and explores an evolving impermanent and invisible architecture drawn wholly from the body moving air - filled space. A form is given to the intangible character treating him as a living being expressing the intangible emotions experienced in the space.

“Drawing is not an exercise of particular dexterity but above all means of expressing intimate feelings and moods”. Henri Matisse

BUIO ALBAA WEATHER & LIGHT


It all began with roaring voice of my grandfather calling ‘mone elunelkku tahajuddin samayam ayi!” I wokeup rubbing the sleep from my eyes, crying to wake up at three in the morning at the age of seven. To pacify me, he promised he promised that he would take me out if i woke up and do my prayers. On his promise, I woke up, took bath, prayed and waited as eager as beaver for him. Holding his hands i started my life’s most memorable journey. As we stepped out from our house a misty blanket of heavy black clouds rolled over us i kept on asking him “ enne evidekanu kondu pokunne uppapa ?”. He smiled holding me and pointed the silent mountains as transient as clouds - “The Palakaya Thattu, Kannur”. Listening to the silence of nature and the whispering winds, we started to walk through the cold streets, dimly lit only by the fire flashing across the sky. Our first stop in this journey was the thattu kada, small thatch roof huts along the river bed, with benches. The shopsinvited us with the melody of old Malayalam and Hindi old songs that a brought a smile as big as moon on my uppapa’s face, that steaming the hot glass of lemon tea and undaputtuin that chill weather was like eating sunshine. Uppapa used to tell me stories about our hometown and I loved listening to it, there used to a be small group of people sitting and sharing their lives to each other and enjoying the quiet whispering winds. Uppapa borrowed cycle from his friend’s shop and we started our next part of the journey, The mountain seems no more a souless thing, but rather as a shape of ancient fear in darkness and the winds of chaos born, amid the lord less heavens thundering - a presence


Medium : WaterColour

crouched, enormous and austere before whose feet the mighty waters mourn. I sat in front holding the handle bar of the cycle with my tiny hands listening silent rhythm of nature wondering if the magical moment was a dream or reality. The misty paths unvieled the unknown at every twist and turns. Listening to the stories that uppapa was telling about the small villages, i was eagerly watching at the small sparkes if flames that peaked out from the dark mountains. Suddenly there was a sheet of rain slicing the soggy ar into bits, We took shelter at the small cluster of huts that sparked fire from the common fire that was litin the centre. Sitting in thier Verandha we looked down at the path what we drove. The heat that came from the small camp fire was like drinking a hut cup of tea in freeze time. The warmth that created wa not only physically but internally from deep withing. The rain reduced to a drizzle on the high ridges and mist everywhere. We continued to bike uphill to the top. We reached the top when the greyish blue sky was veiled with the haze of golden yellow.




PLAN & SECTIONS



06.

OTHER WORKS renders, posters, illustrations


View Of Reception

View Of Conference Room


View Of Reception

View Of Conference Room


View Of Reception

View Of Conference Room



Maquette Render Of Dodla School




ACTIVITY MAPPING // BEFORE PANDEMIC

ACTIVITY MAPPING // AFTER PANDEMIC



THANK YOU !

Contact:

work.zayanmohammed@gmail.com

Zayan.Work


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.