SURGICAL WARD EXPANSION AND REMODEL PROJECT OBRAS SOCIALES DEL SANTO HERMANO PEDRO HOSPITAL
INDEX
Detailed Operating Room Plans Work Zone Architectural Plan Surgical Ward 3D View Convalescent Ward Architectural Proposal Workflow Diagram Convalescent Ward 3D Plan Convalescent Ward View Convalescent and Recovery Patio
PROJECT OVERVIEW Obras Sociales del Santo Hermano Pedro Hospital has decided to expand and remodel the surgical ward and will be adding 3 additional operating rooms and remodeling and improving the current support areas (break room, sterilization, changing rooms, records, storage, etc.) The project also includes investment for full environmental compliance on sewage and hospital waste treatment plant on site, and completion of fiber optics installation to connect medical services throughout the hospital. This expansion has been designed with great respect for the architectural value of the historic building in which the hospital operates. CONTEXT Obras Sociales Hospital currently has 5 operating rooms where more than 6,500 surgeries are performed annually. The surgeries are performed by more than 1,200 volunteer surgeons and support personnel that come from the US, Canada, and Europe. Currently, 40 medical missions from various countries and organizations come throughout the year to donate their services to the poor and to Obras Sociales. The existing operating rooms were inaugurated in 1993 and were expanded and remodeled in 2006 by the generous contributions of many generous people and organizations, led
by Faith In Practice. During these 27 years an estimated 150,000 surgeries have been performed. CURRENT OPPORTUNITY AND DEMAND FOR ADDITIONAL OPERATING ROOMS a) There is a great opportunity to serve more people and demand for surgeries is high, at any given moment there are more than 2,000 people on a waiting list. b) The existing medical team organizations that have come to serve and new groups who want a safe and organized place to donate their time would love to have more space and dates to offer these life changing services, the current space is small, and the calendar is full all year, at present. The mission of Obras Sociales is to respond to all the poor c) who knock on their door seeking help for their healthcare needs. The public health system is not sufficient to meet their needs and they are unable to afford private health and medical services. GOALS FOR THE NEXT 3 YEARS a) Increase the number of people served annually, serving more than 10,000 people a year who are eagerly waiting for these services.
b) Grow the number of annual volunteer medical missions from to 40 to 60.
in place to steward the resources well and meet project deliverables.
c) Increase the number of volunteers serving at Obras from 1,200 to 2,000 a year.
The equipment for the new operating rooms has been donated by Heinemann Robicsek Foundation and Partners For World Health. The medical organizations who perform surgeries year after year have actively participated in equipping the current operating rooms and many have already committed to gifts in kind to further enhance the technical capability of the surgical ward and to update the equipment used in current operating rooms or the sterilization area.
TOTAL COST OF CAPITAL PROJECT AND FINANCING PLAN The planned project requires an investment of $821,000 or Q.6,000.000 (quetzales). This includes the expansion and remodel of the surgical ward, installation of sewage, wastewater and hospital waste treatment plant and full installation of fiber optics throughout the hospital. The goal is to source 60% of the project through local cash and in-kind donations and Guatemalan businesses and partners who are donating a portion or all their services to see this project to fruition on behalf of their community. The remaining 40% will be sourced through funds raised by Obras Sociales, engaging existing and new donors in this visionary project. The project is being supervised by an Oversight committee comprised of board members of Obras and Amigos, as well as staff and other advisors from the community. All expenses and donations for this project are being overseen by the committee and there is a designated account and accountability structure
AUDITORIA
COMPRAS
SECRETARIA
CORREDOR DE EVACUACION
OFICINA DECOMUNICACION
PATIO No.2
CORREDOR
SALIDA
CAJAS DE COBROS
TRABAJO SOCIAL
AMPLIACION DE CORREDOR
CORREDOR
LABORATORIO
LABORATORIO
PATIO MAS JARDIN No.2 OFC. JEFE FARMACIA
INGRESO
CORREDOR DE EVACUACION
IGLESIA
BANCA
BANCA
BANCA
ATRIO DE LA IGLESIA
Private Zone - Aseptic zone Secondary private zone - post Op. and doctors Public Zone Administrative Zone
Architecture plan - work zones
-
-
-
-
Descripción:
REVISIONES
Fecha:
PLANTA DE ARQUITECTURA
Dibujo:
-
Descripción:
REVISIONES
VERSION ORIGINAL
VERSION ORIGINAL
0.0
RECUBRIMIENTO EN PISO
9
R0.06
www.aicsacorp.com
Acabado recubrimiento epoxico Para control a humedad. Lavable.. Aséptico. Ignífugo. Fácil sello entre áreas.
Proveedor: JC Ingenieros o similar. DETALLE A - CURVA SANITARIA EN VÉRTICES / MATERIALES INSTALACIÓN EN MUROS / PISO. INSTALACIÓN EN MUROS / MUROS. INSTALACIÓN EN MUROS / CIELO FALSO.
SIMBOLOGÍA: RECUBRIMIENTOS HOSPITALARIOS: 1. EN PISO Y CURVA SANITARIA :
RECUBRIMIENTO CEMENTICO AUTONIVELANTE DE 9 MM DE ESPESOR CON CAPA INTERMEDIA AUTONIVELANTE EPÓXICO Y ACABADO POLIURETANO TRANSPARENTE. CÓDIGO DE COLOR BLANCO 4320 LA PALETA + COLOR JUMPER HEDGE AP119-5 LA PALETA ACABADO MATE. 2. TIPO 1 - MUROS : RECUBRIMIENTO DE BASE EPÓXICO PRO INDUSTRIAL Y PRE CATALIZADA SIN OLOR. CÓDIGO DE COLOR BLANCO 4320 LA PALETA ACABADO MATE
A1-08
H O J A
6ta.CALLE ORIENTE No. 20, ANTIGUA GUATEMALA .
Revisión:
2.93
3.00
3.00
2.93
Dibujó:
2010451
Revisión: R-0
A1-03
RECUBRIMIENTO EN MUROS
Código:
-
H O J A
6ta.CALLE ORIENTE No. 20, ANTIGUA GUATEMALA .
0.06
0.06
HOSPITAL OBRAS SOCIALES DEL SANTO HERMANO PEDRO
-
2010451
-
-
R-0
Código:
Dibujó:
JMM
Revisión: R-0
A
HOSPITAL OBRAS SOCIALES DEL SANTO HERMANO PEDRO
3. TIPO 2 - CIELO FALSO :
RECUBRIMIENTO DE BASE EPÓXICO PRO INDUSTRIAL Y PRE CATALIZADA SIN OLOR. CÓDIGO DE COLOR JUMPER HEDGE AP119-5 LA PALETA ACABADO MATE. 4. VALIDAR ESPECIFICACIONES DE RECUBRIMIENTOS HOSPITALARIOS CON PROVEEDOR
NEGATOSCOPIO
1.50
Revisión:
Propietario
Autorización SINERGIA arquitectura
Propietario
Autorización SINERGIA arquitectura Dibujo: JMM Fecha: 210419
EQUIPO Y ACCESORIOS COMPLEMENTARIOS
S6
operating room detail
www.aicsacorp.com
2
2
L/2
3
O A ON V SL
6
13
1
16
7 11 5
7
Dibujo:
10
Fecha:
0.60 x 0.50 x 0.90
Propietario
EQUIPO Y ACCESORIOS COMPLEMENTARIOS 1. CARRO CON DESFIBRILADOR PARA PARO CARDIACO 2. MESA MAYO DE ACERO INOX CON BANDEJA 3. MESA TIPO RIÑON DE ACERO INOX 4. VITRINA INSTRUMENTAL DE ACERO INOX 5. ELECTROCAUTERIO 6. TORRE PARA CIRUGÍA EN GENERAL 7. BANQUITOS GIRATORIOS DE ACERO INOX ELEVABLES + BANCOS DE ALTURA 8. MESA AUXILIAR DE ACERO INOX CON RODOS 9. CARRO DE TRANSPORTE ULTRASONIDO 10. ATRILES 11. RECIPIENTE DE ACERO INOX PARA DESECHOS PELIGROSOS 12. CUBETA PARA DESECHOS COMUNES 13. ASPIRADO QUIRÚRGICO (RECIPIENTE ,CONECTADO A VACIO) 14. DEPOSITO DE OBJETOS PUNZOCORTANTES 15. MESA AUXILIAR DE ACERO INOX PARA COLOCACION DE ACCESORIO 16. MAQUINA PARA ANESTESIA
15
O A ON V SL
Autorización SINERGIA arquitectura
L/2
L/2
12
L/2
14
8
4
9 1.00 x 0.50 x 0.90
0.0
9
R0.06
RECUBRIMIENTO
CURVA SANITARIA VER DETALLE "A"
Acabado recubrimiento epoxico Para control a humedad. Lavable.. Aséptico. Ignífugo. Fácil sello entre áreas.
Proveedor: JC Ingenieros o similar. PLANCHAS DE PLOMO DE 3 MM
DETALLE A - CURVA SANITARIA EN VÉRTICES / MATERIALES INSTALACIÓN EN MUROS / PISO. INSTALACIÓN EN MUROS / MUROS. INSTALACIÓN EN MUROS / CIELO FALSO.
MURO DE TABLAYESO
RECUBRIMIENTO TIPO 1
S7
operating room detail
SIMBOLOGÍA: RECUBRIMIENTOS HOSPITALARIOS: 1. EN PISO Y CURVA SANITARIA :
RECUBRIMIENTO CEMENTICO AUTONIVELANTE DE 9 MM DE ESPESOR CON CAPA INTERMEDIA AUTONIVELANTE EPÓXICO Y ACABADO POLIURETANO TRANSPARENTE. CÓDIGO DE COLOR BLANCO 4320 LA PALETA + COLOR JUMPER HEDGE AP119-5 LA PALETA ACABADO MATE. 2. TIPO 1 - MUROS : RECUBRIMIENTO DE BASE EPÓXICO PRO INDUSTRIAL Y PRE CATALIZADA SIN OLOR. CÓDIGO DE COLOR BLANCO 4320 LA PALETA ACABADO MATE
3. TIPO 2 - CIELO FALSO :
RECUBRIMIENTO DE BASE EPÓXICO PRO INDUSTRIAL Y PRE CATALIZADA SIN OLOR. CÓDIGO DE COLOR JUMPER HEDGE AP119-5 LA PALETA ACABADO MATE. 4. VALIDAR ESPECIFICACIONES DE RECUBRIMIENTOS HOSPITALARIOS CON PROVEEDOR
A1-09
H O J A
6ta.CALLE ORIENTE No. 20, ANTIGUA GUATEMALA .
RECUBRIMIENTO
Código:
Revisión:
0.06
HOSPITAL OBRAS SOCIALES DEL SANTO HERMANO PEDRO
2.93
3.00
Dibujó:
2010451
Revisión: R-0
VERSION ORIGINAL
Descripción:
REVISIONES
1.00 x 0.50 x 0.90
www.aicsacorp.com
B
A
C
D
E
H
31.65 6.15
3.10
12.95
3.15
6.30
AREA 27.01m² 15.40m² 9.55m² 13.77m² 8.80m² 5.46m² 12.71m² 7.55m² 27.45m² 127.69m²
POST-OPERATIVE 53.34 m²
POST-OPERATIVE 42.41 m²
MEDS. RESTROOM. 16.99m²
DOCTORS REST ZONE 78.38m²
2
3
NPT
+0.05
SECREATRY 9.13m²
LINEN CLOSET 7.15m²
ROOM STORE 9.55m²
4 BODEGA INDUSTRIAL 8.80m²
DIRTY ROOM 13.77m²
HALLWAY 215.48m² 9.40
SUMMARY
LAVADO QUIRÚRGICO
LAVADO QUIRÚRGICO
MEDS. RESTROOM 32.36m²
OR 3 18.44m² LAVADO QUIRÚRGICO
5 EXISTING OP ROOM 4 34.77m²
PHARMACY 12.71m²
OR 2 18.47m²
OR 1 18.47m²
MEDS RESTROOM 37.18m²
BANCA
6 NEW OP. ROOM 36.72m²
BANCA
ORS PRE AND POST OPS ADMINISTRATIVE AREAS REST. MEDS AREA COMPLEMENTARY AREA RESTROOMS HALLWAYS TOTAL
ÁREA 246.31m² 165.77m² 57.59m² 95.37m² 127.69m² 135.27m² 215.48m² 1043.48m²
CLEANING STORAGE 5.46m²
LINEN CLOSET 5.66m² OXYGEN PUMPS. 7.55m²
BANCA
AREA
EXISTING OP ROOM 5 36.56m²
4.90
AREA 78.38m² 16.99m² 95.37m²
WRAP ROOM 15.40m²
AUTOCLAVE 27.01m²
NEW OPERATION ROOM 36.56 m²
9.58
RESTING AREA MEDICS REST AREA MEDICS RESTROOMS TOTAL
ÁREA 32.36m² 37.18m² 34.48m² 31.25m² 135.27m²
BANCA
AREA 9.42m² 14.25m² 9.13m² 11.99m² 7.15m² 5.66m² 57.59m²
F MEDS. RESTROOMS M MEDS RESTROOMS F PUBLIC RESTROOMS M PUBLIC RESTROOMS TOTAL
BANCA
ADMINISTRATION WAITING ROOM GUEST INFORMATION SECRETARY COMPUTING ZONE CLOTHING CLOSET LINEN CLOSET TOTAL
SANITARY SERVICES
BANCA
AREA 57.26m² 12.76m² 42.41m² 53.34m² 165.77m²
LOCKERS
PRE-OPERATIVE PRE-OPERATIVE RESTROOM POST-OPERATIVE POST-OPERATIVE TOTAL
23.88
ENCAMAMIENTO
COMPUTING ROOM 11.99m²
LOCKERS
COMPLEMENTARY ZONES AUTOCLAVE WRAP ROOM ROOM STORE DIRTY ROOM INDUSTRIAL STORAGE CLEANING STORAGE PHARMACY OXYGEN PUMPS PHARMACY STORAGE TOTAL
9.00
OPERATING ROOM 1 OPERATING ROOM 2 OPERATING ROOM 3 OPERATING ROOM 4 OPERATING ROOM 5 NEW OPERATING ROOM NEW OPERATING ROOM NEW OPERATING ROOM TOTAL
SQM 18.47m² 18.47m² 18.44m² 34.77m² 36.56m² 36.56m² 36.72m² 46.31m² 246.31m²
6.03
AREA DE QUIROFANOS
17.98
SQM PER ROOM
2.95
1
GUEST INFO. 14.25m² PRE-OPERATIVE 57.26m²
PHARMACY AND STORAGE 27.45m²
7
NEW OP ROOM 46.31m²
WATING ROOM 9.42m²
BATHROOM 12.76m²
F PUBLIC RESTROOMS 34.48m²
M PUBLIC RESTROOMS 31.25m²
ROOM STORE
SERVICIOS SANITARIOS F MEDS. RESTROOMS M MEDS RESTROOMS F PUBLIC RESTROOMS M PUBLIC RESTROOMS TOTAL
POST OPERATIVE
ÁREA 32.36m² 37.18m² 34.48m² 31.25m² 135.27m²
RESUMEN DE ÁREAS AREA ORS PRE AND POST OPS ADMINISTRATIVE AREAS REST. MEDS AREA COMPLEMENTARY AREA RESTROOMS HALLWAYS TOTAL
ÁREA 246.31m² 165.77m² 57.59m² 95.37m² 127.69m² 135.27m² 215.48m² 1043.48m²
Dibujo:
JMM
-
-
-
Fecha:
210626
-
-
-
PLANTA DE ÁREAS
Descripción:
REVISIONES
-
-
-
-
-
A1-02
AUTOCLAVE
ÁREA 27.01m² 15.40m² 9.55m² 13.77m² 8.80m² 5.46m² 12.71m² 7.55m² 27.45m² 127.69m²
INFO AND WAITING ROOM
H O J A
AUTOCLAVE WRAP ROOM ROOM STORE DIRTY ROOM INDUSTRIAL STORAGE CLEANING STORAGE PHARMACY OXYGEN PUMPS PHARMACY STORAGE TOTAL
EXISTING OXYGEN PLANT AND PUMPS PHARMACY
6ta.CALLE ORIENTE No. 20, ANTIGUA GUATEMALA .
ÁREAS COMPLEMENTARIAS INDUSTRIAL STORAGE
2010451
MEDICS RESTROOMS DIRTY ROOM TOTAL
ÁREA 78.38m² 16.99m² 95.37m²
VERSION ORIGINAL
ÁREAS DE ESTAR MEDS AREA MEDICS REST AREA
COMPUTING CLOTHING STORAGE ROOM CLOSET
PRE OPERATIVE
-
WRAP ROOM
Revisión: R-0
ÁREA 9.42m² 14.25m² 9.13m² 11.99m² 7.15m² 5.66m² 57.59m²
JMM
ÁREA ADMINISTRATIVA WAITING ROOM GUEST INFORMATION SECRETARY COMPUTING ZONE CLOTHING CLOSET LINEN CLOSET TOTAL
SECRETARY
Dibujó:
ÁREA 57.26m² 12.76m² 42.41m² 53.34m² 165.77m²
MED. BATHROOMS
R-0
PRE-OPERATIVE PRE-OPERATIVE RESTROOM POST-OPERATIVE POST-OPERATIVE TOTAL
PUBLIC RESTROOMS MED. BATHROOMS PUBLIC RESTROOMS
Revisión:
ENCAMAMIENTO
ÁREA 18.47m² 18.47m² 18.44m² 34.77m² 36.56m² 36.56m² 36.72m² 46.31m² 246.31m²
Código:
OPERATING ROOM 1 OPERATING ROOM 2 OPERATING ROOM 3 OPERATING ROOM 4 OPERATING ROOM 5 NEW OPERATING ROOM NEW OPERATING ROOM NEW OPERATING ROOM TOTAL
HOSPITAL OBRAS SOCIALES DEL SANTO HERMANO PEDRO
AREA DE QUIROFANOS
Propietario
Autorización SINERGIA arquitectura
CUADRO DE ÁREAS POR AMBIENTE
POST OPERATIVE
NEW OP. ROOM
NEW OP ROOM
EXISTING OP ROOM 5
EXISTING OP ROOM 4
NEW OP ROOM
www.aicsacorp.com
3d plan - surgical area
medical zone
new operating rooms
post-operative
existing operating rooms
pharmacy - entrance - pre operative
pre operative and public RESTROOMS
ENCAMAMIENTO M
OFIC. UNIVERSIDAD
4.80
SECRETARIA
OFIC. PASTORAL
CORREDOR
SALIDA
CAJAS DE COBROS
TRABAJO SOCIAL
DEPARTAMENTO ESTADISTICA AMPLIACION DE CORREDOR
CORREDOR
LABORATORIO
LABORATORIO
PATIO MAS JARDIN No.2
AISLAM.
AISLAM.
OFC. JEFE FARMACIA
INGRESO
CORREDOR DE EVACUACION
B
CORREDOR
B
ENCAMAMIENTO H
OFICINA DECOMUNICACION
PATIO No.2
AISLAMIENTO 4
COMPRAS
CORREDOR DE EVACUACION
SS.BAÑOS
EMERGENCIA
PASILLO PRIVADO SOLO DOCTORES Y ENFERMERÍA
AUDITORIA
FCO.MARROQUIN
BANQUETA
Enfermería
CORREDOR
INGRESO
1.20
Enfermería
5.10
AISLAMIENTO 1
ROPERIA
AISLAMIENTO 2
AISLAMIENTO 3
* IT IS INTENDED TO DISTRIBUTE ALL THE ADMINISTRATIVE NEEDS AND SERVICES IN CLOISTER 4
CORREDOR
SS.BAÑOS
IGLESIA
ATRIO DE LA IGLESIA
S.Sanit. CENTRAL DE ENFERMERÍA CONTROL DE ACCESO
- Capacity for 90 beds - 4 Isolations with full bathroom
Bodega dede Comba.
AUDITORIA
- Bathrooms separated by sex for each bedding zone - Electrical system to connect beds
- Nursing station for each ward - Medical equipment + storage - Emergency clinic
BEDDING ARCHITECTURE PROPOSAL
CORREDOR
HACIA AREA DE ENCAMAMIENTO
- Oxygen and suction system for beds
BACK OFFICE ENFERMERÍA
BEDDING PROPOSAL: 60 BEDS + 4 ISOLATION ROOMS
CIRCULACION
COMPRAS
SECRETARIA
BLANCOS Y EQUIPO MÉDICO
Jefatura de Medicos
CORREDOR DE EVACUACION
Patio renovation :
305.50 m2
New bedding construction: 756.50 m2 TOTAL :
1107.00 m2
6a. CALLE ORIENTE
REQUIREMENTS
B
A
4.90
9.40
9.00
12.95
3.15
1.20
5.10
AISLAMIENTO 1
AISLAMIENTO 2
ENCAMAMIENTO M 6.15
Enfermería
POST-OPERATORIO
AISLAMIENTO 3
3.10
POST-OPERATORIO
QUIRÓFANO NUEVO
QUIRÓFANO No.5
QUIRÓFANO No. 4
1
B
6.03 2.95 17.98
ENCAMAMIENTO H
BANQUETA
AISLAMIENTO 4
31.65
12.95
NPT
+0.05
NPT
+0.05
ÁREA DE MÉDICOS
CORREDOR D
SECRETARIA
COMPUTACIÓN
ROPERIA
BOD. LIMPIEZA
LAVADO QUIRÚRGICO
S.S.M.
B
POST-OPERATIVE 42.41 m²
WRAP ROOM
3
Enfermería
PATIO
B
MEDS. RESTROOM. 16.99m²
4.80
DIRTY ROOM
QUIRÓFANO No. 1 QUIRÓFANO OJOS
QUIRÓFANO No. 3
CIRCULACIÓN INTERNA
AUTOCLAVE
2
CILINDROS DE OXÍGENO
BODEGA DE EQUIPO INDUSTRIAL
SS.BAÑOS
DOCTORS REST ZONE 78.38m²
C
HACIA ÁREA DE ENCAMAMIENTO
CORREDOR
ROOM TO STORE
LAVADO QUIRÚRGICO
LAVADO QUIRÚRGICO
FARMACIA
QUIRÓFANO No. 2
PRE-OPERATORIO
SECREATRY 9.13m²
3.15
S.S.M.
LOCKERS BANCA
S.S.H.
BANCA
BANCA
DIRECTORIO
INGRESO DE MÉDICOS
6.30
COMPUTING ROOM 11.99m²
CORREDOR S.S.H. PUBLICO
WRAP ROOM 15.40m²
AUTOCLAVE 27.01m²
H
NEW OPERATION ROOM 36.56 m²
SS.BAÑOS
LINEN CLOSET 7.15m²
4
DIRTY ROOM 13.77m²
BLANCOS Y EQUIPO MÉDICO
BACK OFFICE HALLWAY ENFERMERÍA
LAVADO QUIRÚRGICO
LAVADO QUIRÚRGICO
AUDITORIA
9.40
215.48m²
EXISTING OP ROOM 5 36.56m²
CLEANING STORAGE 5.46m²
COMPRAS
MEDS.
OR 3 18.44m²
SECRETARIA
Jefatura deRESTROOM Medicos 32.36m²
LAVADO QUIRÚRGICO
LOCKERS
5
4.90
23.88
OR 1 18.47m²
OR 2 18.47m²
6ta.CALLE ORIENTE No. 20, ANTIGUA GUATEMALA .
Dibujó:
JMM
Código:
Descripción:
VERSION ORIGINAL
2010451
-
-
-
-
H O J A
-
-
A1-03
Nursing central and visitors control REVISIONES
Revisión: R-0
NEW OP. ROOM 36.72m²
PLANTA DE ARQUITECTURA
Fecha: 210419
Dibujo: JMM
-
-
-
-
-
-
Autorización SINERGIA arquitectura
Propietario
According to design regulations 1 bathroom for every 5 beds is requested.
LINEN CLOSET 5.66m² OXYGEN PUMPS. 7.55m²
MED REST 37.18
BANCA
HOSPITAL OBRAS SOCIALES DEL SANTO HERMANO PEDRO
R-0
9.58
workflow diagram
HACIA AREA DE ENCAMAMIENTO
Visitors and nursing bathrooms
6 Revisión:
www.aicsacorp.com
Pacients bathrooms Administrative zone for nursing
PHARMACY 12.71m²
BANCA
Bedding Zone
CORREDOR DE EVACUACION
BANCA
Isolation and emergency zone
EXISTING OP ROOM 4 34.77m²
BANCA
CIRCULACION
CORREDOR
LOCKERS
CENTRAL DE ENFERMERÍA CONTROL DE ACCESO
Bodega dede Comba.
BODEGA INDUSTRIAL 8.80m²
ROOM STORE 9.55m²
S.Sanit.
BANCA
LOCKERS
BANCA
BANCA
6a. CALLE ORIENTE
BANCA
9.00
E
BANCA
S.S.H.
PASILLO PRIVADO SOLO DOCTORES Y ENFERMERÍA
3.10
POST-OPERATIVE 53.34 m²
INGRESO
S.S.M. PUBLICO
AISLAM.
6.03
6.15
CORREDOR
S.S.
AISLAM.
DIRECTORIO
INGRESO
PATIO TOP VIEW
INFORMACIÓN
EMERGENCIA
BLANCOS
BOMBAS ASPIRACIÓN
DE QUIRÓFANOS
FARMACIA Y BODEGA
FCO.MARROQUIN
DEPARTAMENTO ESTADISTICA
QUIRÓFANO NUEVO
QUIRÓFANO NUEVO
PLANTA DE ARQUITECTURA
ÁREAS EXISTENTES NO INTERVENIR
ESCALA 1:100
OFIC. UNIVERSIDAD
OFIC. PASTORAL
2.95
E
A
1
The study of workflows are vital to generate controlled corridors for medical staff and visits.
D 31.65
17.98
CORREDOR DE EVACUACIÓN
ROPERIA
C
1
9.58
2
3
4
5
6
7
23.88
GUEST INFO. 14.25m² PRE-OPERATIVE 57.26m²
PHARMACY AND STORAGE 27.45m² WATING ROOM
BATHROOM 12.76m²
FP RE 34
NURSING
BEDDING WARD PACIENT RESTROOMS
ISOLATION ZONE
NURSING
PUBLIC RESTROOMS
EMERGENCY CLINIC
BEDDING WARD
NURSING
NURSING
NURSING STORAGE + BACK OFFICE
BEDDING WARD
60+ BEDSS
PUBLIC RESTROOMS
NURSING AND ACCESS CONTROL
BEDDING WARD
3d plan bedding area
bedding area/ward
bedding recovery patio
DESIGN AND CONSTRUCTION Obras Sociales del Santo Hermano Pedro and the Asociación Amigos Pro Obras Sociales have chosen AICSA to design for the Expansion and Remodeling of the Surgical Ward of the Hospital. The president of AICSA and his family, as well as their employees, have been friends and allies of the Obras Sociales and were very generous in their cooperation on the Hogar Virgen del Socorro project. The Franciscan Provincial leadership and the brothers at Obras Sociales have chosen AICSA to restore and model the hospital site, an
important project given that the construction dates to the XVII Century. AICSA is a Guatemalan company dedicated to the design, construction and development of real estate projects and was founded in 1975. The team is conformed of highly qualified professionals that lend their services to provide the best quality to their clients, within Guatemala and elsewhere. As a team, they have laid out a vision to provide the best design and construction services, through professional best practice,
education, and research, employing an Integrated Multidisciplinary System. The mission of AICSA is to offer a complete array of products and consulting, design, and execution services in building development, from the concept stage all the way through to the completion of the project. AICSA as a business model offers the whole value chain needed for each project it develops in the following areas: industrial, commercial, institutional, residential, corporate and infrastructure and electrical power.
AMIGOS PRO OBRAS SOCIALES amigosproobras.org @amigosproobras 2462-1800 8va. Avenida 3-90 Zona 14, Edificio La Rambla Torre II Tercer Nivel, Of 3-2 OBRAS SOCIALES DEL SANTO HERMANO PEDRO hermanopedrogt.org @hermanopedrogt 7931-2100 6ta. Calle Oriente #20 Antigua Guatemala
CONTACTS Dra. Julissa Pineda Tel: 4063-4502 jefaturadecirugia@aosshp.org Head of Surgical Room Obras Sociales del Santo Hermano Pedro
Licda. Tamalyn Gutierrez Tel:3041-3382 TGutierrez@faithinpractice.org Special Project Advisor Faith In Practice representative on Project Oversight Committee
Lic. Edgar Celada Tel:5203-8360 celada.edgar@gmail.com Guatemalan Business engagement Amigos representative on Project Oversight committee