Mila Giovacchini
Part 1 Architecture & Work Experience Portfolio
-2 4 4 -2 4 6 4 6 6 4 4 4 -2 0 0 2 2 0 2 -2 6 7 6 5 6 6 4 2 6
University of Cambridge - Year 3 For a Civic River
Setting the Scene
The assigned site sits on the bend of the river Lea, within an industrial estate. As housing pressures increase in central London, this area is bound to change drastically. With new communities developing either side of the river, I imagine a better use for the distribution centre currently on site: something to bring these future communities together.
New Bridges Industrial/Commercial Tube Stations Forecasted Residential New Connections Cultural, Civic, Recreational Centre 500m
Sainsbury's
Cody Dock
river Lea site
Poplar Baptist Church
150m 3
Residential
How a non-place becomes a place
Plans are already under way to make the River Lea more accessible to the public. A riverside pedestrian and cycle path will be opened in the next decade.
In the next 50 years, having a local industry, such as a brewery, with a commercial public front on site would open up space for the public, and start making this pensinsula a destination. Two new bridges would help people access this area form across the river, and form connections between communities.
In the next 150 years, a once forgotten and inaccessible part of the river can be turned into a cultural, civic, and recreational centre for surrounding communities.
I propose to achieve this through 3 main moves:
> landscaping for a new public park on the peninsula
> a new dock integrated within the landscape
> splitting the existing shed into 2 new sheds at a more human scale: one to host a boatyard and office complex, the other more open-ended, for a range of cultural, civic, and recreational purposes.
Today + 50 years
4
+ 150 years
150m
A better shed
Landscaping around the site preserves existing biodiversity, and increases ground permeability by digging up a previously tarmacked area. The new dock that splits the existing shed also mitigates flood risk by allowing water levels to rise and fall in the landscape.
South of the new dock, the ground rises to meet the cultural shed: a large unprescribed covered space, a landmark that can accommodate a range of activities and events: a market, a playground, or a venue.
-2 4 4 -2 4 6 4 6 6 4 4 4 -2 0 0 2 2 0 2 -2 6 7 6 5 6 6 4 2 6 Lea crafts 50m 50 m productive shed cultural shed river Lea new dock
5
The Cultural Shed
On the southern third of the original shed, the slab, steel structure, and roofing are kept, but the walls are unclad and wrapped in a patchwork of recycled fishing nets, a common source of plastic pollution in oceans and rivers. The cultural shed glows red and becomes a recognisable landmark for the neighbourhood.
A couple of permanent timber frame pods are bolted into the slab to provide washroom and storage spaces. They are clad in recycled scaffolding planks, which are sturdy and weatherproof.
6
The Productive Shed
Almost all the historic shipbuilding industries of the Lea and Thames have shut.
London threaten these spaces for industry even more.
How will the increasing demand for living, moving, and playing on water be met? How will the need for workspaces for businesses and makers be met?
The Productive Shed responds to these issues by providing a boatyard to revive the shipbuilding and repair industry on the Lea, and a series of flexible office spaces available to rent by local businesses and makers.
It sits in the northern third of the original shed. Steel hulls are welded and painted, then dropped in the water to be moved to one of the three docks. Here the shells are fitted with all necessary furniture, electrical and plumbing work. At the back of each dock, mezzanine offices overlook the carpentry work below.
1F -2 4 -2 4 6 4 6 6 0 0 2 6 25 m 7 2F Deliveries Steelwork Storage Boatyard Storage Steelwork Hall Boatyard Courtyard Break Room 2 3 4 5 6 7 1 2 3 4 5 6 7 Cafeteria Boatyard Mezzanines Offices 8 9 10 8 9 9 10 10 10 6 6
A Boat Building Complex
Two triple height spaces are dedicated to boat building: the steelwork hall and the boatyard over the docks. Glulam columns and beams make up the structure, except in the steelwork hall, where the largest span on the building is supported by steel bowstring trusses and columns.
Circulation occurs around a central courtyard, and a kitchen serves a double-height cafeteria on the first floor. Offices of a range of different sizes overlook the boat building spaces. The boatyard docks are left open to view from the park and cultural shed. The steelwork hall is opened and closed to the water by a large PVC curtain.
Deliveries
Steelwork Storage
Boatyard Storage
Steelwork Hall
Boatyard
Courtyard
Break Room
Cafeteria
Boatyard Mezzanines
Offices
10
20 m -2 4 4 -2 4 6 4 6 6 0 0 2 -2
m
8
2 3 4 5 6 7 8 9 10 4 10 2 10 6 7 8 9 5 1 6
The Boatyard
In the boat bays, the columns and trusses are stained dark to stand out against the light marine plywood of the walls, and create rhythm in the interior boatyard facade. The ground floor is clad in recycled plastic panels made from waste collected in the Lea and the Thames. Columns are bolted into the floor with tall steel fixings, breaking up the triple-height space. The steel fixings, top running crane, and mezzanine structure are all painted a dark petrol blue. The mezzanine’s cross bracing reflects that on the roof.
9
1:50 model
Elevation of the central building, from the Boatyard
6 m
Interior Elevation Study
Materiality and Light
The top running bridge crane allows boats and other heavy machinery like motors and appliances to be lifted and fitted in. The panels closing off the break room are translucent to let light in. During the day, light pours in from the top of the trussed roof and from the open ends of the docks that face South. At night, the cafeteria and offices give a warm glow and light up the space.
material palette
10
1:50 interior model, the Boatyard at night
Testing light
Two timber structures meet
The ground floor of the central buidling is raised to add insulation over the existing concrete base. CLT floors span over Glulam columns and beams, allowing for a small cantilever on the second floor. Timber stud walls are clad in either recycled plastic panels, or marine plywood. A gap separate the uninsulated truss structure over the docks and the central building, creating where cross bracing joins the two timber structures.
Future possibilities...
Designing for flexibility is key to building sustainably. Should the need for boat building and repair cease or diminish, the buildings can be re-inhabited to host different events, businesses and services. Should the Lea become clean enough, the new docks would make an ideal place to swim. Here, the facility is re-imagined as a sport and leisure complex, complete with bowling alleys by the water.
3 m 11
A new office, boats downstairs Yoga studio, badminton downstairs
Boat building views from across the new dock
A leisure complex by the docks
Dissertation: Un-gentrifiable Marseille?
Neil Smith’s gentrification in Marseille’s city-centre: case study of the rue de la République.
Abstract
Through the case study of the Rue de la Republique, Neil Smith’s work on gentrification is used to highlight the trajectory and actors of gentrification in Marseille’s centre. Marseille seems to follow all stages of Smith’s model simultaneously. This dissertation argues that the prism of gentrification is useful to recognise patterns of investment and denounce the tactics of profitability that lead to exclusion. The focus is on the role of the state and council in encouraging private investment as part of a neo-liberal logic. The long-standing project of “re-conquering” the centre aims to make Marseille a competitive city, a feat not without violence for existing working-class inhabitants. The difficulties in transporting gentrification theory are exposed through the particularities of Marseille’s historical and socio-demographic context, which also explain the varied results for developers, and relative failures of the council’s gentrification objectives.
12
JTP
Part 1 Architectural Assistant
Wintringham, St Neots
Wintringham, St Neots
My team and I worked on the production of a design code for the second phase of a 2800 home development on the edge of St Neots. Part of a larger expansion scheme for the city, the first phase is under construction and was approved as part of a hybrid planning application granted in 2018.
We worked collaboratively with the client, council and consultants to establish rules and guidance for housebuilders. We developed a layout for 800 homes, sports facilities, a local centre, and a primary school. I produced the imagery for the design code and oversaw the production of the document itself.
HIGHER SECTION OF BUILT FORM CONCENTRATED ON CORNER
PARKING TO THE REAR TO ACTIVATE GREEN SPACE AND PREVENT VISITOR PARKING
LANDSCAPE TO MAXIMISE VIEWS OF SCHOOL BUILDING
MARKER BUILDINGS TO FRAME ENTRANCE TO COMMUNITY GARDENS
Marker Building
* * Landscape Screening School Parking
Built Form Emphasis
Key Buildings
Residential Frontages
School Frontage
Mixed Use Frontage
School Forecourt
Indicative School Entrance
Key Area: the local centre
Local Facilities
Carriageway
Footpaths/Plaza
Indicative Parcel Access
Key Views
Indicative Bus Shelters
PARKING TO THE REAR TO MAXIMISE ACTIVE FRONTAGE MULTI FUNCTIONAL CIVIC SPACE
PARKING TO THE REAR TO MAXIMISE ACTIVE FRONTAGE
TRAFFIC CALMING MEASURE TO PRIORITISE PEDESTRAN MOVEMENT
LEAP/NEAP
Annotated 3D view: Sketchup and Illustrator
P
Indicative SuDs Indicative Trees
Traffic Calming Intervention
14 Images curtesy of JTP
Parcel Boundary Parcel Boundary A AA Built Form Shared Private Driveway min 5m Defensible Space Defensible Space 3m Footway Cycleway Carriageway minimum 6.1m Verge min 2.5m 3m Footway Cycleway Built Form Vergevaries min 2.5m Highway Corridor min 17.1 Frontage Characters Street types - sections A AA Adult Football Pitch: 100m x 64m Sports Pavilion 5m 16m 12m 7m 3m 30m 24m Key Area: Interface between homes and sports pitches 15
Images curtesy of JTP
Netherhall Gardens, Cambridge
This is a planning permission for a 200-home development on the edge of Cambridge. I analyzed the local architectural context, then established design principles, an architectural language and material palette for our site, picking motifs to create both variety and cohesion across the houses. We collaboratively agreed on a visual style that worked with the narrative of the project. I modelled early massing in Sketchup and rendered street elevations and 3D views in photoshop.
15
WC Kitchen Dining Study Utility Entrance St. Bedroom Bedroom Hallway Bathroom Living Room St. Bedroom Bedroom En-suite Hallway St. B B A A FFL 10.200 m HT 4.1a Ridge Ground Floor Plan First Floor Plan Second Floor Plan Roof Plan Left Side Elevation Front Elevation Rear Elevation Front Elevation Left Side Elevation Rear Elevation (Type M1) (Type M1) (Type M2) (Type M2)
House modelled in Revit
Masterplan - Photoshop
Street Elevations
Images curtesy of JTP
M4(2)
Illustrative
Testing
- Photoshop
Kitchen Dining Study Utility Bedroom Bedroom En-suite Hallway St. B A A Ground Floor Plan First Floor Plan Second Floor Plan Roof Plan WC Kitchen Dining Study Utility Entrance St. Bedroom Bathroom Bedroom Bedroom Hallway St. B B A A Ground Floor Plan First Floor Plan Second Floor Plan Roof Plan Bedroom Bedroom Hallway Bathroom Living Room St. Bedroom Bedroom En-suite Hallway St. B B A A Notes Do not scale from this drawing. All contractors must visit the site and be responsible for dimensions. All construction information should be taken from igured Any discrepancies between drawings, specifications and must be brought to the attention of the supervising officer. This drawing & the works depicted are the copyright of JTP. This drawing is prepared for the specific project stage in section below and it is not intended to be used for any other all reasonable efforts are used to ensure drawings are accurate, no liabilityfor any reliance placed on, or use made of, this for purposes other than those stated in the Drawing Status First Floor Plan Second Floor Plan Roof Plan Housetype 4.1a Level 00 45.61 m² 01 48.35 m² 02 48.35 m² 142.32 m²
Avenue Park Road, Tulse Hill
My team and I successfully submitted planning for this apartment block in Lambeth in 2023. I was involved in the later stages of the project, putting together and creating visuals for the Design and Access Statement, and editing and checking the flat layouts for compliance with building regulations and national space standards.
Elevation (Revit, Photoshop)
37.0 m² 2B4P Duplex B-01-02 Corridor Bathroom Master Bedroom Storage Utility 3474 3051 2111 979 1900 2150 1950 2.10m 50.1 m² 2B4P Duplex B-01-02 Kitchen Dining Living Bedroom WC Storage Hall 2986 11873 3474 1014 1800 3109 Balcony 3474 23.84m 2.61m 7.59m 0.81m THIS DRAWING TO BE READ CONJUCTION WITH ASSOCIATED PLANS, SECTIONS, ELEVATIONS CONSTRUCTION DETAILS. SPACE STANDARDS TO COMPLY WITH PART M4(2), M4(3) & LONDON PLAN. DIMENSIONS SHOWN ON THIS DRAWING ARE TO FACE OF RELATION TO NDSS REQUIREMENTS. TO BE CONSTRUCTED IN LINE WITH THE BUILDING REGULATIONS AND RELEVANT BRITISH STANDARDS. ALL PRODUCTS AND MATERIALS TO BE INSTALLED IN STRICT RECOMMENDATIONS, AND HAVE BBA OR OTHER 3RD PARTY REFER TO STRUCTURAL ENGINEERS DRAWINGS AND SPECIFICATIONS FOR INFORMATION RELATED TO STRUCTURAL ITEMS. ALL SERVICES TO MEP ENGINEERS PERFORMANCE REFER TO MEP FOR FULL RWP AND SVP INFORMATION. DRAINAGE INDICATIVE ONLY. REFER TO MEP ENGINEERS' SPECIFICATION. ALL PARTITIONS, WINDOWS, EXTERNAL WALL FLOORS APPOINTED ACOUSTICIAN. REFER TO THE FOLLOWING REFERENCE FOR GA PLANS 01849-APR-JTP-ZZ-00-DR-A-1000 01849-APR-JTP-ZZ-01-DR-A-1001 01849-APR-JTP-ZZ-02-DR-A-1002 01849-APR-JTP-ZZ-04-DR-A-1004 01849-APR-JTP-ZZ-06-DR-A-1006 01849-APR-JTP-ZZ-07-DR-A-1007 REFER TO THE FOLLOWING REFERENCE FOR ELEVATIONS 01849-APR-JTP-ZZ-ZZ-DR-A-1101 REFER TO THE FOLLOWING REFERENCE FOR SECTIONS 01849-APR-JTP-ZZ-ZZ-DR-A-1200 01849-APR-JTP-ZZ-ZZ-DR-A-1201 Do not scale from this drawing. All contractors must visit the site and responsible taki and All construction information should be taken from figured dimensions only. Any discrepancies between drawings, specifications and site conditions This drawing works depicted are copyright JTP. This drawing prepared for the specific project stage the Drawing purpose. Whilst reasonable efforts are used to ensure drawings are accurate, JTP accept no liability for any reliance placed on, use made of, this plan anyone for purposes other than those stated Drawing Status below. Drawing Title Scale @A3 Drawing No. Drawing Status Scale Bar Project JTP Studios, Unit Pennington Street London, E1W 2AP +44 (0) 20 7017 1780 www.jtp.co.uk P1 Typical Apartment Layout 2B4P - Duplex Avenue Park Rd Stage 50 Typical Apartment Layout - 2B4P Ground Floor 01.03.23 First Issue. HW 50 Typical Apartment Layout - 2B4P First Floor STORAGE REQUIREMENT OF 2B4P 2.0m
Site Boundary 8 Storeys 7 Storeys 6 Storeys 5 Storeys 4 Storeys 3.5 Storeys 3 Storeys 2.5 Storeys 2 Storeys 1 Storey Under Construction
88.8 m² 3B5P C-02-03 Ensuite Storage Bathroom Kitchen Dining Living Bedroom 3 Bedroom Master Bedroom Hall Balcony Utility 1333 4962 2571 3115 2150 3383 3768 2750 3013 6313 2050 2150 1482 1200 900 2750 2.18m 0.75m Storage 1.77m 4.41m ASSOCIATED PLANS, SECTIONS, ELEVATIONS SPACE STANDARDS TO COMPLY WITH PART M4(2), M4(3) LONDON PLAN. DIMENSIONS SHOWN ON THIS DRAWING ARE TO FACE OF PLASTERBOARD AND PROVIDE CLARITY ON ROOMS SIZES IN REGULATIONS AND RELEVANT BRITISH STANDARDS. ALL PRODUCTS AND MATERIALS TO BE INSTALLED IN STRICT ACCORDANCE WITH MANUFACTURERS GUIDANCE AND RECOMMENDATIONS, AND HAVE BBA OR OTHER 3RD PARTY ACCREDITED CERTIFICATION. REFER TO STRUCTURAL ENGINEERS DRAWINGS AND SPECIFICATIONS FOR INFORMATION RELATED TO STRUCTURAL ITEMS. SPECIFICATION. REFER TO MEP FOR FULL RWP AND SVP INFORMATION. DRAINAGE INDICATIVE ONLY. REFER TO MEP ENGINEERS' SPECIFICATION. ALL PARTITIONS, WINDOWS, EXTERNAL WALL FLOORS REQUIRE CONFIRMATION OF ACOUSTIC PERFORMANCE BY REFER TO THE FOLLOWING REFERENCE FOR GA PLANS 01849-APR-JTP-ZZ-00-DR-A-1000 01849-APR-JTP-ZZ-01-DR-A-1001 01849-APR-JTP-ZZ-03-DR-A-1003 01849-APR-JTP-ZZ-05-DR-A-1005 01849-APR-JTP-ZZ-06-DR-A-1006 01849-APR-JTP-ZZ-07-DR-A-1007 01849-APR-JTP-ZZ-ZZ-DR-A-1100 REFER TO THE FOLLOWING REFERENCE FOR SECTIONS 01849-APR-JTP-ZZ-ZZ-DR-A-1200 01849-APR-JTP-ZZ-ZZ-DR-A-1201 contractors must visit the site and be responsible for taking and checking dimensions. construction information should taken from figured dimensions only. must be brought attention the supervising officer. This drawing the works depicted are the copyright JTP. This drawing prepared for the specific project stage Drawing Status section below and not intended to used for any other purpose. Whilst reasonable efforts are used ensure drawi this plan by anyone purposes other than those stated Drawing Status below. Date Rev Description Drawing Title Scale @A3 Drawing No. Drawing Status Scale Bar Drawn Client Project Chkd JTP Studios, Unit The Rum Warehouse Pennington Street London, E1W 2AP +44 7017 1780 50 P1 Typical Apartment Layout 3B5P 01849 Avenue Park Rd Stage 1 50 Typical Apartment Layout 3B5P STORAGE REQUIREMENT OF 3B5P 2.5m
Presenting Contextual Research (Illustrator)
17 Images curtesy of JTP
Typical Flat Layouts (Revit)
CONTACT +44 7853137677 milagiovac@gmail.com Mila Giovacchini