ELECTRICAL

Page 1


NOTES:

1 UNLESS NOTED OTHERWISE, LIGHT SWITCHES SHALL BE INSTALLED AT 1300mm IN NON WET AREAS & 1350mm IN WET AREAS FROM SLAB LEVEL

2 UNLESS NOTED OTHERWISE, INDOOR DPOs SHALL BE INSTALLED AT 350mm HEIGHT FROM SLAB LEVEL OR FF TIMBER FLOOR (NOT FROM WET AREAS STEP DOWN FLOOR)

3 TIMBER SUPPORTS SHALL BE INSTALLED FOR CEILING FANS, PENDANT LIGHTS, HEAVY CHANDLIER TVS AND WALL MOUNTED RACKS ANY CEILING MOUNTED EQUIPMENT (AS SHOWN)

4 ALL ABOVE BENCH DPOs SHALL BE INSTALLED AT 1200mm FROM SLAB LEVEL (NOT FROM WET AREAS STEPDOWN FLOOR).

5 ALL x4 WATER CONTROLLERS OR BLANKING PLATES TO BE INSTALLED AT 1550MM FROM SLAB LEVELS

6 TOTAL x4 LED MIRRORS TO BE INSTALLED IN ALL BATHROOMS AND LAUNDRY AND SWITCH SHALL BE LOCATED AT ADJACENT WALL

7 INSTALL CAT 6 & LV CONTROL CABLES BETWEEN DOOR RIGNER AND INTERCOM SCREEN AS WELL AS DOOR RINGER AND FF ROB 2 DATA TERMINATION HUB

8 SPEAKER IN LIVING ROOM & BED 3 TO BE WALL MOUNTED 1550 ABOVE FFL AT SHOWN OFFSETS

FIRST FLOOR (FF)

64mm HOLE FOR SENSOR & CENTRE OF SENSOR TO BE PRECISELY 110mm FROM URINAL EDGE

DDP & TV POINT AT 1300 ABOVE FFL FOR

SWITCHES FOR HEATED TOWEL RAIL AND URINAL CEILING SENSOR

NOTES:

1 UNLESS NOTED OTHERWISE, LIGHT SWITCHES SHALL BE INSTALLED AT 1300mm IN NON WET AREAS & 1350mm IN WET AREAS FROM SLAB LEVEL

2 UNLESS NOTED OTHERWISE, INDOOR DPOs SHALL BE INSTALLED AT 350mm HEIGHT FROM SLAB LEVEL OR FF TIMBER FLOOR (NOT FROM WET AREAS STEP DOWN FLOOR)

3 TIMBER SUPPORTS SHALL BE INSTALLED FOR CEILING FANS, PENDANT LIGHTS, HEAVY CHANDLIER, TVS AND WALL MOUNTED RACKS ANY CEILING MOUNTED EQUIPMENT (AS SHOWN)

4 ALL ABOVE BENCH DPOs SHALL BE INSTALLED AT 1200mm FROM SLAB LEVEL (NOT FROM WET AREAS STEPDOWN FLOOR).

5 ALL x4 WATER CONTROLLERS OR BLANKING PLATES TO BE INSTALLED AT 1550MM FROM SLAB LEVELS

6 TOTAL x4 LED MIRRORS TO BE INSTALLED IN ALL BATHROOMS AND LAUNDRY AND SWITCH SHALL BE LOCATED AT ADJACENT WALL

7 INSTALL CAT 6 & LV CONTROL CABLES BETWEEN DOOR RIGNER AND INTERCOM SCREEN AS WELL AS DOOR RINGER AND FF ROB 2 DATA TERMINATION HUB

8 SPEAKER IN LIVING ROOM & BED 3 TO BE WALL MOUNTED 1550 ABOVE FFL AT SHOWN OFFSETS

FIRST FLOOR (FF)

GROUND

NOTES

1. EAVES DOWNLIGHTS FOR EACH SIDE WALL SHALL HAVE SEPERATE LIGHT SWITCHES.

2. TWO OFF 25mm HD Rigid PVC ORANGE ELECTRICAL CONDUITS TO BE INSTALLED IN THE BRICK WALLL CAVITY FROM ROOF TO UNDER FUTURE SOLAR INVERTER LOCATION FOR SOLAR PANEL DC CABLING.

2. ONE OFF 25MM FLEXIBLE ELECTRICAL CONDUIT TO BE INSTALLED BETWEEN METER BOX AND FUTURE SOLAR INVERTED FOR AC CABLING.

IMPORTANT NOTE: MARKUP DATING
NOT ACTIONED - THIS IS THE LATEST LAYOUT WHICH NEEDS TO DRAFTED ON SHT 3 WITH OFFSETS
data point, offset on SHT 3 and SHT 2 as well.

REAR ELEVATION

IMPORTANT

MARKUP DATING

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.