EMP - Bimini Bay Ferry Terminal (Revised)

Page 62

Environmental Management Plan Bimini Bay Ferry Terminal Project October 2013

8.5.3

Monitoring & Reporting Schedule

Beach profile surveys will be conducted once every 6 months for two years and annually for a minimum of 5 years total following the completion of the baseline survey. Changes, if any, to the beach will be tracked by comparing the beach profiles and evaluating volumetric changes. Semiannual monitoring reports discussing the results of the surveys will be prepared and submitted to the BEST Commission Compliance Officer via e-mail or the information shall be made available via web site. Initiation and completion of each survey shall also be reported to the BEST Commission Compliance Officer. If mitigation is required, the mitigation strategies will be discussed with BEST Commission staff prior to implementation. 8.6

MARINE WATER QUALITY MONITORING 8.6.1

Locations for Water Quality Monitoring

Water sampling will be conducted within the project footprint at the two locations depicted by red flags in the figure below:

Figure 17: Water Sampling Map

62


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.