

02.2020. - PRESENT Architect
Specter DeSouza Architects PC, New York
01.2015 – 02.2020.
Co-Founder / Project Manager
Dreamers Architects, Belgrade, Serbia
https://www.instagram.com/dreamers_architects/
03.2017 – 11.2019.
Licensed Architect
Zlatibor Gradnja, Belgrade
12.2012 – 02.2013.
Project Supervisor Adriatic Properties, Budva, Montenegro
05.2011– 07.2012
Licensed Architect
Architectural Creative Center, Belgrade
05.2006 – 05.2011.
Licensed Architect
Elba Mari Bautraeger, Belgrade, Serbia
2008
LICENCED ARCHITECT
Serbian Chamber of Engineers
2012
LICENCED CONTRACTOR - ENGINEER
Serbian Chamber of Engineers
2015
LICENCED ENERGY EFFICIENCY DESIGNER
Serbian Chamber of Engineers
1998-2005
MASTER OF ARCHITECTURE
University of Belgrade, Faculty of Architecture, Serbia
1ST prize
RESIDENTIAL/ OFFICE BUILDING, DIMITRIJA TUCOVICA STREET, BELGRADE, 2009
Part of independent design team to win architectural competition for 12000 sqm Mix-use building
1st prize
URBAN VILLA, STROSSMAYER STREET, MARIBOR, SLOVENIA , 2009
Part of design team at Elba Mari Bautraeger to win architectural competition for 800 sqm high-end residential house
Closest selection
COMMERCIAL CENTAR, KING MILAN STREET, BELGRADE, SERBIA, 2006
Part of independent design team to enter architectural competition for 22000 sqm commercial center at Belgrade
COMMERCIAL BUILDING LOBBY , CONSTRUCTION IN PROGRESS
Lobby features a warm, finely crafted wood wall treatment, polished marble and stone wall finishes and softly lit plaster coved ceilings. The combination of finishes composes a textural experience on multiple scales through contrasting materials, colors and tones as one proceeds from the entrance to the elevators. The lobby welcomes occupants and visitors with a new curved white marble reception Desk, new steel and fitted glass canopy, and an updated entrance that visually opens the space to the street.
This project included all phases from initial test fits to the final construction administration phase. During DD and CD development wide range of services were included: coordination with tenant and building owner to determine the optimal layout and create attractive and functional space that meets unique needs and requirements. Worked closely with engineers and other professionals, design is executed flawlessly, meeting all safety and regulatory standards. The collaboration enabled a smooth construction process and successful implementation of the project. In the final CA phase, monitored the project closely, conducting regular site visits and meetings with the owner and GC to ensure compliance with the design intent and promptly resolving any issues that had risen.
This project included all phases from initial test fits to the final construction administration phase. During DD and CD development wide range of services were included: coordination with tenant and building owner to determine the optimal layout and create attractive and functional space that meets unique needs and requirements. Worked closely with engineers and other professionals, design is executed flawlessly, meeting all safety and regulatory standards. The collaboration enabled a smooth construction process and successful implementation of the project. In the final CA phase, monitored the project closely, conducting regular site visits and meetings with the owner and GC to ensure compliance with the design intent and promptly resolving any issues that had risen.
8 WEST 40TH STREET, NYC
ALTERATIONS TO 7th FLOOR – OFFICE FURNITURE SHOWROOM – CONSTRUCTION IN PROGRESS
The project scope was to closely collaborate with the Tenant’s architect and building owner to create the CD set that includes and coordinates all their requirements and needs. According to the lease agreement, our task was to design the space according to building standards in one part of the space. In the rest of the space, we had to implement the conceptual design received from the tenant’s architect. But in the end, the whole space needed to look and represent a unique whole both aesthetically and functionally. This project included all phases from DD and CD development to the final construction administration phase. Worked closely with engineers and other professionals, design is executed flawlessly, meeting all safety and regulatory standards. The collaboration enabled a smooth construction process and successful implementation of the project. In the final CA phase, monitored the project closely, conducting regular site visits and meetings with the owner and GC to ensure compliance with the design intent and promptly resolving any issues that had risen.
8 WEST 40TH STREET, NYC
ALTERATIONS TO 11th FLOOR –OFFICE PRE-BUILT SPACE
After initial test-fit and marketing plans created for advertisement purposes, building owner asked us to create CD for 11th floor as pre-built space. The goal was to create office space which is completely finished and equipped, ready for any tenant to move in, w/o any significant updates. This project included all phases from DD and CD development to the final construction administration phase. Worked closely with engineers and other professionals, design is executed flawlessly, meeting all safety and regulatory standards. The collaboration enabled a smooth construction process and successful implementation of the project. In the final CA phase, monitored the project closely, conducting regular site visits and meetings with the owner and GC to ensure compliance with the design intent and promptly resolving any issues that had risen.
845 THIRD AVENUE, NYC
Due to changing demand in the market, the client wanted requested to divide the existing retail space into multiple smaller shops with separate street entrances. The idea was to preserve the existing façade frame and incorporate a new glass storefront within. The potential new use of the premises required the installation of an air conditioning system. Therefore, it was necessary to incorporate metal horizontal louvers above the glazing.
Several different options for dividing the space were presented to the client during the project development. In close collaboration with the client, potential tenants, and the engineers the final option was selected, which best meets all the requirements of the client, the market, and potential tenants. In the final CA phase, regular site visits and meetings were conducted with the owner and GC to ensure compliance with the design intent and promptly resolve any issues that had risen.
ARHITECTURE COMPETITION 2009, 1st prize
Part of design team at Elba Mari Bautraeger
RESIDENTAL/COMERCIAL BUILDING 12000 sqm
Exploring relationship between closed facade overlooking busy city street and open courtyard
ARHITECTURE COMPETITION 2006, closest selection
Part of design team at Elba Mari Bautraeger
OFFICE CENTER 22000 sqm
Located in city center, on major crossroads. Composition of volumes emphasizes directions of the streets, relation between transparent and opaque, horizontal and vertical.
ARHITECTURE COMPETITION, 1ST PRIZE, FULL PROJECT DEVELOPMENT, COMPLETED 2009.
Part of design team, construction administration and supervision at Elba Mari Bautraeger
PRIVATE HOUSING 800 sqm
Composition of volumes which permeate each other, creating contemporary urban villa.
SKERLICEVA STREET, BELGRADE, SERBIA
FROM PRELIMINARY DESIGNT TO PROJECT CONTRACT DOCUMENTATION 2015.
Project Architect at Architectural Creative Center
RESIDENTAL/COMERCIAL BUILDING 1400 sqm
Specific project assignment. Luxury housing units on upper floors with outlets on the ground floors.
Because of the importance of location (immidiete proximity one of the city landmarks), design had to be approved by the City expert commission.
FROM PRELIMINARY DESIGN TO PROJECT CONTRACT DOCUMENTATION, COMPLETED 2016
Project Architect at Architectural Creative Center
RESIDENTIAL/COMERCIAL BUILDING 2300 sqm
It was a particular challenge to meet investor’s demand for a large number of small housing units. A hotel-like exterior and three underground floors (parking space required by code) were a way to solve the problem.
FROM PRELIMINARY DESIGN TO PROJECT CONTRACT DOCUMENTATION, COMPLETED 2019
Project Architect at Dreamers Architects
RESIDENTIAL/COMERCIAL BUILDING 2050 sqm
CONTRACT ADMINISTRATION TEAM AND SUPERVISING CONSTRUCTION WORKS, 2013
Leading the Architectural and MEP inspection teams
OFFICE INTERIOR DESIGN, BELGRADE
DESIGN CONCEPT, PROJECT DOCUMENTATION, MATERIAL SELECTION, CONSTRUCTION SUPERVISION
Part of Design team at Architectural Creative Center, 2011
APARTMENT INTERIOR DESIGN, BELGRADE
DESIGN CONCEPT, PROJECT DOCUMENTATION, MATERIAL & FURNITURE SELECTION, CONSTRUCTION SUPERVISION
Project architect at Dreamers Architects, 2015
APARTMENT INTERIOR DESIGN, BELGRADE
DESIGN CONCEPT, PROJECT DOCUMENTATION, MATERIAL & FURNITURE SELECTION, CONSTRUCTION SUPERVISION
Project architect at Dreamers Architects, 2016
APARTMENT INTERIOR DESIGN, BELGRADE
DESIGN CONCEPT, PROJECT DOCUMENTATION, MATERIAL & FURNITURE SELECTION, CONSTRUCTION SUPERVISION
Project architect at Dreamers Architects, 2016
APARTMENT INTERIOR DESIGN, BELGRADE
DESIGN CONCEPT, PROJECT DOCUMENTATION, MATERIAL & FURNITURE SELECTION, CONSTRUCTION SUPERVISION
Project architect at Dreamers Architects, 2017
APARTMENT INTERIOR DESIGN, BELGRADE
DESIGN CONCEPT, PROJECT DOCUMENTATION, MATERIAL & FURNITURE SELECTION, CONSTRUCTION SUPERVISION
Project architect Dreamers Architects, 2018