Demolition Methods and Process
Explained
Demolition or deconstruction is the process of destroying a structure to build up new construction, cleaning up an area, or when the structure’s survival becomes crucial for its residents or neighbouring structures. It’s a lengthy, time taking process that requires detailed pre planning, thoughtful layout, and precise execution, keeping the safety of the workers as well as the safety of the surrounding area and nearby residents in mind.
DemolitionCompaniesinMelbourne have the expertise to chalk, out a detailed plan before dismantling a structure. But there are numerous reasons to ponder over before completely writing off a building, some of which may be legal, for safety, for repairs, or due to the lifespan completion.
Then comes the responsibility of choosing the appropriate way from various ways of demolition and choosing the correct one depends on many factors like the cost involved, time given, construction material used, any hazardous materials involved, involvement of any underground construction, the quantity of dust, noise and debris, etc.
ProcessofDemolition
The whole process of wrecking a building is lengthy and includes the following steps
ConductingaDetailedSurvey
The first and foremost step is conducting a detailed survey before starting the demolition. Demolition Contractors from Broadmeadows engage skilled professionals who are adept in this field.
Thetwotypesofsurveysare
• Surveyofthebuilding – This includes investigating the height of the building, its usage, foundation, construction material used, drainage methods used, the inclusion of any hazardous material, use of insulation, if any, underground construction, if any, etc. Also, the traffic conditions in the area, pedestrian footfall, impact of the pollution due to noise, debris, and fumes from demolition, are worth considering.
• Survey of the Structure – This includes investigating the structural plan of the building, like the present condition of the building, the condition of the underground constructions, if any present, the construction method employed, safety measures to be involved, etc.
• Getting Rid of Hazardous Materials The next step in the process is identifying the hazardous materials and getting rid of them. Involvement of any hazardous material like asbestos, any radioactive material, or anything releasing obnoxious fumes can prove disastrous for the environment, the surrounding area, and nearby occupants. Demolition Contractors from Broadmeadows ensure that specialised personnel are appointed for this most crucial step in the process.
• Preparation of a Detailed Plan After the initial surveys, Demolition Contractors from Broadmeadows chalk out a comprehensive layout of the demolition.
Thedetailsinvolve –
• Building’s height
• Building’s location
• Building’s distance from other buildings and public structures
• Sequential details of the whole process
• Safety measures for the personnel involved
• Precautions involved for the adjoining areas and buildings
• Detailed information about the disposal of the debris
• The time involved in the demolition
• The time involved in the clearance of the debris
Taking Appropriate Safety Measures
All the personnel gets proper training before the demolition, as their safety is of the utmost importance. They are the ones who would have first-hand experience with demolition. Demolition Contractors from Broadmeadows conduct proper and detailed workshops, at regular intervals for the safety of their personnel. Theygetthetrainingfor
1. Total Demolition - This includes the complete wrecking of the structure. When the lifespan of the building is over, and its survival may prove dangerous to one and all, this method is advisable. This technique requires trained and competent personnel as the already weakened structure can collapse with a minor jolt. It asks for apt assessment of the number of explosives. Excessive vibrations may damage the adjacent structures, and flying debris may cause external damage to some. The safety of everyone involved and everyone around is of extreme importance.
2. InteriorDemolition This includes tearing down interior parts of the building for renovation. The renovation may include the removal of tiles, walls, and pipes, to change the interior decoration or to change the commercial property as per the requirement of the new occupant or already bored old occupant.
3. SelectiveDemolition- This includes tearing down specific parts of the structure, leaving the other parts intact. This is appropriate when some parts of the structure become non functional and are not in use anymore or maybe not functioning as per their capacity. It’s advisable to get rid of the non-functional parts and start new construction in stages. This is also preferable when an additional space has to be created for expansion.
4. Deconstruction/DismantlingDemolition This includes demolishing the structure in a way where the building is demolished by carefully dismantling its parts. The parts are used for refurbishment, reuse, or recycling. It’s an excellent way of saving the parts for later use or remoulding for future use. All the costly materials and raw materials are saved and reused. This requires more manual labour as it’s a controlled form of demolition.
5. ManualDemolition- This is the most traditional method of demolition, which includes the usage of wrecking balls, hammers, sledges, wires, winches, wedges, excavators, etc, for the demolition of a structure. Trained experts are recruited by DemolitionContractorGlenroy, and stringent measures are undertaken as manual handling can also cause serious injuries.
ToSumUp
For a safe and efficient completion of your project always remember to hire experts, as the demolition work is gravely threatening and needs adept supervision. The tools involved, the handling of the on site processes, and dealing with hazardous materials, all need special skills that are found in a perfect resource person. A well executed plan takes care of all the above mentioned factors. DECIDE WISELY!